Quarterly Report for the period ended 30 June 2025
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
28 July 2025
QUARTERLY REPORT FOR THE PERIOD ENDED
30 JUNE 2025
Riverina East Project
•
Assays returned for infill shallow auger drilling at Bifrost defined a second, large
>300m long >40ppb gold anomaly within a larger >700m 20ppb gold anomaly.
•
6,000m phase 2 regional drill program completed targeting first drilling at the
Central Duplex Target and follow up testing at Bifrost.
o
Assays received from the Bifrost Target returned significant intercepts >0.5g/t Au
cut off in hole VKRC0180 including:
▪
▪
▪
•
2m at 23.6g/t Au from 124m (with visible gold)
1m at 3.2g/ Au from 112m
1m at 1.5g/t from 108m
Underground Mining Study (UMS) completed on the First Hit gold mine, delivering
an Inferred Resource (JORC 2012) of 53.1kt at 7.2g/t Au for 12.4k ounces
constrained within an underground mine design (above a 1.3g/t Au calculated stoping
cut-off grade).
Cautionary Statement: The Underground Mining Study referred to in this report is
based on low-level technical and economic assessments and is insufficient to support
estimation of Ore Reserves or to provide assurance of an economic development case
at this stage, or to provide certainty that the conclusions of the Underground Mining
Study will be realised. For avoidance of doubt, the stated MRE determined by the UMS
is the in situ Mineral Resource and this announcement does not contain any forecast
financial information and does not include a Production Target.
Corporate
•
A ‘Drill-for-Equity’ Agreement entered into with leading drilling contractor, Topdrill,
with regards to drilling at Riverina East.
•
General Meeting of Shareholders held on 5 June, where all resolutions were passed.
•
Strong cash position of $2.72M as of 30 June 2025.
Viking Mines Limited (ASX:VKA) (“Viking” or “the Company”) is pleased to present its
quarterly activities report for the period ended 30 June 2025 (“June quarter”). Key activities
during the reporting period were driven by the strategic review of the Company’s gold assets
and primarily focused on the Riverina East Project (formerly First Hit Project) testing high
priority Zuleika Shear targets in the Eastern Goldfields, Western Australia.
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Commenting on the quarterly activities, Viking Mines Managing Director & CEO Julian
Woodcock said:
“The latest results from Riverina East are highly encouraging, particularly the discovery of a
second significant gold anomaly at Bifrost and the outstanding intercept of 2m at 23.6g/t gold
with visible gold mineralisation.1
“We are pleased to be delivering these early positive exploration outcomes given the significant
scale of this underexplored and highly prospective region.
“Completion of the Underground Mining Study at First Hit has added a defined high-grade
resource within a mineable design, further supporting our strategy to evaluate options for
monetisation, which we will continue in the months ahead.
“In parallel, the Drill-for-Equity agreement with Topdrill ensures we remain well positioned to
advance priority targets efficiently and cost-effectively in the next phases of exploration.”
Figure 1: Map showing the location of Vikings extensive 100% controlled tenure and the position
of the Zuleika Shear and the regional associated gold deposits.2
1
VKA ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
2
See Appendix 2 for data source references
ASX:VKA | vikingmines.com
2
RIVERINA EAST PROJECT
First Hit Mine
The First Hit Gold Mine closed in 2003 after producing ~30koz at a mined grade of 7.8g/t Au.
Historical production records show a positive reconciliation from the calculated mined grade
compared to the mill production records.
Mining was undertaken using sub-level open stoping and focussed on the high-grade
components of the vein system, leaving lower grade material behind. The high-grade nature
of the deposit is reflected in the underground face sampling database as shown in Figure 2.
Figure 2: Long section looking to the west showing face samples on each of the mined levels, the decline access in
the footwall to the mineralisation and selected high-grade face sample results.
Drilling completed by Viking in 20213 demonstrated the deposit remains open at depth with
two drillholes testing below the historical workings returning;
•
VDD015: 7.06m at 5.93g/t Au from 296.94m, incl.
•
•
0.5m at 71.64g/t Au from 302.8m.
VDD013: 5.0m at 3.67g/t Au from 323m, incl.
•
1.0m at 11.16g/t Au from 325m.
Additionally, holes drilled closer to surface and within the area of old workings demonstrated
remaining high-grade mineralisation which is unmined including;
•
VDD012: 1.0m at 47.05g/t Au from 173m.4
3
ASX Announcement 30 August 2021 – Viking DD Results up to 71g/t Au & New Target Identified
4
ASX Announcement 24 June 2021 – Viking Receives First Diamond Results & Sights Visible Gold
ASX:VKA | vikingmines.com
3
Mineral Resource Estimate by MEC Mining5
Viking engaged MEC Mining, a leading global technical consulting firm dedicated to servicing
the mining industry, to undertake a mineral resource assessment of its 100%-owned First Hit
Gold Mine (“the Project”), located 45 km west of Menzies and 2 hours north of Kalgoorlie in
the Eastern Goldfields region of Western Australia.
The mineral resource assessment undertaken by MEC Mining focussed on reviewing the
following aspects of the First Hit Deposit:
1.
2.
3.
4.
Geological model of mineralisation
Pegmatite model which stopes out mineralisation
Extent of historical mine workings
Potential for remaining unmined mineralisation
This assessment was aimed at informing the Company of whether there is potential for
remaining unmined mineralisation that has the potential to be economic in the current high
gold price climate.
In the March Quarter FY25, the Company announced the definition of an Inferred Mineral
Resource of 83.8kt @ 7.0g/t Au for 19,000 ounces for the historical First Hit Mine. The
existing decline at First Hit extends to 220m below surface, providing an opportunity to access
the mineralisation, subject to dewatering.
Figure 3: Long section view looking west showing the un-depleted January 2025 MRE for the First Hit Deposit
5
ASX Announcement 20 January 2025 – Viking Defines High-Grade Gold Mineral Resource at First Hit Mine
ASX:VKA | vikingmines.com
4
Figure 4: Long section looking west showing January 2025 MRE and historical underground workings at the First Hit
Deposit
Figure 5: Long section looking west showing the depleted January 2025 MRE of 83.8Kt at 7.0g/t Au for 19.0Koz Au
ASX:VKA | vikingmines.com
5
Underground Mining Study6
The Company engaged an external engineering consultancy that specialises in underground
mine design and evaluation to assess the First Hit Global Inferred (JORC-2012) MRE of 83.8k
tonnes at 7.0g/t Au for 19.0k ounces.5
A detailed series of steps were undertaken to establish the portion of the Global MRE that
could be extracted under defined assumptions for mining engineering parameters,
geotechnical conditions, dewatering parameters, processing recoveries, operating costs and
gold price. It was assumed that the same mining method of sub-level open stoping would be
employed as was used successfully when First Hit was previously in operation in the early
2000’s.
These assumptions (Table 1) were used as the inputs into Deswik SO software to generate a
set of stope shapes. These stope shapes were then manually assessed and a mine design
completed (Figure 6) to extract the maximum mineral resource with a positive cashflow. These
assumptions will need refining when further information becomes available and as the study
level progresses.
The output from the study delivered an in situ Inferred Mineral Resource (JORC-2012) of
53.1kt at 7.2g/t Au for 12.4koz gold (above a 1.3g/t Au calculated stoping cut-off grade),
representing 65% of the global mineral resource estimate.
Figure 6: Isometric view to the NW showing new mine design developed as part of the Underground Mining Study
with new development and stopes in green an existing development in Orange.
6
ASX Announcement 10 June 2025 – Viking Delivers 12Koz in First Hit Underground Mining Study
ASX:VKA | vikingmines.com
6
Table 1: Input assumptions used in Dewik SO software to determine minable stopes for mine design
Category
Financials
Mining
Parameters
Assumption
Gold Price
Royalty
UoM
A$/oz
%
Value
$4,500
2.50%
Gold Selling Price
A$/oz
$4,383
Discount Rate
%
8%
Underground Mining Cost
A$/t
$89.13
Ore Drive Dilution
Mining Recovery
%
%
5.0%
95.0%
Processing Recovery
%
94.5%
Incremental Stoping Cut-Off Grade
g/t Au
1.3
Minimum Stoping Width
m
2m
Comments
Current gold price with ~14% discount
Western Australia state royalty
Gold sale price after refining costs and state
royalty
Derived from multiple company financial
reports operating in the region
Industry standard for deposit type
Industry standard for deposit type
Derived from historical production data from
First Hit
Calculated
Established viable mining width employed at
Riverina
First Hit Mine Next Steps
Following the establishment of a JORC MRE and subsequent Underground Mining Study for
the First Hit deposit, the Company will continue further assessments to determine potential
strategies to extract value from the mineral resource for the benefit of Viking shareholders.
Key next steps include:
•
Assessing the opportunities at depth with the intention of defining a JORC (2012)
Exploration Target for down dip extensions of the orebody.
•
Determine de-watering and rehabilitation costs to gain access to the underground
workings.
•
Complete Phase 1 regional exploration programme targeting new discoveries over
greenfield targets on existing tenements.
Auger Drilling Results – Bifrost Target7,8
The Company completed an infill auger drilling programme at Bifrost to reduce the sample
spacing from the broad 100m x 400m grid to a 20m x 100m grid. The purpose of this infill
auger sampling was to better define the target anomalies/zones identified in the RC drill
traverses at Bifrost.
Assay results and interpretation were announced in the prior quarter for the first 220 samples
collected as part of a larger 575 sample infill auger programme completed across prospective
targets defined at Bifrost from Phase 1 drilling. Assays and interpretation of the remaining 355
samples were announced on 2 April 2025.
The initial 220 samples assays confirmed a large >400m long >40ppb gold anomaly (Figure 7)
which overlaps with a >400m long >30ppm Arsenic anomaly (Figure 8). Arsenic has been
directly associated with the gold intercepts in bedrock drilling via multielement analysis and is
a positive indicator for potential high-grade mineralisation at Bifrost.
7
ASX Announcement 27 March 2025 – Viking Bifrost Auger Results Define Large 400m Gold Target
8
ASX Announcement 2 April 2025 – VKA Bifrost Auger Results Define Second Surface Gold Target
ASX:VKA | vikingmines.com
7
Assay results from the remaining 355 samples confirmed a second >300m long gold anomaly
>40ppb, within a larger >700m 20ppb gold anomaly. The anomaly occurs 100m SSE of
drillhole VKRC0103, which returned 23m at 0.4g/t Au, including 5m at 1.0g/t Au and 3m at
1.3g/t Au, with individual 1m samples returning up to 2.0g/t Au. The second anomaly has weak
pathfinder elements associated with the gold of silver, mercury and selenium. The combination
of the gold and pathfinder elements were used to design the follow up Phase 2 drill
programme to test the target.
Figure 7: Bifrost target, northern infill auger programme results showing ppb gold contours. Note high >40ppb core
which correlates with results from VKRC0068 and VKRC0083. Blue triangles are planned step out drillholes due to be
completed by early April 2025. Background image is RTP magnetics.
ASX:VKA | vikingmines.com
8
Figure 8: Bifrost target, northern infill auger programme results showing ppm arsenic contours. Note high >100ppm
core with southern edge correlating with results from VKRC0068 and VKRC0083. Blue triangles are planned step out
drillholes due to be completed by early April 2025. Background image is RTP magnetics.
ASX:VKA | vikingmines.com
9
Figure 9: Bifrost target, southern infill auger programme results showing ppb gold contours. Note high >40ppb core
which correlates 100m to the SSE from VKRC0102. Blue triangles are drillholes completed to test the target.
Background image is RTP TDR magnetics.
ASX:VKA | vikingmines.com
10
In addition to an infill auger drilling programme, the Company is also planning a highresolution magnetic geophysics survey to better resolve the structures which form the focus of
our targeting.
Phase 2 Drill Programme8,9
Viking completed the Phase 2 drill programme, with 50 holes for 5,956m drilled (including one
re-entry of VKRC0102). This brings the total activity for the Riverina East Project to ~13,500m
RC drilling in this poorly explored, highly prospective area.
The Phase 2 programme initially commenced on the Central Duplex Target, which is defined
by complex structures observed in the magnetic geophysics and combined with a large >6km
>10ppb near surface gold in auger anomaly.
A substantial arsenic anomaly also flanks the gold anomaly. Based on knowledge gained from
the Phase 1 drill programme at Bifrost and the identified association of arsenic with the
mineralisation, the Company interprets this as an additional indicator to the potential of this
target.
The second part of the Phase 2 drill programme targeted follow up drilling around the results
from the phase 1 drill programme and infill auger drilling results at the Bifrost Target.
Bifrost South Target drilling results
The recently completed Phase 2 drill programme9 included two new drillholes (VKRC0179 and
VKRC0180) and one extension (VKRC0102) to follow up on previously reported results from
hole VKRC010310 (23m at 0.4g/t Au from 97m incl. 5m at 1.0g/t from 102m and 3m at 1.3g/t
from 115m) (Figure 13, Figure 14 & Figure 15).
Both new holes intercepted anomalous and elevated gold mineralisation over broad zones
and are associated with quartz veining, biotite alteration, sulphides and are hosted in a dolerite
rock unit (Figure 11). VKRC0180 returned the most significant intercept of 2m at 23.6g/t Au
from 124m with visible gold (Figure 10).
There is further encouragement within VKRC0180 with additional intercepts of 1m at 1.5g/t Au
from 108m and 3.2g/t Au from 112m. Of particular interest is the 2m thick quartz vein
intersected from 111m (Figure 10).
The vein confirms the capacity of the system to generate thicker gold hosting quartz veins in
the area being explored by the Company. In addition, having multiple vein positions downhole
presents additional opportunity for several zones of mineralisation to be intersected across the
target area.
9
ASX Announcement 12 March 2025 – Viking Commences ~6,000M RC Drilling Programme at First Hit
VKA ASX Announcement 25 February 2025 – Viking Hits Gold in 2nd Regional Drill Traverse, 1.7km South
10
ASX:VKA | vikingmines.com
11
Figure 10; Photograph of RC chips from 125m downhole in VKRC0180 which assayed 45.5g/t Au. Image shows
quartz vein with visible gold, sulphides and biotite.
Figure 11; Photo of chip samples from VKRC0180 from 80m to 160m with grades in g/t Au and host rock annotated.
Not strong low-grade anomaly throughout the intercept and includes 45.5g/t au from 125m .
ASX:VKA | vikingmines.com
12
Gold Haloes5
All intercepts reported within VKRC0180 occur within three broader anomalous gold haloes
>50ppb (Figure 15) of:
• 21m at 0.4g/t Au from 96m
• 6m at 8.0g/t Au from 123m
• 8m at 0.2g/t Au from 135m
The significance of these broader gold zones is twofold. Firstly, the broad gold anomaly is
interpreted to represent a significant volume of mineralising fluid flow through the host rocks
highlighting the potential of the system discovered. Secondly, the larger zones support the
geochemical data collected via auger sampling and the exploration model being followed.
Mineralisation Style
These intercepts are significant due to the style of mineralisation being explored for being
narrow vein high grade gold which is characteristic of deposits found along the Zuleika shear,
including Ora Banda Mining’s (ASX:OBM) high grade Riverina Deposit 10.6km to the SW
(Figure 12). The thickness of the veins intersected at Riverina is comparable to that intercepted
in hole VKRC0180 and demonstrating the significant potential that exists at Bifrost.
Figure 12; Section through drillhole VKRC0180 drawn at the same scale as underground face photograph taken from
the Ora Banda Mining corporate presentation from 7th March 2025. Image illustrates thee type and style of
mineralisation being explored for by Viking.
ASX:VKA | vikingmines.com
13
Host Rocks11
All mineralisation is within a dolerite rock unit (Figure 14 & Figure 15). This has significance as
it is a different mafic unit compared to the more extensive and ductile ultramafic rocks
encountered in much of the regional drilling. Dolerites are more brittle which provides a
rheological contrast to the surrounding ultramafics. This results in a preferential host rock for
mineralisation. This is demonstrated within regional significant gold deposits hosted within
dolerites, such as many deposits associated with the Defiance Dolerite at the multi-Moz St Ives
gold camp (Gold Fields).
Additional Target11
In addition to the holes reported above, drillhole VKRC0178 was drilled testing updip of Phase
1 drillhole VKRC0117 which returned 1m at 2.3g/t Au from 98m. Again, the target meets the
Company’s criteria for follow up due to being narrow vein and in the 1-5 gram metre range.
Hole VKRC0178 was successful in confirming a sub-vertical trend and returned 1m at 3.3g/t
Au from 51m, approximately 35m updip (above) the VKRC0178 intercept (Figure 14).
Mineralisation is characterised by quartz veining and intense biotite sharing and alteration. This
result confirms a second target structure at the Bifrost target warranting further follow up. The
Company continues to interpret the geology at this location and will plan follow up activity for
the next round of drilling.
Figure 13; Map showing the Bifrost South Target area with large gold anomaly defined by auger drilling and phase 2
RC drilling results. Note eight drillholes with assays still pending.
11
VKA ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
ASX:VKA | vikingmines.com
14
Figure 14; Cross section through Bifrost South target area on traverse 2 showing new drillhole results and previously
reported drillhole results. Note two target areas in the western and central positions on the traverse.
Figure 15; Cross section focussing on holes VKRC0103 and VKRC0180 showing location of high-grade intercepts
including 2m at 23.6g/t Au.
ASX:VKA | vikingmines.com
15
Central Duplex Target11
As part of the Phase 2 drill programme, 31 holes for 3,624 metres were drilled at the Central
Duplex Target across four wide spaced traverses as a first pass programme (Figure 16)
designed to test the bedrock geology and identify potential gold hosting structures for follow
up drilling.
Results defined multiple gold anomalous zones >50ppb of various intensity across 3 of the 4
traverses. Work is ongoing with the interpretation and assessment of pathfinder geochemistry
is yet to be completed. Observations include zones of high arsenic as well as other pathfinder
signatures including bismuth, tellurium and antimony, all typical of orogenic gold mineralised
systems.
The objective of the wide spaced drilling at the CDT is to identify structural pathways which
display characteristics of gold mineralisation. Although no significant intercepts have been
encountered (highest returned in hole VKRC0155 with 1m at 1.5g/t Au from 38m), the
presence of multiple ppb pathways and supporting pathfinder geochemistry as well as some
very significant and broad alteration zones indicates potential for this target area to host gold
mineralisation (Figure 16).
The Company will continue to assess the results and plan follow up activity which may include
further infill auger drilling and potential for follow up RC drill testing.
Figure 16: Cross section through the Central Duplex Target Traverse 2. Section highlights broad zone of gold
anomalism, with holes annotated and zones of higher >100ppb results (pink). Note 1m at 1.5g/t Au in holes
VKRC0155.
ASX:VKA | vikingmines.com
16
Figure 17: Map showing the Bifrost Target Area with all auger soil sampling results and phase 2 drilling locations.
Background image is RTP TDR magnetics.
ASX:VKA | vikingmines.com
17
CANEGRASS BATTERY MINERALS PROJECT
No fieldwork was carried out on the Project in the reporting period.
NARNDEE PROJECT
No fieldwork was carried out on the Project in the reporting period.
CORPORATE
Drill for Equity Agreement
Viking announced on 9 April 2025 that had it entered into a ‘Drill-for-Equity’ Agreement
(“Agreement”) with Topdrill Pty Ltd (“Topdrill”) whereby invoiced drilling costs (excluding fuel
and GST) may be satisfied via the issuance of Ordinary Viking shares.
Under the Agreement, Viking has the option to issue Topdrill (or its nominee) up to 25 million
Ordinary shares for up to 40% of invoiced drilling costs (excluding fuel and GST) at the Riverina
East Project, up to a maximum of $1,000,000. The offset value will be calculated as a 10%
discount to the 20-day volume weighted average price (“VWAP”) multiplied by the number of
shares issued to Topdrill. The Agreement will expire on 31 October 2025.
The ‘Drill-for-Equity’ shares will be issued using the Company’s existing capacity under the
Company’s shareholder approved Employee Securities Incentive Plan, subject to a 6-month
holding lock from the date of issue. Issuance of the maximum 25 million Ordinary shares to
Topdrill will result in it holding approximately 1.88% of the Company’s shares on issue.
The Agreement with Topdrill enables Viking to preserve its balance sheet and allow for a larger
drill programme to be undertaken over the course of 2025. 15,801,429 Shares have been
issued to Topdrill under the Agreement subject to a 6-month holding lock.
Corporate General
The Company held a General Meeting of Shareholders on 5 June 2025, where all resolutions
were carried, including the election of Dr Julian Stephens as a Non-Executive Director.
The Company has a strong cash and receivables position of $2.72M as of 30 June 2025
($2.63M cash and $0.09M pending June quarter FY25 GST rebate).
Income for the period totalled $0.32M, resulting from $154k R&D Refund tax incentive, $154k
GST returns and $38k from investing activities (bank interest).
The Company’s cash position realised a net decrease of $0.74M over the March 2025 quarter
Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $150k in the quarter ending 30 June 2025. This amount comprised
Director fees for the relevant period.
ASX:VKA | vikingmines.com
18
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure for the quarter predominantly related to:
• $710k: Exploration expenditure on the Company’s Projects, primarily relating to
costs associated with the commencement of the Fist Hit drilling programme,
consulting fees associated with the First Hit MRE and metallurgical testwork at
Canegrass.
• $164k: General corporate and administration costs, including half year audit fees,
ASX listing fees and annual software costs.
• $176k: Director fees and staff costs.
• $315k gain was made due to bank interest, March quarter GST rebate and R&D
tax incentives.
Other than as set out in this report, the Company undertook no other substantive exploration,
mining production and development activities during the quarter.
SEPTEMBER QUARTER PLANNED ACTIVITIES
The Company continues to primarily focus on progressing exploration activities across Riverina
East Project while also appropriately advancing the Canegrass and Narndee Projects.
• Commence Phase 3 drilling at the Riverina East Project which will include drilling
at the Bifrost Target to follow up high-grade results and initial drilling at the
Southern Structural Target
• Complete Magnetic geophysics survey at Bifrost
• Complete ongoing data review and interpretation of new results expected from
Phase 3 drilling and plan follow up exploration activities across the Riverina East
Project
• Continue evaluating monetisation options for First Hit UG Mining Assessment
CORPORATE OPPORTUNITIES
The Company continues to review and conduct due diligence on a vast array of mineral
acquisition opportunities, to complement the Company’s existing project portfolio, with the
objective of acquiring mature exploration assets with the potential to deliver long-term
shareholder returns. Should any of these acquisition opportunities progress the Company will
provide an update to the market.
-ENDThis announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
ASX:VKA | vikingmines.com
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
contact@vikingmines.com
19
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning
Viking Mines Limited’s planned exploration program and other statements that are not historical facts. When used in this document, the
words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Viking Mines Limited believes that its expectations reflected in these forward-looking statements are reasonable, such
statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a Member
and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd.
Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the disclosure of the information in this report in the
form and context in which it appears.
Competent Persons Statement – Mineral Resource Estimate
The information in this announcement that relates to the Mineral Resource estimate is derived from information compiled by Mr Dean
O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and Competent Person for this style of
mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC, an independent mining and exploration
consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of
Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). The Competent Person is not aware of any new information or
omission of data that may materially affect the stated Mineral Resource estimate.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the information and
supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS Engineering who are a Contractor
to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Connelly has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources
and Ore Reserves. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
Competent Persons Statement – Underground Mining Study
The information in this announcement that relates to the Underground Mining Study is derived from information compiled by Mr Ben Wilson,
a Member of the Australasian Institute of Mining and Metallurgy (AusIMM, #222682), and Competent Person for the application of mine
design parameters to the Global MRE. Mr Wilson has sufficient experience relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian
Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). The Company confirms that the form and
context in which the Competent Person’s findings are presented have not been materially modified from the original market announcement.
ASX:VKA | vikingmines.com
20
APPENDIX 1 – TENEMENTS HELD OR WITH AN AGREEMENT TO ACQUIRE
AN EQUITY INTEREST AS AT 30 JUNE 2025
Project
Licence
name
Location
License type
Licence Holder/ JV
Partners i
Share your feedback
Discover