VKA DELIVERS SUCCESSFUL PIT OPTIMISATION 61MT AT 0.81% V2O5
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
18 March 2024
VIKING DELIVERS SUCCESSFUL PIT OPTIMISATION
WITH 61MT AT 0.81% V2O5 & 35.9% FE OPEN PIT
Cautionary Statement: The Pit Optimisation Study referred to in this announcement is based on low-level
technical and economic assessments and is insufficient to support estimation of Ore Reserves or to provide
assurance of an economic development case at this stage, or to provide certainty that the conclusions of
the POS will be realised. The POS is preliminary in nature and not intended as a Scoping or Feasibility Study.
•
Viking successfully completes a Pit Optimisation Study (“POS”) on the Canegrass
Battery Minerals Project (“the Project”) Mineral Resource Estimate (“MRE”) with;
61Mt at 0.81% V2O5, 35.9% Fe, 7.6% TiO2, 714ppm Cu, 687ppm Ni & 177ppm Co
(0.7% V2O5 cut-off) Inferred (JORC 2012) Pit constrained MRE.
•
POS input pricing assumptions reflect current commodity pricing with A$8.96/lb
(US$6/lb) V2O5 and A$150/t (US$101/t) Fe concentrate (58% fines) and current
industry costs.
•
Results deliver in excess of 2X Viking’s stated strategic objective of defining >30Mt
high-grade open pitable resource.
•
Six pit optimisation scenarios completed, assessing various revenue streams for
V2O5, Fe, Cu, Ni & Co & at different cut-offs to determine the highest value options.
•
All six Pit Optimisations proved highly successful, delivering in pit Mineral
Resources ranging from 31Mt to 92Mt, indicating the robust nature of the Project.
•
The POS provides direct targets for follow up drilling to seek to improve the MRE
confidence to Indicated+ (JORC 2012) ahead of commencing a Scoping Study.1
Viking Mines Ltd (ASX: VKA) (“Viking” or “the Company”) is pleased to provide an update
on the outcomes of the highly anticipated Pit Optimisation Study (“POS”) for the Canegrass
Battery Minerals Project (“the Project” or “Canegrass”), located in the Murchison region of
Western Australia.
The POS has proven highly successful with all scenarios producing pit shells (Figure 1) that
demonstrate the potential for positive economic viability under the assumptions used. The
Company has used current input cost parameters and commodity pricing and combined with
recent metallurgical results, demonstrating a robust Project with outstanding potential.
Viking Mines’ MD & CEO, Julian Woodcock, commenting on the results of the POS said:
“The results of the POS have exceeded my expectations and reaffirmed the Company’s belief
that there is substantial inherent value within this exceptional Vanadium/Magnetite Project.
“The Company took a conservative approach when considering the input assumptions to
ensure that the results provided a robust outcome, warranting moving to the next stage of
investment to carry the Project forward.
“The study has delivered and appears robust, even at our most conservative scenario where
only revenue from Vanadium is assumed. Allowing for additional revenue from the Iron,
Copper, Nickel and Cobalt further substantially reinforces the Project.
”We will now continue to advance the metallurgical studies on the Project and commence with
evaluation of the pit shells to determine what drilling is required to increase the Mineral
Resource confidence ahead of commencing a Scoping Study.”
1 Viking Mines (ASX:VKA) ASX Announcement 20 November 2023 – VKA Resource Update Delivers over 100% Growth at Canegrass
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Figure 1; Isometric view to NE showing the pits generated at the Fold Nose, Kinks South, and Kinks Deposits with the pit constrained JORC
(2012) MRE’s noted respectively. Note all Mineral Resources are Inferred category reported above a 0.7% V2O5 cut-off.
CANEGRASS PROJECT PIT OPTIMISATION STUDY
Industry consultants, MEC Mining have completed the POS on the Canegrass
Project’s Global MRE completed in the December quarter 2023.1 The POS is another major
technical advancement achieved by the Company at Canegrass.
The POS has proven extremely successful, delivering multiple open pit scenarios for each of
the three deposits that make up the Canegrass Project.
Importantly, all outcomes have delivered sufficient in-pit Mineral Resources to support
continued progression toward Viking’s stated strategic objectives of delivering an operation
that meets a >15 years mine life at 1.5-2.0Mtpa (>30Mt total) and with an average in-situ
grade of 0.81% V2O5.
A thorough industry standard process has been followed to assess the Canegrass Project’s
Global MRE to determine what portions of the Global MRE demonstrate the highest value,
and warrant further follow up drilling to increase the MRE category and confidence. The Pit
Optimisation Process section below discusses this in further detail.
ASX:VKA | vikingmines.com
2
Pit Optimisation Results – Base Case Scenario
The Company has selected the Base Case scenario at a 0.7% V2O5 processing cut-off for
ongoing further evaluation of the Project. This delivers a substantial pit constrained highgrade, low strip-ratio Inferred category JORC (2012) MRE of:
61Mt at 0.81% V2O5, 35.9% Fe, 7.6% TiO2, 714ppm Cu,
687ppm Ni & 177ppm Co
The optimisation generates pits on each of the three deposits (Figure 1) at Fold Nose (Figure
4), Kinks and Kinks South (Figure 3) with a breakdown provided on Table 1.
Table 1; Base Case Canegrass Project MRE broken out by deposit and reported within pit constrained mineral resources.
Results are reported to JORC (2012) guidelines and are in-situ tonnage and grades.
Cut-off % JORC (2012) Tonnage V2O5
V2O5
Classification
(Mt)
%
Fe
%
Cu
%
Ni
%
Co
%
Fold Nose
0.7
Inferred
39.0
0.81
36.0
0.068
0.070
0.018
TiO2
%
7.6
Kinks
0.7
Inferred
15.9
0.77
35.5
0.080
0.065
0.018
7.4
Kinks South
0.7
Inferred
6.3
0.85
36.7
0.074
0.069
0.018
7.8
Total
0.7
Inferred
61.2
0.81 35.9
0.071
0.069
0.018
7.6
Deposit
This scenario has been determined as the most suitable for further evaluation as it considers
revenue from both the Vanadium and Iron from the Project, which is supported by the current
level of metallurgical testwork completed2 and the results achieved.
A 0.7% V2O5 cut off grade was chosen, as no additional tonnes are anticipated to be necessary
at this stage of the Project assessment. The elevated cut off ensures a Mineral Resource of
higher grade, thereby enhancing the value per tonne of mineralisation.
However, it is important to note that there remain substantial tonnages within the Mineral
Resource that have demonstrated viability in the POS at lower cut-off grades and extend the
pits deeper. In addition, >10Mt at 0.62% V2O5 occurs below the selected processing cut-off
of 0.7% V2O5 within the Base Case pits (Figure 2). This material would be stockpiled for future
treatment at the end of mine life, presenting further upside to the Project.
Figure 2; Grade Tonnage curve for Base Case scenario at 0.7% V2O5 cut-off. Note >10Mt at 0.62% V2O5 below the reporting cut-off.
2
Viking Mines (ASX:VKA) ASX Announcement 6 March 2024 – VKA Achieves 1.43% V2O5 & 59% Fe in High Quality Concentrate
Viking Mines (ASX:VKA) ASX Announcement 11 March 2024 – Viking Achieves Roasting Success and 93.2% V2O5 Recovery
ASX:VKA | vikingmines.com
3
Figure 4; Isometric view to the SW of the Fold Nose Deposit and the Base Case scenario open pit. Shown within the pit
is the MRE bock models, colour coded by V2O5 % grade and reported above 0.7% V2O5 % cut-off.
Figure 3; Isometric view to the East of the Kinks and Kinks South Deposits and the Base Case scenario open pits. Shown within
the pits are the MRE block models, colour coded by V2O5 % grade and reported above 0.7% V2O5 % cut-off.
ASX:VKA | vikingmines.com
4
Pit Optimisation Study Process
The POS utilised the MRE Ore Block Model (“OBM”), costs, pricing, and other inputs, to
determine the Ultimate pit shell at different processing cutoffs for each deposits MRE. The
Ultimate pit shells do not consider mine schedule, pit designs, and the discounted cost of
money, and are not the Optimal pit shells.
The Company selected three revenue stream scenarios to be assessed in the POS (Table 2).
Each of these scenarios were further refined by adjusting the minimum cut-off grade for
Vanadium (as V2O5) to allocate ore for processing. This resulted in six runs being completed
on each of the three deposits (Fold Nose, Kinks and Kinks South).
The various commodity revenue streams and cut-off grades were selected to determine the
sensitivity of the MRE to revenue. This methodology identifies the highest value portions of
the MRE, in effect by minimising the revenue stream. Pits formed in all scenarios highlight
areas for priority follow up as these areas produce the best potential returns.
Table 2; Matrix of pit optimisations completed, and respective commodities used and cut-offs evaluated.
Processing
Cut-off
0.6% V2O5
0.7% V2O5
Base
Case
Commodities Used
Best
Worst
Case
Case
V2O5 & Fe
V2O5, Fe, Cu,
Ni & Co
V2O5
Input Assumptions
To generate the open pits, a series of input assumptions are required and fall under four
categories, with Table 3 below providing all the assumptions used:
1.
2.
3.
4.
Revenue pricing for commodities.
Operating costs.
Metallurgical recoveries.
Mining parameters for pit slopes, dilution and recovery.
The Company undertook an extensive process to source all the required information that
reflects the current operating environment from a perspective of costs and revenue (items 1
and 2). This included obtaining quotes where appropriate/available and sourcing other
information from publicly available data.
Metallurgical assumptions (item 3) were applied based on the Company’s testwork results. It
is important to note that further metallurgical testwork has been completed demonstrating
that a higher recovery of Vanadium may be achievable at the roasting stage. This has
increased the overall recovery of Vanadium within the resource from 74.4% used in the POS
to an upper level of 86.6% determined in the metallurgical sighter roasting testwork.2
This 12.2% increase will have a significant positive effect on the optimisations, however due
to the advanced nature of the optimisations when the additional metallurgical data became
available, the Company elected not to repeat the optimisation work already completed.
Industry standard values were applied for the mining parameters (item 4), reflective of the
geology and mineralisation being assessed.
All assumptions (Table 3) were reviewed and agreed with MEC Mining and subsequently
input into the pit optimisation software. The software uses the values provided to calculate
the optimum pits by calculating cashflow from the MRE blocks based on their respective
grades and cost of extraction.
All three scenarios have proved successful and delivered optimised pit shells.
ASX:VKA | vikingmines.com
5
Table 3; Input assumptions used for the Pit Optimisation Study for each of the Base, Best and Worst case scenarios.
Category
Item
Parameter
Commodity Commodities Used
1. Revenue
Pricing
Exchange Rate
Base
Case
Best
Case
n/a
V2O5 & Fe
V2O5, Fe, Cu,
Ni & Co
US$/A$1
Commodity
Pricing for
Revenue
Processing
Costs
Iron
Concentrate
Copper
Concentrate
Nickel
Concentrate
Cobalt
Concentrate
A$/t
$150.81
n/a
n/a
$8,299
n/a
n/a
$16,301
n/a
n/a
$28,294
n/a
$5.32
Base mining cost to 90m depth $/t mined from
the pits.
MCAF
90-250m
$0.48
Increase cost $/t over base cost applied to each
20m bench with increasing depth.
Kinks & Kinks
South
Fold Nose
A$/t ore
feed
$51.10
$52.69
$51.10
$51.32
$52.91
$51.32
G&A
$10.00
V2O5 Flake
$1,438.07
$84.82
n/a
n/a
$647.04
n/a
Nickel Concentrate
n/a
$1,199.16
n/a
Cobalt
Concentrate
n/a
$2,026.73
n/a
Copper
Concentrate
A$/t
3. Metallurgical
Recoveries
4. Mining
Parameters
57.6%
57.6%
n/a
Copper
n/a
0.0%
n/a
n/a
0.0%
n/a
n/a
0.0%
n/a
%
recovered
from ore
feed to
mill
83.3%
n/a
Copper
n/a
80.0%
n/a
Nickel
n/a
80.0%
n/a
Cobalt
n/a
70.0%
n/a
Ore
0 -20m
t/m
3
degrees
<20m
Mining
Factors
74.4%
83.3%
Waste
Dilution
All costs associated with shipment of products
from site via road to Geraldton Port and shipment
overseas to smelters/customers plus royalties.
30.0%
Iron
Nickel
Total cost of ore haulage, grinding & roasting to
produce V2O5 flake. Increased cost of $3/t
concentrate for best case scenario to produce
sulphide concentrate.
General & Administration cost to cover camp,
accommodation, flights & mine management.
$84.82
Iron
Pit Slopes
65% of commodity spot price for sale of sulphide
concentrates.
A$/t
Vanadium
Rock
Density
Based on spot price of US$126.17/t 58% fines
with 20% discount applied for Ti content.
Mining Cost
Cobalt
Fresh ore
Revenue calculated from commodities listed for
each optimisation scenario.
Based on US$6/lb 98% V2O5 flake at exchange
rate of US$0.67/A$1.
$150.81
Vanadium
Oxide /
Transition
ore
V2O5
$8.96
Iron Concentrate
Selling costs
Worst
Notes
Case
$0.67
V2O5 Flake
Mining
Costs
2. Operating
Costs
Units
%
Recovery
ASX:VKA | vikingmines.com
Reduced recoveries in oxide/transition material
assumed. No recovery of sulphides (Cu, Ni & Co)
due to weathering preventing floatation.
Vanadium recovered in all scenarios. Iron in base
and best case. Cu, Ni & Co only recovered in best
case. NOTE: Since completing POS, further
metallurgical testwork has determined an overall
recovery from ore feed for V2O5 up to 86.6%.
This presents significant upside opportunity for
the Project with up to 12.2% additional potential
cashflow for Vanadium over that assumed in the
POS.
In OBM
Estimated in to the Ore Block Model using
downhole density logging data.
3.6
Assumed average density based on review of
downhole logging data through waste zones.
31o
Shallower slopes in weathered rock.
44o
Steeper slopes in fresh rock.
2.5%
Assumes 1m dilution over 40m thick zone.
95%
Ore recovered from the pits by mining due to
losses occurring in mining process.
6
Pit Optimisation Results – Revenue Sensitivity
The results of the revenue sensitivity completed via incorporating different revenue streams
from the various commodities is very encouraging. Table 4 below provides a summary of the
MRE within each of the pits for each of the cases assessed and Figure 6 and Figure 5 show
the various pit limits at each deposit for the respective scenarios.
Table 4; In-Pit MRE Inferred Category (JORC 2012) for each of the Pit Optimisation scenarios investigated. Note, where
grades are reported as ‘n/a’ for Fe, Cu, Ni & Co in the Base and Worst case scenarios is due to the commodity not being
used in the assessment, . These commodities are present but not reported by the software in these scenarios.
Scenario
Cut-Off Grade (V2O5%)
Resource Tonnage (Mt)
V2O5 Grade (%)
Fe Grade (%)
Cu Grade (%)
Co Grade (%)
Ni Grade (%)
Waste Tonnes (Mt)
Strip Ratio
Worst
0.7
0.6
32.1 45.2
0.81 0.78
n/a
n/a
n/a
n/a
n/a
n/a
n/a
n/a
127
156
4.1
3.5
Base
0.7
0.6
61.2 81.8
0.81 0.77
35.9 34.7
n/a
n/a
n/a
n/a
n/a
n/a
272
359
4.8
4.5
Best
0.7
0.6
60.4 94.1
0.81 0.76
36.2 34.3
0.071 0.067
0.018 0.017
0.069 0.067
319
496
5.4
5.4
Whilst the Company has selected the Base Case (0.7% V2O5 cut-off) to focus on for further
assessment, the results of the other scenarios demonstrate a sizeable and robust MRE for
further investigation, with even with the worst-case scenario delivering 31.1Mt at 0.81% V2O5.
This worst-case scenario still meets the Company’s stated strategic objective of >30Mt, which
would provide a >15-year operation at a throughput of 2Mtpa.
With the Best Case scenario at 0.6% V2O5 cut-off delivering a substantial 94.1Mt at 0.76%
V2O5, there is significant scope and opportunity to investigate both lower-grade, higher
tonnage operations vs higher-grade lower tonnage operations. The strip ratio in all scenarios
is low and ranges from 4.1 to 5.4, providing options for a small size mining fleet.
The range of outcomes identified with these results provides significant optionality for the
Company to pursue in the future.
FORWARD STRATEGY
With the successful completion of the POS and the identification of a substantial mineral
resource showing potential economic viability under the assumptions used, the Company is
encouraged to continue advancing towards undertaking a Scoping Study for the Project.
The Company plans to seek to increase the confidence in the Mineral Resource by
increasing this to Indicated+ category (JORC 2012). The Company will initially focus on the
Fold Nose Deposit as the in-pit MRE is of sufficient size (Figure 4; 39Mt at 0.81% V2O5) to
assess the potential for a 15+ year mine life Project, with optionality remaining for further
feed from Kinks and Kinks South.
In parallel, the Company will commence engaging external consultants to provide advice
and input on other factors required for the Scoping Study, such as environmental,
hydrology, and geotechnical with the objective of advancing these aspects in parallel.
Metallurgical testwork is ongoing and will continue, with further testwork planned
to investigate options for producing a sulphide concentrate to potentially release the value
of the Cu, Ni and Co within the Project. Work will also commence to determine if an
ilmenite concentrate can be produced at the magnetic separation stage to separate the
Titanium from the Iron and potentially produce a further revenue stream for the Project
which has not yet been considered.
ASX:VKA | vikingmines.com
7
Figure 6; Plan view of the Fold Nose Deposit with each of the pit limits shown for the respective Pit Optimisation scenarios completed.
Figure 5; Plan view of the Kinks and Kinks South Deposits with the pit limits shown for each of the respective Pit Optimisation
scenarios completed.
ASX:VKA | vikingmines.com
8
NEXT STEPS
With the completion of the POS and the definition of substantial mineral resources
constrained within open pits, the Company has achieved yet another significant milestone
for Canegrass. Work continues to advance the Project forward with the following key items
underway:
•
Second stage metallurgical testwork well advanced, with Vanadium extracted from the
magnetite via conventional roasting methodology and progressing with bulk roast testing
and purification to produce >98% V2O5 flake.
•
Review of Pit Optimisation Study outputs and assessment of infill drilling requirements to
increase the Mineral Resource confidence to Indicated+ (JORC 2012).
•
Engaging external consultants to review requirements for further studies to advance the
Project, including environmental, hydrology and geotechnical ahead of commencement
of a Scoping Study.
END
This announcement has been authorised for release by the Board of Directors.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When used in
this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions
are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be
consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results and exploration target is based on information compiled by Mr Julian
Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a
full-time employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and
type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents
to the disclosure of the information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resources & Pit Optimisation
The information in this announcement that relates to the Mineral Resource estimate and Pit Optimisation is derived from information
compiled by Mr Dean O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and Competent
Person for this style of mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC Mining, an
independent mining and exploration consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the
2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code).
Mr O’Keefe consents to the inclusion in the report of the matters based on the results in the form and context in which they appear.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the
information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS
Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr
Connelly has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting
of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. The Company confirms that the form and context
in which the Competent Person’s findings are presented have not been materially modified from the original announcements.
ASX:VKA | vikingmines.com
9
CANEGRASS BATTERY MINERALS PROJECT
The Canegrass Battery Minerals Project is located in the Murchison region, 620km north-east
of Perth, Western Australia. It is accessed via sealed roads from the nearby township of Mt
Magnet to within 22km of the existing Resources. The Project benefits from a large
undeveloped Inferred Vanadium Resource hosted in vanadiferous titanomagnetite (VTM)
Mineralisation as part of the Windimurra Layered Igneous Complex.
The Project benefits from ~95km2 of exploration tenements with very limited follow up
exploration targeting the growth potential of the vanadium pentoxide (V2O5) Resources in
the +10 years since the Resource was first calculated. Multiple drill ready targets are present
which have the potential to significantly add to the already large Resource base, with high
grade intercepts presenting an opportunity to substantially increase the average grade.
JORC (2012) MINERAL RESOURCE
The Canegrass Mineral Resource has been calculated across three separate areas called the
Fold Nose, Kinks and Kinks South deposits, each with. The Resource has subsequently been
reported above a cut-off grade of 0.5% V2O5 and above the 210 RL (equivalent to a maximum
depth of ~250m).
Canegrass Project Vanadium Mineral Resource estimate, 0.5% V 2O5 cut-off grade, >210m RL (due to the effects of
rounding, the total may not represent the sum of all components). Error! Bookmark not defined.
Target Commodities
Deleterious Elements
JORC (2012) Cut-Off Tonnage
Ni
Co Al2O3 SiO2
P
V2O5 Fe TiO2 Cu
Classification V2O5%
(Mt)
%
%
%
%
%
%
%
%
%
VKA 2023 Model
Inferred
>0.5
146
0.70 31.8 6.6 0.066 0.062 0.016 11.7 21.7 0.005
MRE
LOI
%
1.7
VIKING MINES FARM-IN AGREEMENT
Viking, via its wholly owned subsidiary, Viking Critical Minerals Pty Ltd, commenced with a
Farm-In arrangement with Red Hawk Mining Ltd (formerly Flinders Mines Ltd) (ASX:RHK) on
28 November 2022 to acquire an equity interest in the Canegrass Battery Minerals Project.
Through the terms of the Farm-In, Viking can acquire up to 99% of the Project through
completion of 4 stages via a combination of exploration expenditure of $4M and staged
payments totalling $1.25M over a maximum period of 54 months. If Viking complete the
Farm-In to 99% equity interest, Red Hawk Mining may offer to sell to Viking the remaining 1%
of the Project for future production and milestone related payments totalling $850,000. If Red
Hawk Mining do not offer to sell within a prescribed timeframe their right lapses, they must
offer Viking the right (but not the obligation) to buy the remaining 1% for the same terms.
The Project has a legacy 2% Net Smelter Royalty over the project from when Red Hawk Mining
acquired it from Maximus Resources in 2009.
As of August 2023, Viking has completed the first stage of the Farm-In and acquired a 25%
equity interest in the tenements hosting the Deposits.
ASX:VKA | vikingmines.com
10
VANADIUM REDOX FLOW BATTERIES – GREEN ENERGY FUTURE
Viking Mines recognise the significant importance of Vanadium in decarbonisation through
the growth of the Vanadium Redox Flow Battery (“VRFB’s”) sector.
VRFB’s are a developing market as an alternate solution to lithium-ion (“Li-ion”) in specific
large energy storage applications. Guidehouse Insights Market Intelligence White Paperi
published in 2Q 2022 forecasts the VRFB sector to grow >900% by 2031 through the
installation of large, fixed storage facilities (Figure 7).
Figure 7; Forecast growth of the VRFB Sector through to 2031 (source – Guidehouse Insightsi)
The reason for this forecast growth is that VRFB’s have unique qualities and advantages over
Li-ion in the large energy storage sector to complement renewable energy sources to store
the energy produced. They are durable, maintain a long lifespan with near unlimited
charge/discharge cycles, have low operating costs, safe operation (no fire risk) and have a
low environmental impact in both manufacturing and recycling. The Vanadium electrolyte
used in these batteries is fully recyclable at the end of the battery’s life.
Importantly, and unlike Li-ion, the battery storage capacity is only limited by the size of the
electrolyte storage tanks. This means that with a VRFB installation, increasing energy storage
capacity is only a matter of adding in additional electrolyte (via the installation of additional
electrolyte storage tanks) without needing to expand the core system components.
Increasing the energy storage directly reduces the levelized cost per kWh over the
installation’s lifetime. This is not an option with Li-ion batteries.
It is for these reasons that VRFB’s are an ideal fit for many storage applications requiring
longer duration discharge and more than 20 years of operation with minimal maintenance.
i) Guidehouse Insights White Paper Vanadium redox Flow Batteries Identifying Market Opportunities and Enablers Published 2Q 2022
https://vanitec.org/images/uploads/Guidehouse_Insights-Vanadium_Redox_Flow_Batteries.pdf
ASX:VKA | vikingmines.com
11
APPENDIX 1 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Nature and quality of sampling (e.g. cut
channels, random chips, or specific
specialised industry standard
measurement tools appropriate to the
minerals under investigation, such as
downhole gamma sondes, or handheld
XRF instruments, etc.). These examples
should not be taken as limiting the broad
meaning of sampling.
Sampling
techniques
Include reference to measures taken to
ensure sample representivity and the
appropriate calibration of any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report. In cases where ‘industry
standard’ work has been done this would
be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m
samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’).
In other cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
ASX:VKA | vikingmines.com
Commentary
Viking Mines 2023 Drilling
In 2023, RC drilling collected samples during the drilling process using industry standard techniques including face sampling drill bit and cone splitter.
Chip samples are collected from the drill cuttings and sieved and put into chip trays for geological logging.
Historical Information
WMC Rock chip samples were collected from outcrop identified during geological mapping. The historical reports do not detail how the samples were
selected or taken.
WMC and Maximus Resources Percussion and Reverse Circulation drilling samples were collected from drillholes. Samples are taken from the
pulverised and broken rock material produced by the drilling process. No information in the historical reports details any specific methods were
employed.
WMC and Maximus Resources Diamond Drilling samples were collected from the drillcore by cutting the core to produce a whole rock sample. No
information in the historical reports details any specific methods were employed other than those detailed in the sections below.
Red Hawk Mining (formerly Flinders Mines) collected RC and diamond samples for analysis. All samples are safely sealed in labelled calico bags. There
was no downhole geophysics assisting in the sampling.
Rock chip samples collected by CSA Global for Red Hawk Mining were collected from outcrop identified during geological mapping. The historical
reports do not d
Share your feedback