DRILLING RESUMES AT FIRST HIT GOLD PROJECT PRIORITY TARGETS
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
9 January 2025
DRILLING RESUMES AT FIRST HIT GOLD PROJECT TO TEST
ZULEIKA SHEAR PRIORITY TARGETS
•
Drilling has resumed at the First Hit Gold Project after the pause which commenced midDecember due to unseasonably high rainfall events
•
Remaining 26 holes for ~3,120m of the Phase 1 programme is scheduled for completion
before the end of January
•
This programme forms part of a larger expanded ~20,000m RC drill programme envisaged to
be undertaken by the Company across this highly prospective land position
•
Viking’s ~20,000m drill programme is focussed on 25km strike of Zuleika Shear which
adjoins Ora Banda Mining >1.3Moz Riverina-Mulline Camp
Viking Mines Limited (ASX: VKA) ("Viking" or "the Company") is pleased to announce that drilling
has re-commenced at the First Hit Gold Project (“Project”), located 45km west of Menzies and 2 hours
north of Kalgoorlie in the Eastern Goldfields region of Western Australia (Figure 1 & Figure 2).
As part of the Company’s ongoing strategy to unlock the potential of its high-grade gold assets, the
resumed Phase 1 drill programme will see the remaining 3,120m of the ~5,750m of Reverse Circulation
(RC) drill programme completed in January, subject to no further unforeseen delays.
This Phase 1 drill programme forms part of a larger programme envisaged to encompass ~20,000m
drilling at the First Hit Gold Project along the highly prolific Zuleika Shear and immediately adjacent to
Ora Banda Mining’s (ASX:OBM) >1.3Moz Riverina-Mulline Camp (Figure 4).
Drilling has re-commenced on the second drill traverse at the Northern Duplex target situated in the
northern part of the Company’s 25km strike length of the Zuleika Shear. Drillhole VKRC0112 has been
completed and the rig has moved to VKRC0111 (Figure 2 & Figure 3).
Viking’s granted and fully controlled tenure in this district now stands at a substantial ~283km2, with
additional tenement applications in process bringing the total land package to ~480km2 (Figure 4).
Viking Mines Managing Director & CEO Julian Woodcock said:
“I am very pleased that we have promptly recommenced drilling at the Northern Duplex prospect to
continue testing this high priority drill target.
“With two drill traverses still to be drilled, we still have a large area to test with the drill bit at the Northern
Duplex Target.
“This target represents a parallel trend to the Riverina-First Hit mineralisation, with key structural and
geochemical positions to be tested in this initial round of RC drilling.
“Planning is also underway for the Phase 2 programme which will see initial drill testing of other targets
across Viking’s large landholding.
“I look forward to updating the market in due course with the results of the drilling.”
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Figure 2; Topdrill RC drill rig drilling on hole VCRC0111 on the second of three drill traverses at
the Northern Duplex Target.
Figure 1; Drone image looking to the NE over the Northern Duplex Target showing first and second drill traverses. Note the
wide spacing of the drill traverses being undertaken with the first pass drilling being undertaken at this prospective target
area.
ASX:VKA | vikingmines.com
2
Figure 3; Priority Untested Targets along 25km strike of Zuleika Shear, immediately East of First Hit Gold Mine.
ASX:VKA | vikingmines.com
3
Figure 4; Map of Viking Mines tenure, neighbouring ASX listed tenement holders and the location of significant gold mines in respect
to the Company's Project. Note the extensive strike length of the Zuleika Shear on Viking controlled tenure. Background image is
Total Magnetic Intensity 1VD RTP.
ASX:VKA | vikingmines.com
4
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When
used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar
expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is
a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time
employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
ASX:VKA | vikingmines.com
5
FIRST HIT PROJECT, WESTERN AUSTRALIA
The First Hit Project is centred around the historic high-grade First Hit gold mine situated along the
prospective Ida and Zuleika Shear zones in the Eastern Goldfields of Western Australia. The Project
incorporates ~480km2 of tenements with 7 active Mining and Prospecting licences, 5 Exploration
licences, and 3 Exploration licences under application. At the core of this landholding is a 6.4km2 group
of contiguous tenements which host the historic First Hit gold mine.
Prior to closure of the First Hit gold mine by Barra Resources in 2002 and at a time of depressed gold
prices of US$320/oz, the First Hit mine produced ~30koz ounces of gold at an average grade of ~7.7g/t
Au. The Company is focused on delivering exploration programmes to test near mine extensions and
regional targets around the First Hit Project with the objective of defining fertile structures and
discovering gold ounces.
The Project area is well serviced by infrastructure and is located 50km west of the sealed Goldfields
highway and the township of Menzies. The nearest operating Gold Processing Plant is the Davyhurst Mill
40km to the south, owned and operated by Ora Banda Mining (ASX:OBM). The nearest operating gold
mine is the Riverina open pit, located 8km south of the First Hit gold mine, owned by OBM.
*See Appendix 1 for data source references
ASX:VKA | vikingmines.com
6
APPENDIX 1 – DATA SOURCES FOR MINERAL RESOURCE ESTIMATES AND MINE
PRODUCTION REFERENCED ON MAP IN FIGURE 1.
Riverina-Mulline Camp
Historical production: 305koz Au5
Measured, Indicated & Inferred Mineral Resource: 854koz Au6
OBM Production (FY21-23): 170koz Au7,8,9
TOTAL: 1,333koz
Central Davyhurst Camp
Historical production: 811koz Au1
2024 Indicated & Inferred Mineral Resource: 396koz Au2
TOTAL: 1,207koz Au
Bullant
Historic Production: 354koz Au3
Measured, Indicated & Inferred Mineral Resource: 462koz Au4
TOTAL: 816koz
Kundana Camp
Historic Production to June 2020: 2.75Moz Au10
FY21 to FY24 Production: 291,853oz Au11,12,13,14
Current Ore Reserves: 464koz Au15
Frogs Leg Mineral Resources: 770koz Au16
TOTAL 4.28Moz
Mt Ida
Historical production: 290koz Au19
2024 Indicated & Inferred Mineral Resource: 752koz Au20
TOTAL: 1,042koz Au
Bottle Creek
Historic Production: 90koz Au17
Alt Resources Quarterly Report 30 June 2020 - JORC Resource & Reserve Table: 370koz Au17
TOTAL 460koz
Map Source References
1) https://orabandamining.com.au/projects/davyhurst/
2) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
3) https://www.miningnews.net/precious-metals/news/1233885/bullant-gold-packs-bite
4) https://nortongoldfields.com.au/bullant/
5) https://orabandamining.com.au/projects/davyhurst/
6) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
7) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2021/?wpdmdl=7200&refresh=6736e1d72a3a51731650007
8) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2022/?wpdmdl=8803&refresh=6736e1d71beab1731650007
9) https://orabandamining.com.au/download/annual-report-2023/?wpdmdl=11152&refresh=6736e1d703e691731650007
10) https://randmining.com.au/projects/east-kundana-joint-venture/
11) https://app.sharelinktechnologies.com/announcement/asx/44dffa9bc8eaaa574af7cfda9564c595
12) https://app.sharelinktechnologies.com/announcement/asx/690381347ddb79dc8261b0f775636da7
13) https://app.sharelinktechnologies.com/announcement/asx/b13d0741e08843fb98f0e8c8be20eaaa
14) https://app.sharelinktechnologies.com/announcement/asx/00592059cc0f5c205e3eb6cfa25f3e4d
15) https://evolutionmining.com.au/storage/2024/02/2680687-Annual-Mineral-Resources-and-Ore-Reserves-Statement.pdf
16) https://evolutionmining.com.au/storage/2015/08/01647903.pdf
17) https://www.asx.com.au/asxpdf/20171108/pdf/43p1pnwsv6kd3g.pdf
18) https://www.asx.com.au/asxpdf/20200814/pdf/44lj6rj9wqk8r0.pdf
19) https://en.wikipedia.org/wiki/Mount_Ida_Gold_Mine
20) https://deltalithium.com.au/our-projects/mt-ida-lithium-gold/
ASX:VKA | vikingmines.com
7
Share your feedback
Discover