Half Yearly Report and Accounts
Released
Released
Announcement PDF
HALF YEAR
REPORT
FO R TH E 6 M O NTH PER I O D
EN D I N G 3 1 D ECEM B ER 2024
ASX:VK A
Contents
3
Corporate Directory
4
Review of Operations
11
Directors' Report
13
Auditors Independence Report
14
Financial Statements
18
Notes to the Financial Statements
22
Directors’ Declaration
23
Independent Auditor's Review to the Members
2
Corporate Directory
Board of Directors
Charles Thomas
Non-Executive Chairman
Bevan Tarratt
Non-Executive Director
Michael Cox
Non-Executive Director
Julian Woodcock
Managing Director and CEO
Company Secretary
Michaela Stanton-Cook
Registered Office and principal place of business
15-17 Old Aberdeen Place
West Perth WA 6005
Telephone: 08 6245 0870
Email: contact@vikingmines.com
Website: www.vikingmines.com
Share Registry
Automic Pty Ltd
Level 5, 191 St Georges Terrace, Perth WA 6000
Telephone: 1300 288 664 (within Australia)
Telephone: 02 9698 5414 (outside Australia)
Email: hello@automic.com.au
Auditors
BDO Audit Pty Ltd
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth WA 6000
Solicitors
Bennett, Litigation and Commercial Law
Level 14, Westralia Square
141 St Georges Terrace
Perth WA 6000
Securities Exchange Listing
Shares in Viking Mines Limited are quoted on the Australian Securities Exchange under trading code
VKA.
3
Review of Operations
For the half-year ended 31 December 2024
Viking Mines Limited’s (ASX: VKA) (“Viking” or “the Company”) focus for the reporting
period was advancing the Canegrass Battery Minerals Project (“Canegrass” or “the
Project”), located in the Murchison Region, Western Australia. In addition, a strategic
review and exploration activities commenced at the First Hit Gold Project, located within
the Company’s approximate 480km2 land package situated over the Zuleika Shear in the
Eastern Goldfields, Western Australia.
Western Australia
First Hit Gold Project
The Company commenced a strategic review of the gold prospectivity1 within the First Hit
Project (“the Project” or “First Hit”). The strategic review included an assessment of the
historic high-grade First Hit Gold Mine, located 45 km west of Menzies and 2 hours north of
Kalgoorlie in the Eastern Goldfields region of Western Australia, to determine what
potential resource remains, and identifying of priority targets for follow up across the
Company’s substantial 480km2 land package.
Mineral Resource Estimate by MEC Mining
Viking engaged MEC Mining, a leading global technical consulting firm dedicated to
servicing the mining industry, to undertake a mineral resource assessment of the First Hit
Gold Mine, which focussed on the following aspects of the First Hit Deposit:
1.
2.
3.
4.
Geological model of mineralisation
Pegmatite model which stopes out mineralisation
Extent of historical mine workings
Potential for remaining unmined mineralisation
This assessment was aimed at informing the Company of whether there is potential for
remaining unmined mineralisation that has the potential to be economic in the current high
gold price climate.
Post the reporting period, the Company announced the definition of an Inferred Mineral
Resource Estimate of 83.8kt @ 7.0g/t Au for 19,000 ounces2 for the historical First Hit
Mine. The existing decline at First Hit extends to 220m below surface, providing an
opportunity to access the mineralisation, subject to dewatering.
1
2
Viking Mines (ASX:VKA) ASX Announcement 10 October 2024 – First Hit Gold Project Strategic Review Commences
Viking Mines (ASX:VKA) ASX Announcement 20 January 2025 – Viking Defines High-Grade Gold Resource at First Hit Mine
4
Review of Operations
For the half-year ended 31 December 2024
Drill Programme
Viking engaged Topdrill Pty Ltd to undertake a drilling programme at the First Hit Gold
Project, consisting of ~5,000m of Reverse Circulation (“RC”) drilling for initial testing of
priority targets within Viking’s 25km strike of the Zuleika Shear.
This initial phase 1 drilling was subsequently increased to include additional holes, bringing
the total quantity to ~7,400m and forms part of an expanded First Hit Gold Project drilling
programme of up to ~20,000 metres of RC drilling.
Phase 1 drilling commenced in November and continued into December, with 46%
complete for 2,670m and 25 holes drilled during the reporting period. Drilling of the near
mine targets at Jana’s Reward, First Hit North and First Hit South were completed along with
the first drill traverse at Bifrost (formerly Northern Duplex Target). Drilling encountered
zones of biotite alteration, silicification and sulphide mineralisation which confirms the
presence of significant shear zones within the Bifrost target area.
Unfortunately, drilling was slightly delayed due to unseasonably high rainfall events
resulting in days where drilling was unable to proceed. The Company took the prudent,
cost effective and safe decision to suspend drilling until the New Year with drilling
completed after the reporting period for the remaining three drill traverses at Bifrost
situated in the northern part of the Company’s controlled 25km strike length of the Zuleika
Shear.
The initial phase 1 drill programme has two focus areas for drill testing:
1. First Hit - Near mine drill testing, following up on previously intersected
mineralisation to establish grade continuity and growth potential.
2. Zuleika Shear - Greenfields drill testing to assess the potential of the significant
strike length of the Zuleika Shear which has seen little effective bedrock exploration.
Bifrost (formerly Northern Duplex Target)
The completion of the first drill traverse at Bifrost is the first complete drill section to be
undertaken across this prospective target. Initial observations confirmed the presence of
multiple shear zones across the target and are defined by zones of intense foliation and
biotite alteration. This confirms the presence of the shear zones interpreted from the
magnetic geophysics which the Company is targeting to assess if they are gold bearing.
The country rocks alternate between basalt and ultramafic.
After the reporting period, assay results 3,4,5 were received for the first and second drill
traverses completed at Bifrost with several zones of anomalous gold intersected. The
strongest of initial results from the first traverse is a broad intercept in VKRC0083 of 27m
at 0.4g/t Au (>0.1g/t cut-off) from 69m. Within this zone there are multiple intercepts
reporting >1g/t:
Viking Mines (ASX:VKA) ASX Announcement 3 February 2025 – Viking Discovers Gold at Northern Duplex Greenfields Target
ASX Announcement 18 February 2025 – Viking Confirms Discovery at Northern Duplex Target
5
ASX Announcement 25 February 2025 – Viking Hits Gold in 2nd Regional Drill Traverse, 1.7km South
3
4
5
Review of Operations
For the half-year ended 31 December 2024
•
1m at 2.9g/t Au from 76m
•
1m at 1.1g/t Au from 81m
• 1m at 1.5g/t Au from 91m
In addition, further results from the first traverse confirmed the presence of a steeply
dipping gold zone, interpreted to extend to surface. Drilling returned a broad downhole
intercept in VKRC0068 containing multiple +1g/t Au intercepts featuring:
•
17m at 1.1g/t Au from 28m including:
o 1m at 1.6g/t Au from 28m; and
o 2m at 3.1g/t Au from 34m; and
o 3m at 1.3g/t Au from 38m
Drilling on the second traverse confirmed the presence of gold across the first two wide
spaced drill traverses 1.7km apart, returning two >1g/t Au intercepts in VKRC0103:
•
•
5m at 1.0g/t Au from 102m
3m at 1.3g/t Au from 115m
Multiple other anomalous >40ppb Au zones have also been encountered, confirming
several gold bearing pathways across the ~1.2km wide E-W drill traverse, with individual
metres reporting up to 2.3g/t Au (VKRC0117 from 98m).
Following on the success of regional drilling to date, an infill auger drilling programme was
commenced to reduce the sample spacing from the broad 100m x 400m grid to a 20m x
100m grid.
The purpose of this infill auger sampling is to better define the target anomalies/zones
identified in the RC drill traverses at Bifrost. The results of this programme will allow more
precise and targeted drill testing to take place. This approach will ensure the company
focusses on the highest tenor anomalies with the highest chance of success.
Canegrass Battery Minerals Project
During the reporting period, the Company made significant advancements with the
Canegrass Metallurgical Testwork, focusing on improved V2O5 extraction, sulphide
concentration and Titanium separation.
Stage 2 Metallurgical Testwork6
The Company successfully produced a V2O5 flake from samples taken at the Fold Nose
Deposit7. This was a critical milestone for the Company confirming the industry standard
process flowsheet can successfully be applied to the Canegrass Project material.
The current focus for the remaining 5kg sample from the Stage 2 Testwork was to refine
and optimise the process flowsheet and produce a high purity (>99%) V 2O5 flake and
vanadium electrolyte. This was achieved through improvements in the extraction flowsheet
and modification to the reagents used in the extraction of the Vanadium from the magnetic
concentrate.
6
7
Viking Mines (ASX:VKA) ASX Announcement 11 September 2024 – Canegrass Metallurgical Testwork Update
Viking Mines (ASX:VKA) ASX Announcement 20 May 2024 - Viking Produces Vanadium Pentoxide Flake from Canegrass
6
Review of Operations
For the half-year ended 31 December 2024
The roasting of the remaining sample was successfully completed during the reporting
period, with an 89.3% recovery of Vanadium into 15 litres of V2O5 solution. This is now
undergoing further steps to produce the high purity V2O5 flake and electrolyte.
Stage 3 Metallurgical Testwork6
The focus of the Stage Three programme is to determine the possibility of producing a
sulphide concentrate to recover the Cu, Ni and Co minerals present at the Canegrass
Project from the non-magnetic tail produced as part of the Low Intensity Magnetic
Separation (“LIMS”) process.
Additionally, the Stage 3 Testwork aims to separate the Titanium bearing mineral Ilmenite
using a method of Electrostatic Separation from the magnetic concentrate.
82kg of composite sample has undergone two separate steps of magnetic separation,
using LIMS to produce the required material for the subsequent test stages.
Test 1: Sulphide Flotation1
75kg of composite sample was prepared to a P80 150micron (0.15mm) grind size and
processed using LIMS to produce 42kg of magnetic concentrate. The magnetic concentrate
delivered 56.4% mass pull at 1.27% V2O5 for 91.6% recovery and 11.7% TiO2 for
81.2% recovery.
These results are comparable to previous testwork8 for rougher LIMS, and it is expected
that the Vanadium grade would be increased with further regrinding and cleaning steps,
however this is not the focus of this testwork.
The 33kg of non-magnetic tail has been analysed at 0.11% Cu, 0.1% Ni and 0.03% Co,
recovering 68.3%, 46.3% and 55.3% respectively.
A bulk sulphide rougher flotation step has been completed on the non-magnetic tail and
delivered a sulphide concentrate, demonstrating proof of concept that the Cu, Ni and Co
sulphides are amenable to be separated from the feed material.
A three-stage flotation step was employed, progressively recovering more of the Cu, Ni and
Co through each step.
Test 2: Titanium Separation6
7kg of composite sample was prepared using a coarse P80 500micron (0.5mm) grind size
and processed using LIMS to produce ~4kg of magnetic concentrate. A much coarser grind
size than tested previously was used as coarser material is required in the next step in the
process utilising Electrostatic Separation.
The LIMS separation has been determined to be very effective given the coarse grind size,
delivering a high 53.9% mass pull at 1.22% V2O5 for 81.7% recovery and 11.2% TiO2
for 74.9% recovery. Whilst this is a lower Vanadium recovery than the optimum levels of
>90% achieved in previous LIMS testwork, it demonstrates the potential for significant
reduction in grind requirements yet still maintaining overall high vanadium recoveries. This
will be further investigated by the Company in due course.
8
Viking Mines (ASX:VKA) ASX Announcement 6 March 2024 – VKA Achieves 1.43% V2O5 & 59% FE in High Quality Concentrate
7
Review of Operations
For the half-year ended 31 December 2024
3.6kg of the magnetic concentrate produced was subsequently processed using the
Electrostatic Separation method as a sighter test. The testwork separated the concentrate
based on the physical (magnetic) properties of the minerals.
60% of the material reported to the conductor, and distinctly variable quantities reporting
to the M1, M2 and M3 intermediate material types.
The assay results for the different material types reveals little difference in their chemical
composition. It is interpreted that the grind size used is not sufficient to liberate the different
mineral species in the feed material and as such has not proved effective in
concentrating/separating the Titanium contained within the concentrate.
Given the results received, the Company will not proceed with a bulk electrostatic
separation test. Instead, it plans to revisit the results and obtain mineralogy reports to assess
if other separation methods could be effective in concentrating/separating the titanium
bearing minerals found within the Canegrass mineralisation.
100% Ownership of Canegrass9
The Company negotiated a transaction to acquire Flinders Canegrass Pty Ltd, a subsidiary
of Red Hawk Mining Limited (ASX:RHK) (“Red Hawk”) which increased the Company’s
ownership to 100% of the Canegrass Battery Minerals Project.
Flinders Canegrass Pty Ltd was acquired by the Company via a binding Share Sale
Agreement (“SSA”) entered in to with Red Hawk for the consideration of:
•
•
•
$175,000 cash payment;
33,333,333 shares in Viking (50% held in voluntary escrow for 3 months and 50% for
6 months); and
15,000,000 options exercisable at 2c with expiry 3 years from the date of issue.
New Tenements Granted
During the reporting period tenements E58/619, E58/621 & E59/2902 were granted at the
Canegrass Project. The consolidated ground package of granted tenements at the
Canegrass Project now stands at ~540km2 which represents a substantial portion of the
Windimurra Igneous Complex. In addition, an application was submitted for tenement
E59/2950 (42km2) which is pending grant.
The additional ground has been strategically acquired to provide both further optionality
for the Project for infrastructure placement and due to the exploration potential for
Vanadium, Gold, PGE’s and Ni/Cu sulphides.
Narndee Project
The Company has been actively applying for tenure at a new Project area called Narndee,
which forms part of the Yalgoo Mineral Field and is located 85 km ESE from Mt Magnet WA
and 40km SSW from the Company’s Canegrass Project. The tenure currently stands at
~75km2.
9
Viking Mines (ASX:VKA) ASX Announcement 5 September 2024 – Viking Moves to 100% Ownership of Canegrass Project
8
Review of Operations
For the half-year ended 31 December 2024
The addition of these tenements provides exploration potential for gold, PGE’s and Ni/Cu
sulphides. Prospectors have been working on the tenements under Section 40E Permits
which grants rights to prospect with hand tools. Multiple Section 40E permits have been
granted and a number of gold finds have been reported by the prospectors (as required
by the terms of the Section 40E). The reported finds align along a structural trend running
through Exploration Licence E59/2864 (Figure 4). Reports by the prospectors include:
•
•
•
•
89grams of gold found from 71 pieces
6.2 grams of gold found from 9 pieces
21 grams of gold founds from 23 pieces
Weight not disclosed from 95 pieces
The Company is in progress of consolidating all available data for the Project tenements.
Based on data searches on WAMEX (the WA geoscience database). At this time the
Company has not assessed any of the results in the data and just identified the data
locations. As such, the Company sees this as a compelling early-stage gold exploration
target.
Corporate
Board
There were no changes to the board during the reporting period.
Capital Raising to Advance Exploration
On 18 November 2024, the Company announced an equity placement to raise
approximately A$2.39 million (before costs) (Placement). Funds raised from the Placement
have and will be deployed towards expansion of RC Drilling and additional exploration
activities at the First Hit Gold Project.
The Placement comprised the issue of approximately 265.5 million new fully paid ordinary
shares in the Company to sophisticated and professional investors at an issue price of
$0.009 per share (Placement Shares).
The Placement Shares were issued utilising the Company’s ASX Listing Rule 7.1 and 7.1A
capacity. The Company engaged Euroz Hartleys Limited as Lead Manager to the
Placement, who were granted 50,000,000 Lead Manager Options in addition to their Lead
Manager Fee, subject to Shareholder approval, with an exercise price of $0.03 and expiry
date of 3 years from their date of issue.
Following the reporting period the Company held a general meeting of shareholders on
12 February 2025, where the issue of Placement Shares was approved, refreshing the ASX
Listing Rule 7.1 and 7.1A capacity. Additionally, the Lead Manager Options were approved
and subsequently issued on the same day.
Administrative Matters
The Company held its Annual General Meeting of shareholders on 13 November 2024 at
which all resolutions put to shareholders were approved.
9
Review of Operations
For the half-year ended 31 December 2024
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Target, Exploration Results is based on information
compiled by Mr Julian Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy
(MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd. Mr Woodcock has sufficient
experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the
disclosure of the information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resources
The information in this report that relates to the Mineral Resource estimate is derived from information compiled
by Mr Dean O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and
Competent Person for this style of mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is
employed by MEC Mining, an independent mining and exploration consultancy. Mr O’Keefe has sufficient
experience relevant to the style of mineralisation and type of deposit under consideration and to the activity
which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian Code
for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr O’Keefe
consents to the inclusion in the report of the matters based on the results in the form and context in which they
appear. The Company is not aware of any new information or data that materially affects the information
included in the original market announcements and that all material assumptions and technical parameters
underpinning the estimates in the relevant market announcement continue to apply and have not materially
changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcements on 20 January 2025 and 20
November 2023.
Competent Person Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately
represent the information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a
full-time employee of METS Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The
Australasian Institute of Mining and Metallurgy. Mr Connelly has sufficient experience which is relevant to the
style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify
as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration
Results, Exploration Targets, Mineral Resources and Ore Reserves. The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the
original market announcement on 11 September 2024.
10
Review of Operations
For the half-year ended 31 December 2024
The Directors present their report, together with the financial statements, on the Consolidated Entity
comprising Viking Mines Limited (the Company or Viking) and its controlled entities (the Group) for the
half-year ended 31 December 2024.
Directors
The following persons held office as Directors of the Company from the start of the financial year to the
date of this report, unless otherwise stated.
Name
Charles Thomas
Title
Non-Executive Chairman
Bevan Tarratt
Non-Executive Director
Michael Cox
Non-Executive Director
Julian Woodcock
Managing Director and CEO
Company Secretary
Michael Stanton-Cook
Principal Activities
The principal activities of the consolidated entity during the financial period were investment and
exploration in mineral exploration projects.
Dividends
No dividends were paid, recommended or declared during the current financial year.
Review of Operations
The net loss after income tax for the half-year was $1,145,979 (2023: $1,790,977). A more detailed review
of operations is included in the Operations Report accompanying this half-year report.
Rounding of amounts
The company is of a kind referred to in Corporations Instrument 2016/191, issued by the Australian
Securities and Investments Commission, relating to 'rounding-off'. Amounts in this report have been
rounded off in accordance with that Corporations Instrument to the nearest dollar.
Significant changes in the state of affairs
There were no significant changes in the state of affairs of the consolidated entity during the financial halfyear.
Events Subsequent to the End of the Reporting Period
Subsequent to the Reporting Period, at the General Meeting of Shareholders held on 12 February 2025,
Shareholders ratified the issue of securities under the Placement to replenish the Company's
placement capacity under ASX Listing Rule. 7.1 and 7.1A, enabling the Company to have the capacity to
raise further funds or otherwise issue securities without further shareholder approval.
There are no other matters or circumstances that have arisen since 31 December 2024 that have
significantly affected, or may significantly affect the Group’s operations, the results of those operations, or
the Group’s state of affairs in future financial years
11
Directors Report
For the half-year ended 31 December 2024
Auditor’s independence declaration
A copy of the auditor's independence declaration as required under section 307C of the
Corporations Act 2001 is set out immediately after this Directors report.
This report is made in accordance with a resolution of Directors, pursuant to section 303(5)9a) of the
Corporations Act 2001.
Charles Thomas
Non-Executive Chairman
10 March 2025
12
Tel: +61 8 6382 4600
Fax: +61 8 6382 4601
www.bdo.com.au
Level 9, Mia Yellagonga Tower 2
5 Spring Street
Perth, WA 6000
PO Box 700 West Perth WA 6872
Australia
DECLARATION OF INDEPENDENCE BY PHILLIP MURDOCH TO THE DIRECTORS OF VIKING MINES
LIMITED
As lead auditor for the review of Viking Mines Limited for the half-year ended 31 December 2024,
I declare that, to the best of my knowledge and belief, there have been:
1.
No contraventions of the auditor independence requirements of the Corporations Act 2001 in
relation to the review; and
2.
No contraventions of any applicable code of professional conduct in relation to the review.
This declaration is in respect of Viking Mines Limited and the entities it controlled during the period.
Phillip Murdoch
Director
BDO Audit Pty Ltd
Perth
10 March 2025
BDO Audit Pty Ltd ABN 33 134 022 870 is a member of a national association of independent entities which are all members of A.C.N. 050 110 275 Ltd ABN 77 050 110 275,
an Australian company limited by guarantee. BDO Audit Pty Ltd and A.C.N. 050 110 275 Ltd are members of BDO International Ltd, a UK company limited by guarantee, and
form part of the international BDO network of independent member firms. Liability limited by a scheme approved under Professional Standards Legislation
Consolidated Statement of Profit or Loss and Other
Comprehensive Income
For the half-year ended 31 December 2024
Notes
31 Dec 2024
31 Dec 2023
$
$
Interest
27,422
51,740
Other income
35,693
-
(663,352)
(1,121,514)
(541,094)
(719,837)
(4,648)
(1,366)
(1,145,979)
(1,790,977)
-
-
(1,145,979)
(1,790,977)
Foreign currency translation
(13,623)
236,088
Other comprehensive income for the period
attributable to owners of the Company
(13,623)
236,088
Total comprehensive income for the half-year
(1,159,602)
(1,554,889)
Cents
Cents
(0.11)
(0.17)
Expenses
Administrative and employee expenses
Expenses relating to exploration and evaluation
Finance expenses
Loss before income tax expense
4
Income tax expense
Loss after income tax expense for the half-year
Other comprehensive income
Items that may be reclassified subsequently to
profit or loss:
Basic and diluted loss per share
The above statement should be read in conjunction with the accompanying notes.
14
Consolidated Statement of Financial Position
As at 31 December 2024
Notes
31 Dec 2024
30 Jun 2024
$
$
Current assets
Cash and cash equivalents
4,768,196
3,899,615
Other receivables
120,469
73,817
Total current assets
4,888,665
3,973,432
5,584,781
4,808,699
165,670
-
Total non-current assets
5,750,451
4,808,699
Total assets
10,639,116
8,782,131
Trade and other payables
753,644
523,538
Lease liabilities
62,990
-
Provisions
33,889
41,925
Tax liabilities
1,012,847
1,012,847
Total current liabilities
1,863,370
1,578,310
Provisions
25,049
22,033
Lease liabilities
104,711
-
Total non-current liabilities
129,760
22,033
Total liabilities
1,993,130
1,600,343
Net assets
8,645,986
7,181,788
34,392,006
31,902,027
Non-current assets
Exploration and evaluation
5
Right-of-use assets
Current liabilities
Non-current liabilities
Equity
Issued capital
Reserves
6
(264,073)
(384,271)
Accumulated losses
(25,481,947
(24,335,968)
Total equity
8,645,986
7,181,788
The above statement should be read in conjunction with the accompanying notes.
15
Consolidated Statement of Changes in Equity
For the half-year ended 31 December 2024
Balance at 1 Jul 2023
Issued capital
Reserves
Accumulated
losses
Total equity
$
$
$
$
31,902,027
(588,290)
(21,774,855)
9,538,882
Loss for the period
-
-
(1,790,977)
(1,790,977)
Other comprehensive income
for the year
-
236,088
-
236,088
Total comprehensive loss for
the period
-
236,088
(1,790,977)
(1,554,889)
Transactions with owners in
their capacity as owners:
Performance Rights Issued
103,834
103,834
Balance as at 31 Dec 2023
31,902,027
(248,368)
(23,565,832)
8,087,827
Balance at 1 Jul 2024
31,902,027
(384,271)
(24,335,968)
7,181,788
(1,145,979)
(1,145,979)
Loss for the period
-
Other comprehensive income
for the year
-
(13,623)
-
(13,623)
Total comprehensive loss for
the period
-
(13,623)
(1,145,979)
(1,159,602)
Transactions with owners in
their capacity as owners:
Shares issued during the year
2,656,667
2,656,667
Share based payment
74,406
74,406
Options issued
59,415
59,415
Transaction costs
Balance as at 31 Dec 2024
(166,688)
34,392,006
(166,688)
(264,073)
(25,481,947)
8,645,986
The above statement should be read in conjunction with the accompanying notes.
16
Consolidated Statement of Cash Flows
For the half-year ended 31 December 2024
31 Dec 2024
31 Dec 2023
$
$
Cash flows from operating activities
Payments to suppliers and employees
(919,116)
(2,089,092)
Interest received
27,422
51,740
Interest expense
(10,072)
(1,366)
Other income
35,693
-
-
3,167,421
(866,073)
1,128,703
(450,000)
(225,000)
6,068
(385)
(443,932)
(225,385)
(31,103)
(35,765)
Capital raise (after transaction costs)
2,223,312
-
Net cash outflow from financing activities
2,192,209
(35,765)
Proceeds from legal dispute
Net cash inflow/ (outflow) from operating activities
Cash flows from investing activities
Payments for expenses relating to Farm-In and acquisition
of Flinders Canegrass Pty Ltd
Payment of security deposit
Net cash outflow from investing activities
Cash flows from financing activities
Repayment of lease liabilities
Net increase/ (decrease) in cash and cash equivalents
882,204
867,553
Cash and cash equivalents at the beginning of the half year
3,899,615
4,132,137
Effects of exchange rate changes on cash and cash
equivalents
(13,623)
88,970
Cash and cash equivalents at the end of the half year
4,768,196
5,088,660
The above statement should be read in conjunction with the accompanying notes.
17
Notes to the Consolidated Financial Statements
For the half-year ended 31 December 2024
1
Corporate information
The consolidated financial report of Viking Mines Limited and its subsidiaries (together referred to as the
“the “Group”) for the interim half-year ended 31 December 2024 was authorised for issue in accordance
with a resolution of the Directors on 10 March 2025.
Viking Mines Limited (the “Company” or “Viking”) is a for-profit company limited by shar