Quarterly Report for the period ended 30 June 2023
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
25 July 2023
QUARTERLY REPORT FOR THE PERIOD ENDED
30 JUNE 2023
Canegrass Battery Minerals Project
•
Significant upside growth potential identified, with a JORC Exploration Target
Estimated (ETE) calculated and reported as a range between lower and upper limits. 1
•
The ETE is composed of six target areas, both extending and linking the two existing
Mineral Resource Estimates (MRE) at the Fold Nose and Kinks deposits (for a total of
8 focus targets).
•
Initial limited drilling programme completed; assays received for Kinks South target
returned: 2
o
17m at 0.98% V2O5 from 89m, including 12m at 1.06% V2O5 from 91m, and;
o
19m at 0.61% V2O5 from 52m, including 6m at 0.88% from 65m.
•
Major RC drilling programme undertaken at the Canegrass Project, 3 focused on
extension, growth and discovery outside of the JORC 2012 MRE of 79Mt at 0.64%
Vanadium Pentoxide (V2O5) 4.
•
Drilling has intersected thick zones of magnetite (mineral host to the Vanadium at
Canegrass) at the Kinks South Target area. Highlights include: 5
•
o
VCRC0012: 4 zones totalling 63m of strongly magnetic horizons containing 3
bands totalling 42m of logged massive magnetite, untested to the west and north.
o
VCRC0011: 3 zones totalling 61m of strongly magnetic horizons containing 4
bands totalling 35m of logged massive magnetite.
o
VCRC0018: 2 zones totalling 30m of strongly magnetic horizon containing 22m
of logged massive magnetite.
Post quarter end, the Company announced further intersects of thick massive
magnetite zones at Fold Nose. Multiple zones encountered in many drillholes and
supported by magnetic susceptibility measurements taken on drill samples. 6
o
VCRC0026: 3 zones totalling 53m of strongly magnetic horizons containing 3
bands totalling 34m of logged massive magnetite.
o
VCRC0027: 4 zones totalling 71m of strongly magnetic horizons containing 4
bands totalling 52m of logged massive magnetite.
o
VCRC0028: 2 zones totalling 47m of strongly magnetic horizons containing 3
bands totalling 42m of logged massive magnetite.
o
VCRC0035: 5 zones totalling 47m of strongly magnetic horizons containing 4
bands totalling 25m of logged massive magnetite.
1
VKA Announcement – 14 June 2023 – VKA Defines Substantial Upside Potential at Canegrass
VKA Announcement – 18 April 2023 – Viking Drilling Hits 12m of High-grade Vanadium at 1.06% V2O5
3
VKA Announcement – 6 June 2023 – VKA Commences Major Growth Focussed Vanadium Drill Programme
4
VKA Announcement – 30 November 2023 – Viking to Farm into Substantial Battery Mineral Resources
5
VKA Announcement – 29 June 2023 – Viking Hits Multiple Thick Zones of Magnetite at Kinks South
6
VKA Announcement – 20 July 2023 – VKA Intersects Thick Massive Magnetite Zones at Fold Nose
2
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
•
ALS Metallurgy engaged to undertake preliminary sighter metallurgical testwork on
36 samples taken from two zones in hole VCRC0006. 7 Testwork objectives are to
determine the recovery of Vanadium into a magnetic concentrate.
•
Initial processing of ground magnetics geophysical data completed which supports
mapping observations of Vanadiferous Titanomagnetite mineralisation continuing
south of the Fold Nose Resource. 8
Ghana Gold Project
•
Viking continued proceedings to recover full amount from the Defendants.
•
Vikings wholly owned subsidiary received a payment of US$713k (A$1.07M) and
Ghana Cedis (GHS) 1.2M from the Defendants as part payment of the monies owed.9
•
With ongoing interest accruing, the balance owed to VKA (as of 23 July 2023) is
USD$2.1M, calculated at A$3.1M (at current exchange rates).
Corporate
•
Strong cash position of $4.13M as of 30 June 2023
Viking Mines Limited (ASX:VKA) (“Viking” or “the Company”) is pleased to present its
quarterly activities report for the period ended 30 June 2023 (“June quarter”). The Company’s
focus during the reporting period was advancing exploration programmes at the Canegrass
Battery Metals Project in Western Australia.
WESTERN AUSTRALIA
Canegrass Battery Minerals Project
Exploration Target Estimate (ETE):
The Company announced on 14 June 2023, an Exploration Target Estimate (“ETE”) for the
Canegrass Project. The ETE has been completed across six contiguous target areas across the
Project as shown in Figure 1. The ETE is located outside of the existing extent of the Mineral
Resource Estimate (refer to Figure 1). A summary of the respective targets is given below in
Table 1. The total ETE is calculated to be in the range of:
144Mt to 192Mt at 0.45% to 0.99% V2O5 for 1.44 to 4.19 Billion Pounds V2O5.1
The potential quantity and grade of mineralisation of the ETE at the Canegrass Project is
conceptual in nature, there has been insufficient exploration to estimate a Mineral
Resource and it is uncertain if further exploration will confirm the target ranges.
Work completed since entering into an agreement with Flinders Mines Ltd (ASX:FMS) to
acquire the Canegrass Project has involved field mapping, rock chip sampling, geological
modelling, ground magnetics survey, magnetic inversion modelling and drilling. All data
collected as part of this exploration activity has been combined and used as the basis to
calculate the ETE.
7
VKA Announcement – 22 May 2023 – Viking Commences Metallurgical Testwork at Canegrass
VKA Announcement – 5 April 2023 – Viking Identfies Vanadium Targets from Magnetics Survey
9
VKA Announcement – 26 April 2023 – Viking Receives $1.14M from Ghana with $3.19M Debt Remaining
8
ASX:VKA | vikingmines.com
2
The ETE has been generated by following a process to determine potential ranges of tonnes
and grades at a series of exploration targets, with the calculations used by the Company to
direct the strategy to drill test targets at the Project. The following sections outline the process
used to derive the ETE.
Table 1: Summary of Exploration Target Estimate by Target Area
Exploration Target
Estimate Area
Fold Nose South Extension
Fold Nose North Extension
Fold Nose to Kinks South
Kinks South
Kinks West Extension
Kinks North Extension
Total
Million Tonnes
Lower (SG 3)
52.8
11.2
26.9
23.1
1.7
28.4
144.0
Upper (SG4)
70.3
15.0
35.8
30.8
2.2
37.8
192.0
Grade V2O5 %
Lower
0.43%
0.43%
0.45%
0.46%
0.57%
0.50%
0.45%
Upper
1.07%
1.07%
1.06%
1.04%
0.88%
0.71%
0.99%
Billion Pounds
V2O5
Lower
Upper
0.50
1.66
0.11
0.35
0.26
0.83
0.24
0.71
0.02
0.04
0.32
0.59
1.44
4.19
Figure 1: Map showing the targets which comprise the Exploration Target Estimate and the respective estimate
ranges. Note planned drilling which is underway at the project is shown as white triangles and all historical drilling
as indicated by the legend.1
ASX:VKA | vikingmines.com
3
The resultant geological model of the VTM horizon (Figure 2) used for the ETE was finalised by
reviewing the magnetic geophysical modelling against the geological model produced as part
of the field mapping process.
Figure 2: Isometric view to the west of the final geological model used to calculate the volumes and subsequent
tonnages for the ETE.1
Major Drilling Programme
During the June Quarter, the Company commenced a major drill programme at the Canegrass
Battery Minerals Project, comprised of ~40 Reverse Circulation (“RC”) drillholes, totalling
~6,500m, using drilling contractor TopDrill.3 Post the end of the June Quarter, the Company
completed the drilling programme, comprising ~44 RC drillholes (+1 re-entry), totalling
~7,119m. The programme was increased from the initial planned length due to extending
selected holes whilst drilling progressed and the addition of 4 holes for 491m at the Kinks
South target area following up on observations made in RC chips whilst drilling was underway.
Drilling was planned to test seven individual targets. Drilling was completed within the limits
of the two MRE areas at Fold Nose and Kinks and five of the six ETE (Kinks North Extension
target not being drilled and to be assessed at a later date). The objective of the drilling across
the highest priority ETE areas is to identify potential high-grade zones and then focus follow
up activity in any areas defined.
The planned drill collars testing the targets are shown on Figure 1. Drilling each of the targets
will provide important geological information and analysis results to test the validity of the
exploration targets.
Drilling at the Kinks South targets has returned multiple and consistent, thick zones of massive
magnetite which is the known host to Vanadium mineralisation at the Canegrass Project.
Drilling completed to date has returned the intercepts reported in Figure 3 and Table 2 across
the Kinks South target area. Highlights include:5
ASX:VKA | vikingmines.com
4
•
VCRC0012: 4 zones totalling 63m of strongly magnetic horizons containing 3 bands
totalling 42m of logged massive magnetite, untested to the west and north.
•
VCRC0011: 3 zones totalling 61m of strongly magnetic horizons containing 4 bands
totalling 35m of logged massive magnetite.
•
VCRC0018: 2 zones totalling 30m of strongly magnetic horizon containing 22m of
logged massive magnetite.
The drillhole intercepts have been identified through a process of geological logging and
measurements of magnetic susceptibility (magsus), with the process used discussed in the
original announcement released to market on 29 June 2023.
Magnetic susceptibility is used to identify magnetite within the drillhole which is the known
host to Vanadium mineralisation. No estimate of the quantity of Vanadium mineralisation has
been made as it is not possible to determine without laboratory analysis. The reported intervals
are not intended to confirm the presence of Vanadium mineralisation, however based on
information collected to date on the Project, the Company believes that there is high potential
for the reported intercepts to contain Vanadium based on evaluation of magsus vs vanadium
grade observed in drillhole VCRC0006.
Figure 3: View looking West over the Kinks South target area with historical drillhole results and location of holes
drilled as part of the major drilling programme underway. Callouts show the downhole intervals (true widths not
known) of magnetic susceptibility zones >125 SI units x 10-3 and the combined thickness. These zones are
interpreted to be related to magnetite mineralisation which has the potential to host Vanadium.2 4 5
ASX:VKA | vikingmines.com
5
Table 2: Table of intercepts defined by magnetic susceptibility readings and visual logging of massive magnetite
within drill chips at Kinks South target area. Intervals reported are downhole widths and true width is not known.
ASX:VKA | vikingmines.com
6
Post quarter end, the Company announced further observations from drilling at the Fold Nose.
Drilling at the Fold Nose target returned multiple and consistent, thick zones of massive
magnetite which is the known host to Vanadium mineralisation at Canegrass. Drilling at the
Fold Nose South & North Extension targets intersected variable magnetite horizons,
confirming the geology continues into these areas from the Fold Nose Deposit.
All holes have encountered magnetic intervals and selected highlights include:6
•
VCRC0026: 3 zones totalling 53m of strongly magnetic horizons containing 3 bands
totalling 34m of logged massive magnetite.
•
VCRC0027: 4 zones totalling 71m of strongly magnetic horizons containing 4 bands
totalling 52m of logged massive magnetite.
•
VCRC0028: 2 zones totalling 47m of strongly magnetic horizons containing 3 bands
totalling 42m of logged massive magnetite.
•
VCRC0035: 5 zones totalling 47m of strongly magnetic horizons containing 4 bands
totalling 25m of logged massive magnetite.
Figure 4: Map of the Fold Nose area showing the respective targets drilled and Vikings drillhole locations. Callouts
show the downhole intervals and the total combined thickness (true widths not known) of magnetic susceptibility
zones >6m thickness and >125 SI units x 10-3 with max internal waste of consecutive 3m. These zones are
interpreted to be related to magnetite which has the potential to host Vanadium >0.3% Cut-Off.
ASX:VKA | vikingmines.com
7
17 holes for a total of 2,768 metres have been completed at the three Fold Nose target areas
during the recently completed drilling campaign (Fold Nose MRE area and the two ETE targets,
Fold nose North & South Extensions). Drilling has targeted the strike continuity of the
mineralisation estimated at the Fold Nose MRE and was planned to extend the resource into
these areas.
Drilling completed to date has returned the intercepts reported on Figure 4 and in Table 3 to
Table 5 across the Fold Nose target areas. The drillhole intercepts have been identified by
geological logging and measurements of mag sus, with the process used discussed in the
original announcement released to market on 20 July 2023.
Substantial thick zones of magnetite have been intercepted at the three Fold Nose target areas.
The most significant are at the Fold Nose target which have intersected zones in all drillholes,
up to 29m in thickness in hole VCRC0028 and 24m in hole VCRC0026.
Table 3: Table of intercepts defined by magnetic susceptibility readings >6m thickness and >125 SI units x 10-3 with
max internal waste of consecutive 3m and visual logging of massive magnetite within drill chips at Fold Nose target
area. Intervals reported are downhole widths and true width is not known.
ASX:VKA | vikingmines.com
8
Table 4: Table of intercepts defined by magnetic susceptibility readings >6m thickness and >125 SI units x 10-3 with
max internal waste of consecutive 3m and visual logging of massive magnetite within drill chips at Fold Nose South
Extension target area. Intervals reported are downhole widths and true width is not known
Table 5: Table of intercepts defined by magnetic susceptibility readings >6m thickness and >125 SI units x 10-3 with
max internal waste of consecutive 3m and visual logging of massive magnetite within drill chips at Fold Nose North
Extension target area. Intervals reported are downhole widths and true width is not known.
ASX:VKA | vikingmines.com
9
Initial Drilling Programme Results:
The Company successfully completed an initial RC drill programme in the March Quarter
totalling 6 holes for 543m at Canegrass. Assays received by the Company in the June quarter
confirmed thick, high grade Vanadium rich zones at the interpreted target depths in hole
VCRC0006.2
•
•
17m at 0.98% V2O5 from 89m, including 12m at 1.06% V2O5 from 91m
19m at 0.61% V2O5 from 52m, including 6m at 0.88% V2O5 from 65m
Furthermore, substantial elevated copper, nickel and cobalt values have been identified within
the hole. Significant intercepts of these additional battery metals include:
•
•
•
17m at 590ppm Cu, 814ppm Ni and 190ppm Co from 89m
12m at 1281ppm Cu, 766ppm Ni and 122ppm Co from 65m including;
6m at 0.20% Cu from 70m with a Peak copper value of 0.31% Cu
Drillhole VCRC0005 was drilled 650m west of VCRC0006. Disseminated magnetite was
identified in several horizons within the gabbro but no massive VTM was encountered. This
hole was subsequently extended in the major drilling programme with an 8m wide zone
defined by magnetic susceptibility readings >125 SI Units x10-3 from 189m with associated
massive magnetite logged in the RC drill chips. At the time of this report, analysis results are
pending for this zone. Low grade Vanadium mineralisation has been identified in the assays
received throughout the part of the hole drilled in the March Quarter, with two zones returning
(above a 0.2% V2O5 cut-off);
•
•
8m at 0.24% V2O5 from 104m, and;
24m at 0.26% V2O5 from 118m
Metallurgical Testwork Programme
ALS Metallurgy was engaged during the June Quarter to conduct preliminary sighter testwork
on 36 samples collected from hole VCRC0006, which was completed as part of Vikings March
initial drill programme. 36 one metre samples were selected from the two intercepts within
hole VCRC0006 above a 0.5% V2O5 cut-off (Figure 5).7
Zones of internal waste below a 0.5% V2O5 cut-off have been included to determine how the
lower grade mineralisation responds to standard magnetic recovery. This will provide
information which can be incorporated in future resource and reserve estimates for the
purposes of mining dilution calculations.
Samples will be ground to a standard a minimum P80-75 micron size and processed via a Davis
Tube Wash (DTW) to produce a magnetic concentrate. The magnetic concentrate will then be
analysed to determine the grade and compared with the feed (head) grade to determine the
recovery of Vanadium into the concentrate.
ASX:VKA | vikingmines.com
10
Figure 5: Cross section through hole VCRC00061 showing the zones selected for metallurgical testwork. Individual
1m samples within the zones highlighted are to undergo Davis Tube Recovery testwork to produce a magnetic
concentrate.7
FIRST HIT GOLD PROJECT
The Company’s First Hit Project (“First Hit Project”) is located 50km west of Menzies in the WA
Goldfields. No field exploration activity was undertaken on the First Hit Project during the
reporting period. Activity involved statutory reporting and the tenements remain in good
standing.
GHANA
Akoase Gold Project
Payments Received
During the quarter, the Defendants made a payment of US$713k and GHS1.2M to RAL9
towards the Court ruled debt of US$2.88M. The payments are considered by the Company to
be respectively towards the interest and outstanding overdue payments from the sale of the
Akoase Gold Project, and payment against the court ruled costs due of GHS1.2M.
ASX:VKA | vikingmines.com
11
Outstanding Debt
Based on the entry of judgement received on 13 March 2023 and accounting for interest which
has continued to accumulate, Viking calculates the Company is still owed US$2.1M as of
23 July 2023. At current exchange rates, this equates to an outstanding balance yet to be paid
of A$3.1M.
The Company continues to pursue the remaining balance of the monies owed using our legal
team in Ghana. Interest will continue to accrue on the US$ amounts owed at 5% APR.
CORPORATE
The Company has a strong cash position of $4.13M as of 30 June 2023.
Expenditure for the period totalled $543k and exchange rate variations on the Company’s US$
cash reserves resulted in a gain of $82k and a gain of $21k from investing activities,
representing a net cash increase of $780k from the March 2022 quarter Appendix 5B cashflow
report. The cash increase between the reporting periods is a result of the receipt of funds from
Ghana.
Further expenditure from the drilling programme which was been undertaken during the June
Quarter are due in the September 2023 quarter and will be reflected in the September
Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $96k in the quarter ending 30 June 2023. This amount comprised
Director fees for the relevant period.
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure on exploration and evaluation activities for the quarter predominantly
related to:
•
•
•
Exploration expenditure for the Canegrass, First Hit and Ghanaian Projects ~$127k.
General corporate and administration costs ~$312k.
Director fees and staff costs~$104k
SEPTEMBER QUARTER PLANNED ACTIVITIES
The Company continues to make rapid advancements at the Canegrass Project, with the focus
on advancing the understanding and interpretation with the drilling completed in the period.
Upcoming activities and priorities include:
•
Complete review of drilling samples and geology.
•
Receipt of assays from the laboratory and complete QAQC checks.
•
Update the geological model once all analysis results have been received.
•
Assess results from preliminary sighter metallurgical testwork programme once received.
•
Engagement of a consulting MRE specialist to commence MRE update of the Canegrass
Project using newly acquired data.
END
ASX:VKA | vikingmines.com
12
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Sarah Wilson - Company Secretary
+61 8 6245 0870
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Target, Exploration Results is based on information compiled
by Mr Julian Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) –
305446). Mr Woodcock is a full-time employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which
is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the disclosure of the
information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resources
The information in this report that relates to Mineral Resources is based on, and fairly reflects, information compiled
by Mr Aaron Meakin, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy.
Mr Meakin is a consultant to Flinders Mines Ltd and Viking Mines Ltd, employed by CSA Global Pty Ltd, independent
mining industry consultants. Mr Meakin has sufficient experience relevant to the style of mineralisation and type of
deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined
in the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore
Reserves (JORC Code). The Company is not aware of any new information or data that materially affects the
information included in the original market announcements and that all material assumptions and technical
parameters underpinning the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcement on 30 November 2022.
ASX:VKA | vikingmines.com
13
APPENDIX 1 – TENEMENTS HELD OR WITH AN AGREEMENT FOR ACCESS TO
ACQUIRE AN INTEREST AS AT 30 JUNE 2023
Australia
License
name
Location
License type
License Holder/
JV Partners*
Viking Mines
Ownership/Involvement
Western
Red Dirt Mining Pty
Mining Licence
100%
Australia
Ltd
Western
Red Dirt Mining Pty
M30/0099
Mining Licence
100%
Australia
Ltd
Western
Prospecting
Red Dirt Mining Pty
P30/1125
100%
Australia
Licence
Ltd
Western
Prospecting
Red Dirt Mining Pty
P30/1144
100%
Australia
Licence
Ltd
Western
Exploration
E29/1133
Viking Mines Ltd
100%
Australia
Licence
Western
Exploration
E30/0529
Viking Mines Ltd
100%
Australia
Licence
Western
Prospecting
P29/2652
Viking Mines Ltd
100%
Australia
Licence
Western
Prospecting
P30/1137
Viking Mines Ltd
100%
Australia
Licence
Western
Prospecting
Viking Critical
P58/1943
100%
Australia
Licence
Minerals Pty Ltd
Western
Prospecting
Viking Critical
P58/1942
100% (under application)
Australia
Licence
Minerals Pty Ltd
Western
Prospecting
Viking Critical
E58/0604
100% (under application)
Australia
Licence
Minerals Pty Ltd
Western
Exploration
E29/1131
Viking Mines Ltd
100% (under application)
Australia
Licence
Western
Exploration
Red Dirt Mining Pty
E29/1169
100% (under application)
Australia
Licence
Ltd
Western
Exploration
Baudin Resources
0% (option over exclusive area
E30/0517
Australia
Licence
Pty Ltd.
over part of the tenement)
Western
Exploration
Flinders Canegrass
E58/0232
Australia
Licence
Pty Ltd
Western
Exploration
Flinders Canegrass
E58/0236
Australia
Licence
Pty Ltd
Western
Exploration
Flinders Canegrass
E58/0282
Australia
Licence
Pty Ltd
0% (under Farm-In
arrangement)
Western
Exploration
Flinders Canegrass
E58/0520
Australia
Licence
Pty Ltd
Western
Exploration
Flinders Canegrass
E58/0521
Australia
Licence
Pty Ltd
Western
Exploration
Flinders Canegrass
E58/0522
Australia
Licence
Pty Ltd
i)
Red Dirt Mining Pty Ltd and Viking Critical Minerals are 100% owned subsidiaries of Viking Mines Ltd.
M30/0091
ASX:VKA | vikingmines.com
14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VIKING MINES LIMITED
ABN
Quarter ended (“current quarter”)
38 126 200 280
30 JUNE 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
Year to date
(12 months)
$A’000
(127)
(473)
(d) staff costs
(104)
(376)
(e) administration and corporate costs
(312)
(812)
21
38
1,221
1,221
699
(402)
(a) exploration & evaluation
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)1
1.9
Net cash from / (used in) operating
activities
1.
Reflects proceeds from Ghana litigation (refer ASX announcement 26 April 2023)
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(a) entities
(b) tenements
-
(50)
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(12 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
Cash and cash equivalents at beginning of
period
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
4.3
4.4
-
(50)
-
-
3,351
4,445
699
(402)
Net cash from / (used in) investing activities
(item 2.6 above)
-
(50)
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(12 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
82
139
4.6
Cash and cash equivalents at end of
period
4,132
4,132
5.
Reconciliation of cash and cash
equivalents
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
Current quarter
$A’000
Previous quarter
$A’000
5.1
Bank balances
4,132
3,351
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
4,132
3,351
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
96
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
-
Current quarter
$A'000
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 3
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
7.
Financing facilities
Note: the term “facility’ includes all forms of financing
arrangements available to the entity.
Add notes as necessary for an understanding of the
sources of finance available to the entity.
Total facility
amount at quarter
end
$A’000
Amount drawn at
quarter end
$A’000
7.1
Loan facilities
7.2
Credit standby arrangements
7.3
Other (please specify)
7.4
Total financing facilities
7.5
Unused financing facilities available at quarter end
7.6
Include in the box below a description of each facility above, including the lender, interest
rate, maturity date and whether it is secured or unsecured. If any additional financing
facilities have been entered into or are proposed to be entered into after quarter end,
include a note providing details of those facilities as well.
8.
Estimated cash available for future operating activities
8.1
Net cash from / (used in) operating activities (item 1.9)
8.2
(Payments for exploration & evaluation classified as investing
activities) (item 2.1(d))
8.3
Total relevant outgoings (item 8.1 + item 8.2)
8.4
Cash and cash equivalents at quarter end (item 4.6)
8.5
Unused finance facilities available at quarter end (item 7.5)
8.6
Total available fund
Share your feedback