High-grade Inferred Mineral Resource Estimate (MRE) of 83.8k tonnes at 7.0g/t Au for
19.0k ounces (JORC 2012) for the historical First Hit Gold Mine
•
Located on Viking’s 100% owned and granted Mining Lease, surrounded by several
operating mills
•
MRE represents the remaining mineralisation after accounting for mining depletion due
to previously mined ore
•
The existing decline extends to ~220m below surface and provides an opportunity to
access the mineralisation (subject to dewatering)
•
Opportunity remains for mineralisation to extend beyond current drilled limits
•
Work underway to define a high-grade JORC exploration target for the depth
extensions to First Hit and the Company to investigate options for drilling
Viking Mines Limited (ASX: VKA) ("Viking" or “the Company") is pleased to announce a JORC
(2012) compliant Inferred Mineral Resource Estimate (“MRE”) report for the First Hit Gold Mine of
83.8kt at 7.0g/t Au for 19.0k oz gold.
The MRE represents the remaining mineralisation at the First Hit Gold Mine after accounting for
mining depletion from when the mine was last in operation in 2002. The First Hit deposit is located
on the Company’s 100% owned and granted Mining Lease M30/99.
Viking Mines Managing Director & CEO Julian Woodcock said:
“I am pleased to be able to announce a high-grade Mineral Resource Estimate for the historical
First Hit Gold Mine, located on the Company’s 100% owned and granted Mining Lease.
The high-grade gold mineral resource, combined with the existing underground infrastructure,
proximity to several operating mills and current record gold price environment provides significant
optionality to be immediately assessed by Viking.
We will continue to assess the asset and the opportunities it brings, in parallel with our ongoing
regional exploration programme that is currently underway.
I look forward to providing updates to market as we continue to work on our expansive and
prospective land position.”
FIRST HIT MINERAL RESOURCE ESTIMATE
The MRE has been completed by MEC Mining with details of the estimation methodology
provided in this ASX release and associated JORC tables in the Appendices.
The MRE incorporates all the historical data for the deposit and involved creating new wireframes
of the mineralisation. A block model was created within the wireframes and gold estimated using
ordinary kriging to produce an undepleted model (Figure 1). This model was then subsequently
depleted using the digitised models created for the underground development drives and stopes
from the historical mining records (Figure 2 and Figure 3).
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
First Hit was last in operation in 2002 when the gold price was ~US$325/oz and was modelled at
a cut-off grade of 2.0g/t.
Across all levels of the mine, which are accessed by the historical underground development,
there remains mineralisation that was not extracted due to being below the operating cut-off
grade at the time. It is this mineralisation that Viking has remodelled and forms the basis for this
MRE. In addition, there remains mineralisation below the extents of the historical workings which
has also been included in this MRE.
Figure 1; Long section view looking west showing the undepleted January 2025 MRE for the First Hit Deposit.
ASX:VKA | vikingmines.com
2
Figure 3; Long section looking west showing January 2025 MRE and historical underground workings at the First Hit
Deposit.
Figure 2; Long section looking west showing the depleted January 2025 MRE of 83.8Kt at 7.0g/t Au for 19.0Koz Au.
ASX:VKA | vikingmines.com
3
NEXT STEPS
Following the establishment of a JORC MRE for the First Hit deposit, the Company can commence
further assessments to determine potential strategies to extract value from the mineral resource
for the benefit of Viking shareholders. Key next steps include:
•
Assessing the opportunities at depth with the intention of defining a JORC (2012)
Exploration Target for down dip extensions of the orebody.
•
Determine de-watering and rehabilitation costs to gain access to the underground workings.
•
Determine high level estimates of underground mining and operating costs.
•
Review options to undertake a Minable Shape Optimiser (“MSO”) evaluation on the MRE to
determine which portions of the mineral resource could be mined economically using
underground mining methods.
•
Complete Phase 1 regional exploration programme targeting new discoveries over
greenfields targets on existing tenements.
We look forward to providing updates to market as further advancements are made with the
Project.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Viking Mines Limited’s planned exploration program and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should,"
and similar expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations
reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no
assurance can be given that actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who
is a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time
employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resource Estimate
The information in this announcement that relates to the Mineral Resource estimate is derived from information compiled by
Mr Dean O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and Competent Person
for this style of mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC, an independent
mining and exploration consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the
2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC
Code). The Competent Person is not aware of any new information or omission of data that may materially affect the stated
Mineral Resource estimate.
ASX:VKA | vikingmines.com
4
MINERAL RESOURCE ESTIMATE METHODOLOGY — ASX LISTING RULE 5.8.1
Viking Mines engaged industry consultants MEC Pty Ltd to undertake a Mineral Resource Estimate
(MRE) for the First Hit Project, with the estimate completed for gold mineralisation.
A summary of sampling techniques and data, estimation and reporting methodologies is
contained in JORC Table 1 which is included as an attachment to this ASX release.
The complete Resource which has been estimated is reported above a 2g/t cut-off grade and lies
within close proximity to the historical underground development established previously to mine
the higher-grade portions of the Resource.
Geological Interpretation
MEC used a 0.5g/t Au geological cut-off grade to delineate the Mineralisation envelopes.
Interpretation was conducted in section with all strings snapped in 3D to the drillholes. Two main
lodes and smaller lodes were interpreted. Grades were displayed for the interpretation. Following
sectional interpretation, the lodes were then wireframed.
Implicit modelling using Leapfrog Geo software was used to create initial 3D geological model
meshes for the Kylies, Evans, and Link lodes using the chronological order to create the
precedence and the limiting structures.
The implicit model was imported into Micromine software, and the updated drillholes
interpretation strings digitised and snapped to drillholes. On completion of the interpretation
process, the strings were reviewed in 3D and modified to reflect the geology where required.
Interpreted strings were used to construct final wireframes of the lodes. Post mineralisation
pegmatites were modelled and applied to the block model as they are barren of gold
mineralisation.
Sampling and Sub-Sampling Techniques
For the historic exploration WMC completed 13 RC drillholes and one diamond drillhole during
their tenure between 1990 and 1992. No descriptions of the nature of the sampling are available.
Barminco completed core and diamond drilling of holes up to 346 metres below surface over the
First Hit Project area mineralisation. 21 RC drillholes were completed north and south along strike
from the deposit testing for repeats of the First Hit mineralisation.
Percussion samples were split at the drill sites and a 2-5 kg sample was taken for processing and
analysis. Probable waste zones were sampled by compositing over 2-4 metres and individual
samples were retested if the composites were anomalous.
Diamond drill core was split length ways and half was used for initial analysis whilst the remaining
half was used for reference material.
For the Viking Exploration Drilling and Sampling, 2021, diamond drill core sampling was
undertaken utilising half core designated by CSA Global personnel which was marked up with a
cutting line and sent to Dynamics G-Ex contractor in Kalgoorlie, where half core was sampled.
Aircore samples were collected at the drill rig during drilling. Samples were collected from drill
spoils by a scoop over 2m composites with a 1m end of hole bedrock sample taken for each hole.
The samples collected were between ~0.5 and ~3kg and submitted to MinAnalytical laboratories
ASX:VKA | vikingmines.com
5
for analytical work. Additionally, handheld XRF analysis was undertaken on some but not all
Aircore samples
Diamond drilling was HQ core (63.5mm) to provide a larger core diameter for better
representivity of sampling given the potential for coarse gold. Between 20cm and 1m (generally
1m) of half core was sampled by Dynamics G-Ex contractor in Kalgoorlie. The assay methodology
is described below.
Drilling Techniques
All drillholes, with the exception of BFH124 to BFH135, were planned and drilled using Australian
Map Grid 84 (Zone 51). Drillholes BFH124 to BFH135 were planned and drilled using the First Hit
local mine grid. The First Hit local mine grid is orthogonal to the known mineralised trend in this
area (020°). The grid orientation is at 290 degrees magnetic.
The database used for the January 2025 MEC MRE included 257 drillholes for 28,424m. Inclusive
of 10 Aircore drillholes for 56m, 13 Rotary Air Blast (RAB) drillholes for 30m, 166 Reverse
circulation drillholes for 22,187m, 68 diamond drillholes for 6,151m, and 502 underground
channel and face samples for 2,103m.
The drillhole spacing ranges from 20m x 20m increasing to 40m x 80m (Figure 5).
Classification Criteria
The January 2025 MEC MRE was classified as Inferred Mineral Resources, primarily due to the
lack of supporting QAQC data and density data.
Sample Analysis Method
For the historic data (Pre Viking exploration) 7,865 samples were prepared for Fire Assay and
tested by Kalgoorlie Assay Laboratory. There are incomplete records for the remaining 2,150
samples. Fire Assay is considered a total digest and is generally appropriate for this type of
mineralisation.
For the 2021 Viking Exploration Drilling and Sampling, diamond core analysis: Between 0.5kg
and 6kg of half core sample was pulverised to produce a 50g charge for fire assay. All pulp
samples were analysed by Laboratory portable XRF. Selected samples to characterise host rocks
and alteration were digested by a 4-Acid digest and analysed for 60 elements using an ICPOES/MS finish.
Photon Assay: Samples were analysed at MinAnalytical in Perth where the samples were
considered to be possibly high grade, such as core near zones of historical mineralisation. The
analytical method used was a 500g Photon Assay, a non-destructive method for gold only.
Aircore sample analysis: Aircore drilling was used to obtain 2m composite and individual 1m end
of hole samples from which 3kg was pulverised to produce a 50g charge for fire assay. Selected
drill samples were analysed pXRF in the field and in Minanalytical Laboratory. Selected samples
to characterise host rocks and alteration are digested by a 4-Acid digest and analysed for 60
elements using a ICP-OES/MS finish.
ASX:VKA | vikingmines.com
6
Estimation Methodology
All drillhole intervals were composited to 1m, which is the dominant sample length.
Experimental variograms were modelled for Au within the mineralised envelopes, variogram
maps were used to identify the direction of maximum grade continuity. The downhole variogram
was modelled to quantify the nugget effect. The nugget was then defaulted to the subsequent
directional variograms (Table 1).
Table 1: Semivariogram parameters
Total Sill
1.04
Sills
Structure
Type
Gamma
%
Orientation & Range
Major Semi-Major
Minor
C0
Nugget
0.16
15%
10o/0o
100o/0o
0o/-90o
C1
Spherical
0.08
8%
9.9m
3m
2.1m
C2
Spherical
0.80
77%
59m
21m
19m
A blank block model was created with block sizes of 5m east 5m north and 5m in elevation, sub
blocked to 0.5m east, 0.5m north, and 0.5m in elevation. Historic production wireframes were
provided by Viking and validated by MEC before being used to deplete the model. The block
model was coded and sub blocked to the mineralised envelope, and the topography.
Estimation used parent cell estimation, with discretisation of 2 x 2 x 2. To optimise the estimation
of the deposit, three search passes were used to inform the estimate. 15 lodes were estimated
separately. All search ellipses were assigned the following orientation: the strike orientation was
set at 10° azimuth, plunging +27.5° to the north and rotated -63.433°. The first search pass size
was set at 40m along strike, 60m down dip, and 10m across strike. A minimum of 3 drillholes was
used, with a restriction of 8 sectors, using a maximum of 5 samples per sector for a maximum of
40 samples. The second search pass size was set at 80m along strike, 100m down dip, and 10m
across strike. A minimum of 3 drillholes was used, with a restriction of 8 sectors, using a maximum
of 5 samples per sector for a maximum of 40 samples. The third search pass size was set at 120m
along strike, 150m down dip, and 10m across strike. A minimum of 3 drillholes was used with a
single sectors. All blocks were estimated after the third run.
Ordinary block kriging with a top-cut was used for Mineral Resource estimation, 31 grades were
cut to 100 g/t Au. Five grades were top-cut in the undepleted MRE. A cut-off grade of 2g/t Au was
used for reporting of the MRE. This was chosen on the basis of the high gold price (Jan 2025) and
the mine developments and infrastructure that is already in place at First Hit project. Capital
expenditure will be required to dewater the mine and to get the mine operational.
The MRE Ore Block Model was validated both locally and globally. Swath plots and sections were
used for local validation. The composite grades used for estimation correlated well with estimated
blocks, this was also reflected by the swath plots. The global validation result was wireframe
volume 75,116m3 versus OBM 75,045m3. Global validation differences in volume are minor but
higher for grade, as the wireframe grade calculation makes no allowance for declustering of data
and produces a biased estimate, OBM 8.8/t Aucut versus wireframe grade 12.6g/t Aucut. A dry bulk
density of 2.8t/m3 was applied for the tonnage estimate. This density value was derived from like
projects.
No QAQC data was provided to allow a check of the underlying data veracity.
ASX:VKA | vikingmines.com
7
Cut-off Grades
The 2025 MRE reported above a cut-off grade of 2.0g/t Au and depleted for historical mining is
shown in Table 2.
Table 2: MEC January 2025 MRE ≥2g/t Au
COG Au g/t
VOLUME
DENSITY
TONNES
Au_cut g/t
Metal Au
Oz's
2.0
29,900
2.80
83,800
7.04
18,961
All values are rounded to reflect they are an estimate. Numbers may not sum due to rounding.
MRE economic cutoff ≥2g/t Au, Top-cut grade 100 g/t Au
The MEC 2025 Mineral Resource estimate is stated at different Aucut g/t cutoff grades in Table 3.
The grade tonnage curve is shown in Figure 4.
Table 3: First Hit MEC January 2025 Mineral Resource Estimate at multiple cutoff grades Au g/t.
Cut-off Au g/t
0.0
0.5
1.0
1.5
2.0
2.5
3.0
Tonnage
98,156
97,172
94,098
89,164
83,766
76,898
70,443
Au_cut g/t
6.20
6.26
6.44
6.72
7.04
7.47
7.90
Ounces Au
19,559
19,549
19,468
19,268
18,961
18,467
17,898
MEC estimated a pre-mining depletion MRE of 55.3k Au oz with a top-cut value of 100g/t Au
applied.
The drillholes and wireframes are shown in Figure 5.
MRE comparison
The MEC January 2025 MRE undepleted for mining has a similar tonnage at a lower grade to the
Barra September 2001 MRE. The MEC 2025 MRE reports 173Kt @ 9.81g/t Aucut (
Table 4) versus 184kt @ 15.39g/t Au, both using a 2.0g/t Au cutoff grade.
Table 4: Undepleted MEC January 2025 MRE vs Barra 2001 MRE ≥2g/t Au
MRE Model
COG Au g/t
TONNES
Au g/t
Metal Au
Ounces
BARRA SEPT 2001
2.00
184,327
15.39
91,220
MEC JAN 2025
2.00
173,157
9.81
54,624
Reasonable Prospects Hurdle
MEC Mining consider that given the average grade realised along with the proximity to the
remaining underground infrastructure, that the “Reasonable Prospects for Eventual Economic
Extraction” requirement for Mineral Resources reported under the JORC Code (2012 Edition) has
been established.
ASX:VKA | vikingmines.com
8
Figure 4: MEC Jan 2025 MRE grade tonnage curve for remaining resource
Figure 5: 3D view showing the First Hit wireframes and drillholes
ASX:VKA | vikingmines.com
9
FIRST HIT PROJECT, WESTERN AUSTRALIA
The First Hit Project is centred around the historic high-grade First Hit gold mine situated along
the prospective Ida and Zuleika Shear zones in the Eastern Goldfields of Western Australia. The
Project incorporates 479.9km2 of tenements with 7 active Mining and Prospecting licences, 5
Exploration licences, and 3 Exploration licences under application. At the core of this landholding
is a 6.4km2 group of contiguous tenements that host the historic First Hit Gold Mine.
Prior to closure of the First Hit Gold Mine by Barra Resources in 2002 and at a time of depressed
gold prices of US$320/oz, the First Hit mine produced ~30k ounces of gold at an average grade
of ~7.7g/t Au. The Company is focused on delivering exploration programmes to test near mine
extensions and regional targets around the First Hit Project with the objective of defining fertile
structures and discovering gold ounces.
The Project area is well serviced by infrastructure and is located 50km west of the sealed
Goldfields highway and the township of Menzies. The nearest operating Gold Processing Plant is
the Davyhurst Mill 40km to the south, owned and operated by Ora Banda Mining (ASX:OBM). The
nearest operating gold mine is the Riverina open pit, located 8km south of the First Hit gold mine,
owned by OBM.
*See Appendix 1 for data source references
ASX:VKA | vikingmines.com
10
APPENDIX 1 – DATA SOURCES FOR MINERAL RESOURCE ESTIMATES AND MINE
PRODUCTION REFERENCED ON MAP IN FIGURE 1.
Riverina-Mulline Camp
Historical production: 305koz Au5
Measured, Indicated & Inferred Mineral Resource: 854koz Au6
OBM Production (FY21-23): 170koz Au7,8,9
TOTAL: 1,333koz
Central Davyhurst Camp
Historical production: 811koz Au1
2024 Indicated & Inferred Mineral Resource: 396koz Au2
TOTAL: 1,207koz Au
Bullant
Historic Production: 354koz Au3
Measured, Indicated & Inferred Mineral Resource: 462koz Au4
TOTAL: 816koz
Kundana Camp
Historic Production to June 2020: 2.75Moz Au10
FY21 to FY24 Production: 291,853oz Au11,12,13,14
Current Ore Reserves: 464koz Au15
Frogs Leg Mineral Resources: 770koz Au16
TOTAL 4.28Moz
Mt Ida
Historical production: 290koz Au19
2024 Indicated & Inferred Mineral Resource: 752koz Au20
TOTAL: 1,042koz Au
Bottle Creek
Historic Production: 90koz Au17
Alt Resources Quarterly Report 30 June 2020 - JORC Resource & Reserve Table: 370koz Au17
TOTAL 460koz
Map Source References
1) https://orabandamining.com.au/projects/davyhurst/
2) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
3) https://www.miningnews.net/precious-metals/news/1233885/bullant-gold-packs-bite
4) https://nortongoldfields.com.au/bullant/
5) https://orabandamining.com.au/projects/davyhurst/
6) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
7) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2021/?wpdmdl=7200&refresh=6736e1d72a3a51731650007
8) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2022/?wpdmdl=8803&refresh=6736e1d71beab1731650007
9) https://orabandamining.com.au/download/annual-report-2023/?wpdmdl=11152&refresh=6736e1d703e691731650007
10) https://randmining.com.au/projects/east-kundana-joint-venture/
11) https://app.sharelinktechnologies.com/announcement/asx/44dffa9bc8eaaa574af7cfda9564c595
12) https://app.sharelinktechnologies.com/announcement/asx/690381347ddb79dc8261b0f775636da7
13) https://app.sharelinktechnologies.com/announcement/asx/b13d0741e08843fb98f0e8c8be20eaaa
14) https://app.sharelinktechnologies.com/announcement/asx/00592059cc0f5c205e3eb6cfa25f3e4d
15) https://evolutionmining.com.au/storage/2024/02/2680687-Annual-Mineral-Resources-and-Ore-Reserves-Statement.pdf
16) https://evolutionmining.com.au/storage/2015/08/01647903.pdf
17) https://www.asx.com.au/asxpdf/20171108/pdf/43p1pnwsv6kd3g.pdf
18) https://www.asx.com.au/asxpdf/20200814/pdf/44lj6rj9wqk8r0.pdf
19) https://en.wikipedia.org/wiki/Mount_Ida_Gold_Mine
20) https://deltalithium.com.au/our-projects/mt-ida-lithium-gold/
ASX:VKA | vikingmines.com
11
APPENDIX 2 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria
Sampling
techniques
JORC Code explanation
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate to
the minerals under investigation, such as downhole gamma sondes, or
handheld XRF instruments, etc.). These examples should not be taken as
limiting the broad meaning of sampling.
ASX:VKA | vikingmines.com
Commentary
Historical Surface Geochemistry
Several companies have undertaken surface exploration through the history of the tenement including
Riverina Gold, Croesus Gold, WMC, Barminco and Barra Gold. A total of 24,289 samples were
collected, however CSA Global reported only WMC and Barminco, as described below.
WMC mining completed several phases of soil geochemistry between 1990 and 1992 with 2,836
samples collected. This included:
•
Stream sediment geochemistry from active streams from contemporary lags within stream
beds.
•
2 kg pan concentrate samples collected from trap sites in active drainage channels.
•
Soil samples collected from 5-15 cm depth or 15-30 cm depth depending on soil thickness
and passed through -10#, +36#, -80# or 120# meshes.
•
Surface soil sampling was sieved through a 6 mm mesh.
Barminco Pty Ltd undertook 2 geochemical soil geochemistry programs on the northern part of M30/99
between 1995 and 2000. The first soil survey completed was designed to test areas of residual soil and
outcrop, whereas the second soil survey tested areas covered by shallow transported cover. In areas of
residual soil and outcrop –80 mesh soil samples were collected on a 50 m x 50 m spaced grid and
analysed for gold and arsenic. In areas of transported cover, a preliminary 100 m x 400 m spaced auger
soil sampling program was undertaken.
The details of the sampling methods and horizons tested for the -80# mesh soil sampling and auger
sampling are not described.
WMC collected ironstone float rock chip samples (number unknown) across the tenements.
Barminco completed undertook rock chip sampling between 1996 and 2002, though the number of
samples collected is unknown. Rock chips are described as being collected also taken in areas with
cover, laterite development and recent drainage areas for pathfinder and mapping purposes.
Historical Surface Drilling
WMC completed 13 RC drill holes and one diamond drill hole during their tenure between 1990 and
1992. No descriptions of the nature of the sampling are available.
Barminco completed core and diamond drilling of holes up to 346 metres below surface over the First
Hit Project area mineralisation. 21 RC holes were completed north and south along strike from the
deposit testing for repeats of the First Hit mineralisation.
Percussion samples were split at the drill sites and a 2-5 kg sample was taken for processing and
analysis. Probable waste zones were sampled by compositing over 2-4 metres and individual samples
were retested if the composites were anomalous.
Diamond drill core from was split length ways and half was used for initial analysis whilst the remaining
half was used for reference material (kept used for metallurgical testing as required).
Historical Underground Ore Control and Definition:
Underground resource definition drilling using drill core provided solid core samples for analysis.
During mining operations face channels and production drill holes were used to assist with ore
definition and control. Whole core was sampled from UG drill core.
Historical Underground Face Sampling
As drives advanced Barminco geologists/technicians carried out rock chip sampling across the exposed
drive face. Not all drive advance faces were mapped or sampled. The sampling was treated similarly to
a drill hole although typically undertaken as a ‘channel’ rock chip sample along a pre-determined line
12
Criteria
JORC Code explanation
Include reference to measures taken to ensure sample representivity and
the appropriate calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done this
would be relatively simple (e.g. ‘reverse circulation drilling was used to
obtain 1 m samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may be required,
such as where there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information
ASX:VKA | vikingmines.com
Commentary
at right angles to the dip of the vein structures/mineralisation. The face was mapped and significant
geological features recorded. The sample line attitude (dip), sample number, sample length, and
sample lithology recorded. In addition, the assay result for gold (Au) were recorded following receipt.
Viking Exploration Drilling and Sampling - 2021
Diamond drill core sampling was undertaken utilising half core designated by CSA Global personnel
which was marked up with a cutting line and sent to Dynamics G-Ex contractor in Kalgoorlie, where half
core was sampled.
Core that was not sampled was sent to the VKA facility in Perth for storage and subsequently all cut core
is stored in Perth at a VKA facility
Aircore samples were collected at the drill rig during the drilling process. Samples were collected from
drill spoils by a scoop over 2m composites with a 1m end of hole bedrock sample taken for each hole.
The samples collected were between ~0.5 and ~3kg and submitted to MinAnalytical laboratories for
analytical work. Additionally, handheld XRF analysis was undertaken on some but not all Aircore
samples (described below)
The Competent Person considers these sampling methods appropriate for this style of mineralisation.
Historical Information
The entire RC sample was collected and sampled at the drill rig; samples from diamond drilling were
subsampled in a core handling facility. Diamond and RC field duplicates were taken at selected intervals
within the interpreted mineralised horizons to measure representativity of sample splits.
Historical Underground Face Sampling
No information is provided in available reports to ascertain the representivity of the face sampling,
though some face maps show both selective and mark ups for sampling lines across the lode. No
information has been located relating to QAQC procedures such as duplicate sampling, certified
standards or laboratory repeats or standards.
Viking Exploration Drill Sampling
Diamond drill core is cut and sampled along designated cut lines in areas of geological and interpreted
mineralisation to provide representative sampling. The position of the cut line on the diamond core is
chosen to ensure that the selected sample is representative.
Aircore sample recovery was monitored for excessive sample loss
Share your feedback
Discover