VIKINGS LINKA PROJECT ACHIEVES 63.6% WO3 CONCENTRATE
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
31 March 2026
contact@vikingmines.com
1
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
ASX:VKA
vikingmines.com
VIKING’S LINKA PROJECT ACHIEVES 63.6% WO3
CONCENTRATE
• Exceptional 53-fold upgrade achieved in cleaner gravity separation testwork, with initial
1.2% WO3 feed processed into a high-grade 63.6% WO3 scheelite concentrate.
• Premium marketable grade attained; concentrate grade sits within the top tier of global
scheelite products.
• Streamlined low-cost flowsheet being developed via simple gravity separation,
significantly reducing anticipated capital intensity and technical risk.
• Rapid-start production pathway identified, with gravity separation focussed circuit
suitable to fast-track future development and early cash flow in Nevada.
• 42.4% recovery achieved into premium 63.6% WO3 scheelite concentrate and 46.0%
recovery to a saleable 56.4% WO3 scheelite concentrate.
• First pass sighter rougher flotation testwork successfully completed, delivering a further
37.8% recovery into flotation products.
• Cleaner flotation testwork commenced to generate a saleable concentrate from the
flotation stage to compliment the saleable concentrate produced via the gravity stage.
• Additional testwork underway with Sepro Falcon Concentrators to test recoveries of
scheelite fines within the process flowsheet.
• Global tungsten pricing continues to test all-time highs, recently reaching
US$2,800/mtu for Ammonium Paratungstate (APT)1
.
• Global tungsten supply in structural deficit and being compounded by ongoing conflicts
in the Middle East and Ukraine.
1
Source: Shanghai Metals 30th March 2026: https://www.metal.com/tungsten
Figure 1; Photo showing separation of scheelite from waste minerals during Wilfley table gravity concentration stage.
Assayed grade of Wilfley table product ~18% WO3, which feeds in to the Mozley table cleaning stage.
2
ASX:VKA | vikingmines.com
Viking Mines Ltd (ASX: VKA) (“Viking” or “the Company”) is pleased to report a major technical
milestone at the Linka Tungsten Project in Nevada, USA. Metallurgical testwork has successfully
demonstrated that the Project’s mineralisation can be upgraded by over 5,300% using simple, low-
cost gravity separation, confirming a potential high-margin development pathway.
In the Companies first attempt at cleaning the previously reported rougher gravity concentrate,2
a
high-grade saleable concentrate of 63.7% WO3 at a 42.4% recovery has been produced.
Combining this concentrate with the lower grade middlings streams results in a concentrate
grading 56.4% WO3 at an increased 46.0% recovery.
Initial flotation testwork on the gravity tailings has recovered a further 37.8% of the WO3 increasing
the combined gravity and flotation recovery to 83.8%. Achieving this recovery after only one test
is significant given the optimisation normally required for flotation. Cleaning testwork of the
flotation products has commenced with the objective of delivering a saleable grade product in
addition to the gravity saleable grade product and maximise overall recoveries.
Viking Mines MD & CEO Julian Woodcock said:
“We have achieved a premier grade upgrade at Linka, moving from a 1.2% feed to a 63.6% WO3
concentrate utilising the simple physical properties of scheelite. This demonstrates we can produce
a high-value, offtake-grade product without the need for the complex or expensive chemical
processing that plagues many other critical mineral projects. By focusing on a gravity-led flowsheet,
we are drastically lowering our potential capital costs and putting Viking on a much faster track to
construction and cash flow in the heart of Nevada.
“The uplift in grade from the initial rougher sighter gravity testwork further demonstrates the Linka
mineralisation’s amenability to simple processing. We are confident that the cleaner flotation stages
will also achieve the desired outcome of producing a saleable concentrate grade from the
successful rougher flotation products.
“A simple Linka processing flowsheet is now being established which feeds into our processing
concept study underway with Mineral Technologies to deliver a low CAPEX solution for this high
value asset at a time where tungsten is trading at all-time highs and in a structural supply deficit.”
A LOW-CAPEX PATHWAY TO COMMERCIAL PRODUCTION
The primary focus of recent testing was to validate a "Rapid-Start" model that prioritises low-cost
separation over complex processing. During gravity separation cleaning testwork, the Company
achieved a peak concentrate grade of 63.6% WO3. This ability to produce a premium end-product
through gravity alone is a significant competitive advantage, allowing for a simplified, modular
plant design that can be permitted and built in a fraction of the time required for traditional
facilities. These testwork results are being incorporated into the conceptual processing study
being undertaken by Mineral Technologies3
to ascertain CAPEX estimates and plant design.
INSTANT RECOVERY AND ECONOMIC RESILIENCE
These results demonstrate that nearly half of the total contained tungsten can be recovered quickly
and simply and at very low cost, providing a strong foundation for the project's economics before
the planned addition of secondary recovery stages via flotation. Initial gravity recoveries reached
42.4% for the premium 63.6% WO3 concentrate, and 46.0% when combined with middlings for a
56.4% WO3 concentrate. This "easy-to-access" metal provides the high-margin baseline required
2
VKA ASX Announcement, 3 March 2026 - Viking Achieves 16x Tungsten Grade Increase
3
VKA ASX Announcement, 17 March 2026 - VKA Engages Mineral Technologies for Linka Tungsten
3
ASX:VKA | vikingmines.com
to de-risk the project’s early production years and ensures the operation remains resilient across
commodity cycles.
STRATEGIC POSITIONING IN THE US SUPPLY CHAIN
With global APT prices testing US$2,800/mtu, the ability to produce high-grade concentrates via
a low-CAPEX model in Nevada establishes Linka as an increasingly strategic asset. As the US
Department of War and domestic manufacturers seek to secure "NATO-grade" tungsten supply
outside of traditional channels, Viking is positioned as a primary onshore solution.
LINKA GRAVITY CLEANER AND ROUGHER FLOTATION TESTWORK
The Company has completed second stage gravity separation and sighter flotation testwork
following the successul intial rougher testwork2
which demonstrated the mineralisaitons
amenability to gravity separation. The test involved rougher and cleaner shaking table testwork at
P100 250micron grind size and established that a high grade saleable concentrate can be
produced using a relatively simple gravity processing step.
Gravity separation is a mechanical process that leverages the high density of scheelite to separate
it from waste rock. Because it does not require more complex equipment and expensive chemical
reagents, it represents the most economical processing route.
In addition to the gravity testwork, sighter flotation testwork confirmed amenability to flotation on
the gravity tail, further enhancing the projects process flowsheet potential.
Testwork key findings are summarised below:
• First pass shaking table rougher / cleaner testwork achieved a 63.6% WO3 concentrate at a
42.4% WO3 recovery. Addition of the high grade middlings stream delivered a scheelite
concentrate of 56.4% WO3 at an increased 46.0% WO3 recovery.
• Cleaner gravity separation tails (stream 3) to be fed into the next rougher flotation test to
increase recovery.
• Initial rougher flotation testwork on the gravity tails recovered a further 37.8% of the WO3
increasing the combined gravity and flotation recovery to 83.8%.
• Rougher flotation test recovered 74.4% of the gravity tails with cleaner flotation expected
to increase the final concentrate grade so that it can be combined with the gravity
concentrate to maintain a high grade saleable (>50% WO3) concentrate.
• Next round of gravity and flotation tests will focus on optimising the gravity stage and
cleaner flotation testwork to generate high grade saleable (>50% WO3) concentrate.
• Further testwork to focus on optimising both grade and recovery from both these stages.
NEXT STEPS
The metallurgical testwork is advancing on the four samples collected.4
Key next steps for the
advancement of the Linka Project include:
• Gravity Enhancements: Ongoing gravity separation tests at coarser grind sizes.
• Flotation Cleaning: Secondary recovery (cleaner) flotation testwork underway on the
gravity tails to capture additional tungsten, further enhance overall recoveries and
deliver saleable concentrate grades from flotation circuit.
4
VKA ASX Announcement, 14 January 2026, High Grade Assays Up To 1.3% Wo3 from Linka Tungsten Project
4
ASX:VKA | vikingmines.com
• Mineralogical Understanding: Analysis of detailed mineralogy results to firm up ore
processing options.
• Ore Sorting: Testing of a recently collected ~40kg sample by ore sorting technology.
• Modular Blueprint: Establishing the design specifications for a "Rapid-Start" gravity
circuit to support recently commenced development studies.
• Systematic Scale-Up: Applying these optimised flowsheet parameters to the remaining
bulk samples collected from the Linka Project area.
• Geological Understanding: 3D geology model completion using recently digitised
mapping and drillhole data.
• Maiden Drilling: Notice of Intent submission to the Federal Agencies to secure drill
permitting, targeting drilling in the June Quarter (April-June) 2026.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
+61 8 6245 0870
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a Member
of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd.
Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the disclosure of the information in this report
in the form and context in which it appears.
Competent Persons Statement – Metallurgical Testwork
The information in this announcement that relates to Exploration Results from metallurgical test work is based on, and fairly represents,
information and supporting documentation compiled by Mr Peter Adamini, BSc (Mineral Science and Chemistry), who is a Member of
The Australasian Institute of Mining and Metallurgy (AusIMM). Mr Adamini is a full-time employee of SGS Australia owned Independent
Metallurgical Operations Pty Ltd, a wholly owned subsidiary of SGS Australia Holdings Pty Ltd, and has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr. Adamini is an independent consultant engaged by Viking Mines Limited for metallurgical representation. Mr Adamini
consents to the disclosure of the information in this report in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When used in this
document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are
forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these forward-looking statements
are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with
these forward-looking statements.
5
ASX:VKA | vikingmines.com
APPENDIX 1 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments,
etc.). These examples should not be taken as limiting the
broad meaning of sampling.
Metallurgical Sample
Collection of loose rocks on surface from each of the 4 sample locations using an ultraviolet light (254nm wavelength) to
identify mineralised material to identify mineralised material. Samples collected were bagged in to calico and polyweave
bags and subsequently broken into smaller pieces to aid transportation to the metallurgical laboratory and facilitate
processing by the metallurgical laboratory.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Metallurgical Sample
Samples are deemed representative of the target mineralisation being sampled as they were identified using an ultraviolet
light which confirmed scheelite bearing mineralisation was sourced. It is unknown if the samples are representative of the
original insitu material due to rocks being collected from loose material on surface and not being insitu.
Aspects of the determination of mineralisation that are
Material to the Public Report. In cases where ‘industry
standard’ work has been done this would be relatively simple
(e.g. ‘reverse circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised to produce a 30 g
charge for fire assay’). In other cases more explanation may
be required, such as where there is coarse gold that has
inherent sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules) may warrant
disclosure of detailed information
Metallurgical Sample
Loose rocks collected form surface and delivered to the metallurgical laboratory in 26 individually numbered calico bags.
Samples which corresponded to the parent (composite) sample were prepared by the laboratory by combining contents
from the designated bags, stage crushing to <3.35 mm, passing through a riffle splitter multiple times and blending to
homogenise. This blended sample was further processed through the riffle splitter to generate a representative sub-sample.
This sub-sample was then pulverised to minimum P80 <75 µm prior to being submitted for assay. This sub-sample is
considered accurate with sample mineralogy not expected to have caused sampling issues.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g.
core diameter, triple or standard tube, depth of diamond
tails, face-sampling bit or other type, whether core is oriented
and if so, by what method, etc.).
Not applicable, no drilling being reported.
Drill sample
recovery
Method of recording and assessing core and chip sample
recoveries and results assessed.
Not applicable, no drilling being reported.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Not applicable, no drilling being reported.
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Not applicable, no drilling being reported.
6
ASX:VKA | vikingmines.com
Criteria JORC Code explanation Commentary
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
Not applicable, no drilling being reported.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
Not applicable, no drilling being reported.
The total length and percentage of the relevant intersections
logged.
Not applicable, no drilling being reported.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all
core taken.
Not applicable, no drilling being reported.
If non-core, whether riffled, tube sampled, rotary split, etc.
and whether sampled wet or dry.
Metallurgical Sample
Samples were collected dry. No splitting was undertaken in the field. In the metallurgical laboratory, the sample was
prepared by stage crushing to <3.35 mm and then homogenised and sub-sampled using a riffle splitter.
For all sample types, the nature, quality and appropriateness
of the sample preparation technique.
Metallurgical Sample
The sample preparation, blending and sub-sampling techniques are appropriate for this material’s mineralogical makeup.
Quality control procedures adopted for all subsampling
stages to maximise representivity of samples.
Metallurgical Sample
No QAQC samples were utilised by Viking. The metallurgical laboratory inserted blanks and standards which contained WO3
grades similar to the assayed samples WO3 head grades.
Measures taken to ensure that the sampling is representative
of the in-situ material collected, including for instance results
for field duplicate/second-half sampling.
Metallurgical Sample
Insitu material has not been sampled. No duplicates taken. On completion of the metallurgical testwork programme, the
metallurgical balance will be used to verify the head grade assays.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
The Competent Person considers the current methods and processes described as appropriate for this style of
mineralisation due to the grade of mineralisation being reported. Sample size of the metallurgical sample is appropriate
both due the grades being grade of the mineralisation and the large samples collected.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
Metallurgical Sample
The assaying technique utilised a lithium metaborate/lithium tetraborate (50/50) fusion melt followed by nitric acid
dissolution with the resulting solution analysed by an ICP OES/MS. This technique is considered to be total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading
times, calibrations factors applied and their derivation, etc.
No data has been reported of this type.
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
Metallurgical Sample
No QAQC samples were utilised by Viking. The metallurgical laboratory inserted blanks and standards which contained WO3
grades similar to the Viking’s assayed samples WO3 head grades. This achieved acceptable levels of accuracy and removed
bias.
The verification of significant intersections by either
independent or alternative company personnel.
Not applicable, no drilling being reported.
7
ASX:VKA | vikingmines.com
Criteria JORC Code explanation Commentary
Verification of
sampling and
assaying
The use of twinned holes. Not applicable, no drilling being reported.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Metallurgical Sample
Samples are bagged in calico bags and assigned a sample number from a ticket book. Sample details are recorded in a
spreadsheet and then uploaded in to Viking’s Maxwell Datashed database.
Discuss any adjustment to assay data. No adjustment is made to the assay data.
Location of
data points
Accuracy and quality of surveys used to locate drillholes
(collar and downhole surveys), trenches, mine workings and
other locations used in Mineral Resource estimation.
Metallurgical Sample
No drilling being reported. Sample locations provided are approximate area where the samples were collected from.
Composite sample collected for each area is composed of loose rocks collected from within an approximate15m radius of
the reported sample coordinate.
Specification of the grid system used. The adopted grid system is NAD83/UTM Zone 12N and all data are reported in these coordinates.
Quality and adequacy of topographic control.
Publicly available LiDAR data from the USGS is at 1m accuracy and considered of a high quality and has been used to
determine the elevation of the samples collected.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results. Not applicable.
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Not applicable.
Whether sample compositing has been applied.
Metallurgical Sample
Sample assay results have not been composited. Physical samples collected are consider a composite sample via the
collection of multiple loose rocks from the sample locations to provide sufficient material for the metallurgical testwork
programme.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
Metallurgical Sample
Unknown, the mineralisation sampled was not insitu.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to
have introduced a sampling bias, this should be assessed
and reported if material.
Not applicable, no drilling being reported.
Sample
security
The measures taken to ensure sample security.
Metallurgical Sample
Samples were collected in the field by Viking geologists and personally delivered to Base Met Labs in Tucson, Arizona.
Audits or
reviews
The results of any audits or reviews of sampling techniques
and data.
The Company has conducted no audits or reviews of the sampling techniques and data.
8
ASX:VKA | vikingmines.com
JORC 2012 Table 1, Section 2 – Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
Tenements and location
The USA Tungsten Project Lode Mineral Claims are located in the state of Nevada in the USA. Details of the
Mineral Claims are presented in the table below:
Project State County Type Holder Quantity
Linka Nevada Lander Unpatented
BLK Group LLC 10
Viking Tungsten LLC 91
Alpine Nevada Pershing Unpatented BLK Group LLC 4
Long Nevada Pershing Unpatented
BLK Group LLC 4
Viking Tungsten LLC 12
Ragged Top Nevada Pershing Unpatented
BLK Group LLC 8
Viking Tungsten LLC 30
Terrell Nevada Nye Unpatented
BLK Group LLC 10
Viking Tungsten LLC 56
Victory Nevada Nye Unpatented Kircher Mine Development LLC 8
Third Party Interests
Viking Mines Ltd has signed a binding term sheet to acquire a 100% interest in the project BLK Group LLC
Mineral Claims and currently holds no ownership. Viking can acquire 100% interest in the claims by paying a
total of US$2.88M over a staged 7 year period. BLK group will retain a 2% NSR on all minerals recovered from
mineral claims, and Viking retains the option to buy down 1% of the NSR for US$2M.
Native Title, Historical sites and Wilderness
There are no known registered historical sites over the Project Mineral Claims. The Mineral Claims are
registered with the Bureau of Land Management. The Linka Project has split federal agency responsibility with
the Bureau of Land management managing approximately half of the claims and the US Forestry Service the
other half. All the remaining projects fall under the jurisdiction of the BLM.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are held in good standing by BLK Group LLC. To the best of Vikings knowledge, all annual
claim payments are up to date. There are no known impediments to obtaining a licence to operate in the area.
The US process is to file either a notice of intent or Plan of Operations to the responsible Federal Agency to
obtain permits for drilling. The Company does not know of any reason why these permits would not be
granted once the process if followed and the required bond payment made.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties.
Linka Mine: The area was staked in 1941 by Steve Linka of Austin, NV. In 1943-44, the mine produced 2,420
tons of ore averaging 0.69% WOз. Consolidated Uranium Mines purchased the property in 1953, sunk a
vertical shaft to 210 feet and drove approximately 1,000 feet of drifts and cross-cuts on the 150’ level.
Additional production included; 4,000 tons of ore averaging 0.98% WOз between 1951 and 1956 and 60,000
tons averaging 0.40% WOз between 1955 and 1956. The mine closed when the Government buying program
ended. Mine workings include a 100’ X 50’ open-pit 25 feet deep, a 210’ shaft with approximately 1,500 feet of
drifts and cross-cuts. Shrinkage stopes extend from the 150’ level to the surface (Stager and Tingley, 1988).
In 1951, the Linka Mine was optioned to Hugh Chesser, Reno, NV. Hugh Chesser estimates shipments to
Metals Reserve Corporation during WWII totalled 2,673 tons averaging 0.72 percent WOз.
9
ASX:VKA | vikingmines.com
Criteria JORC Code explanation Commentary
Cache Creek Exploration held the properties in the early 1970’s and conducted geological and geophysical
programs. Duval Corporation optioned the properties in the mid-1970’s, did geological studies but no drilling.
Min-Ex drilled the property in 1977-78, with a total of 73 drillholes recorded (eight DDH and 64 wide-spread
percussion drillholes). Note: Not all drillhole locations have been established, with 69 holes digitised and 1
hole estimated (total 70) and three percussion holes with unknown location. Exploration activity completed by
Minex included drilling, surface and underground geological mapping and sampling, minor geophysical
magnetic survey with 10,400 linear feet collected (inconclusive results), 6,500ft of bulldozer trenching and
mapping.
Stager and Tingley, 1988 estimate total production at the Linka mine at 25,670 units WOз (1943-56).
Linka-Conquest Mine: The mine was discovered in 1941 but did not start production until 1943 when Gale
Peer sunk a two-compartment inclined shaft to 130 feet. Workings off the shaft were at the 50 and 100 foot
levels. During WW II mined and shipped 390 tons of ore averaging 2.7% WOз. Additional shipments after the
War averaged over 1.0% WOз, but the tonnage is unknown. Last work on the 100’ level exposed a zone 40’
long, 12’ to 20’ wide, open to the northeast with a grade of <0.4% WOз. Stager and Tingley, 1988, estimate
total production at 5,208 units WOз (1944-56).
Stager and Tingley, 1988 estimate total production at the Conquest mine to be 5,208 units WOз (1944-56)
Geology Deposit type, geological setting and style of mineralisation
Linka Project: The area is underlain primarily by sedimentary rocks; it includes an outcrop of massive
limestone of Ordovician age (Upper Plate) overlain in thrust contact by chert and shale of Ordovician Vinini
Formation (Lower Plate). The limestone is intruded locally by granitic rocks of Jurassic age, and the tungsten
deposits occur in the limestone along the granite contact (Stager and Tingley, 1988)
Linka-Conquest Mine - Granite intrusive rocks (Jg) and aplite dikes intrude cherts, shales and limy members of
the Vinini Formation (Ov) in the Upper Plate of the Roberts Mountain Thrust. Scheelite-bearing skarn formed at
the contact.
Miocene age Bates Mountains tuff (Tbm) covers any extension of the mineralization to the northeast.
Linka Mine – Scheelite occurs in lenses and tabular masses of skarn at the contact between Ordovician
Antelope Valley Limestone (Lower Plate of the Roberts Mountain Thrust) and granitic intrusive rocks. The
contact zone is cut by igneous dykes and high-angle faults. Exposures are poor. Granite rocks west of the
contact zone are covered by post-mineral volcanic rock and sediments of Big Smokey Valley.
Antelope Valley limestone east of the contact zone is nearly vertical. The contact zone is about 40 feet wide.
Drilling in the 1970’s shows that, at depth, the contact zone may flatten to the east, then steepen.
Scheelite, with traces of chalcopyrite and molybdenite are the only ore minerals recognized.
Linka-Hillside - The Hillside incline shaft is about half way between the Conquest and Linka Mines. The shaft is
inclined at ~47° and is approximately 100 feet deep. In 1978, when the area was visited by Richard Jones and
Harold Bonham, geologists at the Nevada Bureau of Mines and Geology, there were no drifts or cross-cuts off
the shaft. Here the rocks are more thinly bedded and contain more hornfels then sediments at the Linka shaft.
Lenses of scheelite-bearing skarn in the Hanson Creek Fm are at the surface and a lens of mineralized skarn
within the Antelope Valley Limestone occurs in the shaft (Stager an
Share your feedback
Discover