Quarterly Report for the period ended 30 September 2024
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
23 October 2024
QUARTERLY REPORT FOR THE PERIOD ENDED
30 SEPTEMBER 2024
Canegrass Battery Minerals Project
•
Viking secured 100% of the Canegrass Project via the acquisition of Flinders
Canegrass Pty Ltd from Red Hawk Mining Limited. Redhawk held 51% of the Canegrass
Project.
•
Significant advancements made with the Canegrass Metallurgical Testwork,
focusing on improved V2O5 extraction, sulphide concentration and Titanium separation.
•
Roasting and leaching has been completed on 5kg of magnetic concentrate from the
Stage 2 Testwork, with 15 litres of vanadium solution produced.
•
The vanadium solution is now progressing through the next steps of the flowsheet to
produce a high purity V2O5 flake and electrolyte.
•
Gold identified for the first time in the Project with up to 0.33g/t assayed in the
magnetic concentrate. Further work required to determine the source of the
mineralisation and potential for value add to the Project.
•
Stage 3 Testwork: compositing completed on an 82kg sample from the Fold Nose
Deposit, with two separate LIMS tests competed to produce magnetic concentrate.
High mass pull, grades and recoveries achieved at both 150 and 500 micron grind sizes.
First Hit Project
•
Strategic review commenced of the high-grade First Hit Gold Mine, post the reporting
period, which is located within the Companies ~480km2 land package situated over the
Zuleika Shear in the Eastern Goldfields, Western Australia.
•
Strategic review will incorporate an assessment of the historic mine to determine any
resource potential and to identify priority drill targets for follow up exploration activity
with a focus on discovering new high-grade deposits.
Narndee Project Tenements
•
Four Exploration Licences, totalling ~75km2 and prospective for gold, PGE’s and Ni/Cu
Sulphides make up the Narndee Project. Prospectors have identified gold nuggets
across the tenure highlighting the prospectivity for gold in this new Project area.
Corporate
•
Strong cash position of $2.85M as of 30 September 2024
Viking Mines Limited (ASX:VKA) (“Viking” or “the Company”) is pleased to present its
quarterly activities report for the period ended 30 September 2024 (“September quarter”).
The Company’s focus during the reporting period was advancing metallurgical testwork
programmes at the Canegrass Battery Metals Project in Western Australia. The Company also
made the strategic decision to acquire the remaining 51% of the Project which puts the Project
solely under Vikings control.
A strategic review of the Company’s Gold assets was announced subsequent to the quarter
end with further updates planned in the December quarter.
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Commenting on the quarterly activities, Viking Mines Managing Director & CEO Julian
Woodcock said:
“The metallurgical testwork and confirmation of the optimal flowsheet are critical for the
development of the Canegrass Battery Mineral Project.
“We firstly need to ensure that we can produce V2O5 flake from the Project as well as looking at
maximising revenue through the recovery of other associated minerals. The Stage 3
metallurgical testwork is due shortly, which has the potential to add further value to the Project
via the recovery of copper, cobalt, nickel and gold.
“The acquisition of the remaining 51% of the Project provides low-cost exposure for
shareholders to the whole project value, whilst at the same time removing time based
constraints on the Farm-In expenditure commitments.
“At First Hit, we have commenced with a strategic review of both the resource potential at the
historic high-grade First Hit Gold Mine and also defining a number of high-grade targets across
the substantial tenement package of 480km2 which have the potential to host substantial highgrade gold deposits.
“We are well placed with our strong cash balance of $2.85M to continue to advance the
Company’s Projects for the benefit of our shareholders.”
Figure 1: Canegrass Location Plan
ASX:VKA | vikingmines.com
2
WESTERN AUSTRALIA
CANEGRASS BATTERY MINERALS PROJECT
During the reporting period, the Company made significant advancements with the Canegrass
Metallurgical Testwork, focusing on improved V2O5 extraction, sulphide concentration and
Titanium separation.
Stage 2 Metallurgical Testwork1
The Company successfully produced a V2O5 flake from samples taken at the Fold Nose
Deposit2. This was a critical milestone for the Company confirming the industry standard
process flowsheet can successfully be applied to the Canegrass Project material (Figure 2).
The current focus for the remaining 5kg sample from the Stage 2 Testwork was to refine and
optimise the process flowsheet and produce a high purity (>99%) V2O5 flake and vanadium
electrolyte. This was achieved through improvements in the extraction flowsheet and
modification to the reagents used in the extraction of the Vanadium from the magnetic
concentrate.
The roasting of the remaining sample was successfully completed during the reporting period,
with an 89.3% recovery of Vanadium into 15 litres of V2O5 solution. This is now undergoing
further steps to produce the high purity V2O5 flake and electrolyte. The Company anticipates
being able to provide results of the testwork in the coming months.
Figure 2: Schematic flowsheet showing industry standard flowsheet stages used to process Canegrass mineralisation
with the stages completed to date (dark blue) and the stages yet to be completed (grey).
1
2
Viking Mines (ASX:VKA) ASX Announcement 11 September 2024 – Canegrass Metallurgical Testwork Update
Viking Mines (ASX:VKA) ASX Announcement 20 May 2024 - Viking Produces Vanadium Pentoxide Flake from Canegrass
ASX:VKA | vikingmines.com
3
Stage 3 Metallurgical Testwork1
The focus of the Stage Three programme is to determine the possibility of producing a
sulphide concentrate to recover the Cu, Ni and Co minerals present at the Canegrass Project
from the non-magnetic tail produced as part of the Low Intensity Magnetic Separation (“LIMS”)
process.
Additionally, the Stage 3 Testwork aims to separate the Titanium bearing mineral Ilmenite
using a method of Electrostatic Separation from the magnetic concentrate.
82kg of composite sample has undergone two separate steps of magnetic separation, using
LIMS to produce the required material for the subsequent test stages.
Test 1: Sulphide Flotation1
75kg of composite sample was prepared to a P80 150micron (0.15mm) grind size and
processed using LIMS to produce 42kg of magnetic concentrate. The magnetic concentrate
delivered 56.4% mass pull at 1.27% V2O5 for 91.6% recovery and 11.7% TiO2 for 81.2%
recovery. Assays are still pending for the Iron grade.
These results are comparable to previous testwork3 for rougher LIMS, and it is expected that
the Vanadium grade would be increased with further regrinding and cleaning steps, however
this is not the focus of this testwork.
The 33kg of non-magnetic tail has been analysed at 0.11% Cu, 0.1% Ni and 0.03% Co,
recovering 68.3%, 46.3% and 55.3% respectively.
A bulk sulphide rougher flotation step has been completed on the non-magnetic tail (Figure
3) and delivered a sulphide concentrate, demonstrating proof of concept that the Cu, Ni and
Co sulphides are amenable to be separated from the feed material.
A three-stage flotation step was employed, progressively recovering more of the Cu, Ni and
Co through each step. The composition of the rougher sulphide concentrate at each of the
respective stages are shown in Table 1 below.
Table 1: Table of results of the sulphide concentration testwork completed on non-magnetic tail produced as part of
the magnetic separation process for samples collected from the Canegrass Project as part of the Stage 3
metallurgical testwork.
3
Viking Mines (ASX:VKA) ASX Announcement 6 March 2024 – VKA Achieves 1.43% V2O5 & 59% FE in High Quality Concentrate
ASX:VKA | vikingmines.com
4
Figure 3: Photo showing sulphide flotation testwork being undertaken on the non-magnetic tail.
Test 2: Titanium Separation1
7kg of composite sample was prepared using a coarse P80 500micron (0.5mm) grind size and
processed using LIMS to produce ~4kg of magnetic concentrate. A much coarser grind size
than tested previously was used as coarser material is required in the next step in the process
utilising Electrostatic Separation.
The LIMS separation has been determined to be very effective given the coarse grind size,
delivering a high 53.9% mass pull at 1.22% V2O5 for 81.7% recovery and 11.2% TiO2 for
74.9% recovery. Assays are still pending for the Iron grade. Whilst this is a lower Vanadium
recovery than the optimum levels of >90% achieved in previous LIMS testwork, it demonstrates
the potential for significant reduction in grind requirements, yet still maintaining overall high
vanadium recoveries. This will be further investigated by the Company in due course.
3.6kg of the magnetic concentrate produced was subsequently processed using the
Electrostatic Separation method as a sighter test. The testwork separated the concentrate
based on the physical (magnetic) properties of the minerals, with the details of the respective
separation quantities achieved shown below in Table 2.
60% of the material reported to the conductor, and distinctly variable quantities reporting to
the M1, M2 and M3 intermediate material types. Analysis of the differing products from the
electrostatic separation is shown in Table 3 below.
ASX:VKA | vikingmines.com
5
Table 2: Mass balance attained through Electrostatic Separation of magnetic concentrate.
Table 3: Analysis results for different product types achieved via electrostatic separation.
The assay results for the different material types reveals little difference in their chemical
composition. It is interpreted that the grind size used is not sufficient to liberate the different
mineral species in the feed material and as such has not proved effective in
concentrating/separating the Titanium contained within the concentrate.
Given the results received, the Company will not proceed with a bulk electrostatic separation
test. Instead, it plans to revisit the results and obtain mineralogy reports to assess if other
separation methods could be effective in concentrating/separating the titanium bearing
minerals found within the Canegrass mineralisation.
Viking Moves to 100% Ownership of Canegrass
During the quarter, the Company negotiated a transaction to acquire Flinders Canegrass Pty
Ltd, a subsidiary of Red Hawk Mining Limited (ASX:RHK) (“Red Hawk”) which increases the
Company’s ownership to 100% of the Canegrass Battery Minerals Project.
Flinders Canegrass Pty Ltd was acquired by Viking via a binding Share Sale Agreement (“SSA”)
entered in to with Red Hawk for the consideration of:
•
•
•
$175,000 cash payment;
33,333,333 shares in Viking (50% held in voluntary escrow for 3 months and 50% for 6
months); and
15,000,000 options exercisable at 2c with expiry 3 years from the date of issue.
ASX:VKA | vikingmines.com
6
FIRST HIT PROJECT – GOLD TARGETS
Subsequent to the end of the reporting period, the Company announced it has commenced
with a strategic review of the gold prospectivity within the First Hit Project. The strategic review
will incorporate an assessment of the historic high-grade First Hit Gold Mine to determine what
potential resource remains and identify priority targets for follow up across the Company’s
substantial 480km2 land package.
The Project has a number of very high-grade gold intercepts in and around the historic mine
that were not mined and have the potential to be converted into mineral resources with further
assessment.
Of significance is the 25km strike of the Zuleika Shear which runs through the Company
controlled tenure and has seen little bedrock drill testing. There are a number of significant
deposits in the region, with the closest being Ora Banda Mining’s (ASX:OBM) Riverina Mine
which is located 8km south of the First Hit Gold Mine and 4km west of the Company’s
tenements.
Subject to the outcome of the strategic review, the Company plans to undertake a programme
of reverse circulation (RC) drilling during the December quarter to test initial priority targets.
BUSINESS DEVELOPMENT – NEW TENEMENTS GRANTED
Canegrass Project
During the quarter tenement E59/2902 was granted at the Canegrass Project. Tenement
E58/319 is under application and E58/0621 is pending the outcome of a ballot. The
consolidated ground package at the Canegrass Project now stands at ~540km2 which
represents a substantial portion of the Windimurra Igneous Complex (251km2 granted and
289km2 under application). The additional ground has been strategically acquired to provide
both further optionality for the Project for infrastructure placement and due to the exploration
potential for Vanadium, Gold, PGE’s and Ni/Cu sulphides.
Narndee Project
The Company has been actively applying for tenure at a new Project area called Narndee,
which forms part of the Yalgoo Mineral Field and is located 85 km ESE from Mt Magnet WA
and 40km SSW from the Company’s Canegrass Project. The tenure currently stands at ~75km2.
The addition of these tenements provides exploration potential for gold, PGE’s and Ni/Cu
sulphides. Prospectors have been working on the tenements under Section 40E Permits which
grants rights to prospect with hand tools. Eight Section 40E permits have been granted and a
number of gold finds have been reported by the prospectors (as required by the terms of the
Section 40E). The reported finds align along a structural trend running through Exploration
Licence E59/2864 (Figure 4). Reports by the prospectors include:
• 89grams of gold found from 71 pieces
• 6.2 grams of gold found from 9 pieces
• 21 grams of gold founds from 23 pieces
• Weight not disclosed from 95 pieces
The Company is in progress of consolidating all available data for the Project tenements. Based
on data searches on WAMEX (the WA geoscience database), only limited surface sampling
and geochemistry has been conducted and very little drilling. At this time the Company has
not assessed any of the results in the data and just identified the data locations. As such, the
Company sees this as a compelling early-stage gold exploration target.
ASX:VKA | vikingmines.com
7
Figure 4; Viking Mines tenements at the Narndee Project overlain on geological map sheet with WAMEX database drillhole and
geochemical sample locations shown. Note the location of the gold finds reported by prospectors operating under Section 40E Permits.
ASX:VKA | vikingmines.com
8
CORPORATE
The Company has a strong cash position of $2.85M as of 30 September 2024.
Income for the period totalled $14k from investing activities (bank interest).
The Company’s cash position realised a net decrease of $1.05M over the June 2024 quarter
Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $131k in the quarter ending 30 September 2024. This amount
comprised Director fees for the relevant period.
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure on exploration and evaluation activities for the quarter predominantly
related to:
•
$117k: Exploration expenditure on the Canegrass Project, primarily ongoing metallurgical
testwork, consulting fees and Project study assessments.
•
$448k: Payments related to acquisition of tenements (farm-in expense for Canegrass to
acquire a further 24% of the Project and Stamp Duty costs for the First Hit Project).
•
$175k: Payments to Red Hawk Mining related to the acquisition of Flinders Canegrass Pty
Ltd to secure the remaining 51% of the Canegrass Project (taking Vikings ownership to
100%).
•
$148k: General corporate and administration costs.
•
$129k: Director fees and staff costs.
•
$61k loss was made due to exchange rate variations associated with the cash reserves held
in USD by the Company.
Other than as set out in this report, the Company undertook no other substantive exploration,
mining production and development activities during the quarter.
DECEMBER QUARTER PLANNED ACTIVITIES
The Company continues to make key advancements at the Canegrass Project and progressing
exploration activities across the First Hit Gold Project.
•
Final Stage 3 metallurgical testwork results are expected from the Canegrass Project.
•
Ongoing study advancements with the Canegrass Project.
•
Completion of the strategic review of the First Hit Gold Project, including;
•
o
Priority drill target identification and exploration strategy planning.
o
Drill programme planning and execution on priority targets.
Data consolidation for the Narndee Project.
CORPORATE OPPORTUNITIES
The Company continues to review and conduct due diligence on a vast array of mineral
acquisition opportunities, to complement the Company’s existing project portfolio, with the
objective of acquiring mature exploration assets with the potential to deliver long-term
shareholder returns.
ASX:VKA | vikingmines.com
9
The Board believes the Company is positioned to capitalise on some of the opportunities that
currently exist in the sector and has particular focus on acquiring advanced future metal
projects. The Company will update the market should any of these opportunities that are being
reviewed proceed to a more formal stage in line with the Company’s continuous disclosure
obligations.
-ENDThis announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
+61 8 6245 0870
Forward-Looking Statements
This announcement may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and
similar expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the
information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS
Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr
Connelly has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
ASX:VKA | vikingmines.com
10
APPENDIX 1 – TENEMENTS HELD OR WITH AN AGREEMENT TO ACQUIRE
AN EQUITY INTEREST AS AT 30 SEPTEMBER 2024
Project
Licence
name
Location
License
type
Licence Holder/ JV
Partners i
Viking
Ownership/
Involvement
Granted
To
Comments
ii
M30/0091
M30/0099
P30/1144
P30/1137
First Hit Project
E29/1133
E30/0529
P29/2652
P30/1162
Western
Australia
P30/1163
E29/1131
E30/0570
E30/0571
E30/505
E30/0517
P58/1943
P58/1942
Canegrass Project
E58/0604
E58/0619
E58/0621
E59/2902
E58/0232
Western
Australia
E58/0236
E58/0282
E58/0520
E58/0521
E58/0522
Narndee
Project
E59/2864
E59/2865
E59/2866
E59/2867
i)
ii)
Western
Australia
Mining
Licence
Mining
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Prospecting
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Red Dirt Mining Pty Ltd
100%
15 Mar 32
Red Dirt Mining Pty Ltd
100%
26 Dec 32
Red Dirt Mining Pty Ltd
100%
26 Feb 28
Red Dirt Mining Pty Ltd
100%
16 Jul 27
Viking Mines Ltd
100%
04 Jan 27
Viking Mines Ltd
100%
20 Feb 27
Viking Mines Ltd
100%
18 Oct 26
Viking Mines Ltd
100%
03 Dec 27
Viking Mines Ltd
100%
03 Dec 27
Viking Mines Ltd
100%
30 Apr 29
Viking Mines Ltd
0%
Viking Mines Ltd
0%
Viking Mines Ltd
95%
06 Jun 29
Baudin Resources Pty Ltd.
0%
29 Jul 25
Viking Critical Minerals Pty Ltd
100%
28 Mar 27
Viking Critical Minerals Pty Ltd
100%
08 Oct 27
Viking Critical Minerals Pty Ltd
100%
25 Oct 28
Viking Critical Minerals Pty Ltd
0%
Viking Critical Minerals Pty Ltd
0%
Viking Critical Minerals Pty Ltd
To be
granted
To be
granted
Under application
Under application
Option over exclusive area
over part of the tenement
To be
granted
To be
granted
Subject to Ballot to be held
on 25th October 2024
0%
19 Sep 29
Under application
100%
28 Jul 25
100%
21 Mar 25
100%
02 May 25
100%
13 Sep 27
100%
13 Sep 27
100%
13 Sep 27
Viking Mines Ltd
100%
03 Jan 29
Viking Mines Ltd
0%
To be
granted
Viking Mines Ltd
100%
03 Jan 29
Viking Mines Ltd
100%
03 Jan 29
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Viking Critical Minerals Pty Ltd/
Flinders Canegrass Pty Ltd
Under application
Under application
Red Dirt Mining Pty Ltd, Viking Critical Minerals Pty Ltd and Flinders Canegrass Pty Ltd are 100% owned subsidiaries of Viking Mines Ltd.
Granted tenure unless otherwise stated.
ASX:VKA | vikingmines.com
11
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VIKING MINES LIMITED
ABN
Quarter ended (“current quarter”)
38 126 200 280
30 SEPTEMBER 2024
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(3 months)
$A’000
11
11
(117)
(117)
(d) staff costs
(129)
(129)
(e) administration and corporate costs
(148)
(148)
14
14
3
3
(366)
(366)
(a) entities
(175)
(175)
(b) tenements
(275)
(275)
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
1.9
Net cash from / (used in) operating
activities
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
(173)
(173)
2.6
Net cash from / (used in) investing
activities
(623)
(623)
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
-
-
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
3,898
3,898
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
(366)
(366)
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(623)
(623)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
(62)
(62)
4.6
Cash and cash equivalents at end of
period
2,847
2,847
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
2,847
3,898
2,847
3,898
Current quarter
$A'000
131
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
(366)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
(623)
8.3
Total relevant outgoings (item 8.1 + item 8.2)
(989)
8.4
Cash and cash equivalents at quarter end (item 4.6)
2,847
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available funding (item 8.4 + item 8.5)
8.7
Estimated quarters of funding available (item 8.6 divided by
item 8.3)
$A’000
2,847
2.88
Note: if the entity has reported positive relevant outgoings (ie a net cash inflow) in item 8.3, answer item 8.7 as “N/A”.
Otherwise, a figure for the estimated quarters of funding available must be included in item 8.7.
8.8
If item 8.7 is less than 2 quarters, please provide answers to the following questions:
8.8.1
Does the entity expect that it will continue to have the current level of net operating
cash flows for the time being and, if not, why not?
Answer: N/A
8.8.2
Has the entity taken any steps, or does it propose to take any steps, to raise further
cash to fund its operations and, if so, what are those steps and how likely does it
believe that they will be successful?
Answer: N/A
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 4
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
8.8.3
Does the entity expect to be able to continue its operations and to meet its business
objectives and, if so, on what basis?
Answer: N/A
Note: where item 8.7 is less than 2 quarters, all of questions 8.8.1, 8.8.2 and 8.8.3 above must be answered.
Compliance statement
1
This statement has been prepared in accordance with accounting standards and policies which
comply with Listing Rule 19.11A.
2
This statement gives a true and fair view of the matters disclosed.
Date:
22 October 2024
...................................................................................
The Board of Viking Mines Ltd
Authorised by: ...................................................................................
(Name of body or officer authorising release – see note 4)