VKA ENGAGES MINERAL TECHNOLOGIES FOR LINKA TUNGSTEN
Released
Released
Announcement PDF
contact@vikingmines.com
1
ASX ANNOUNCEMENT
17 March 2026
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
ASX:VKA
vikingmines.com
LINKA TUNGSTEN PROJECT DEVELOPMENT ACCELERATED
VIA GLOBAL PROCESSING PARTNERSHIP
• Tier-1 specialist Mineral Technologies (MT) engaged for global tungsten processing
and engineering expertise.
• Linka processing concept study initiated, leveraging MT’s extensive project
experience across Australia and Europe.
• Evaluation of modular "FlexSeries" technology to reduce lead times and simplify on-
site construction.
• Viking to leverage world-leading gravity separation expertise, critical for recovering
high-density tungsten mineral scheelite.
• Strategic relationship provides a technical "fast-track" toward commercial production
and potential for early cash-flow.
• Rising global tungsten prices continue to exceed all-time highs with APT at
US$2,200/mtu1
Viking Mines Ltd (ASX: VKA) (“Viking” or “the Company”) is pleased to announce the formal
engagement of global mineral processing specialist Mineral Technologies (a subsidiary of the
Downer Group) to undertake a processing concept study encompassing critical process design
and metallurgical optimisation for the Linka Tungsten Project in Nevada, USA.
Viking Mines MD & CEO Julian Woodcock said:
"The early engagement of MT is key to our strategy of rapidly advancing the Linka Tungsten
Project. With testwork demonstrating mineralisation is amenable to simple gravity separation, MT
are a logical partner as we progress engineering studies.
"I look forward to working with MT to define a low-capital cost processing solution for Linka. With
APT tungsten prices reaching US$2,200/mtu, the inherent value in our Nevada portfolio
continues to grow and the rapid advancement of these Projects is a high priority."
RAPID DEVELOPMENT PATHWAY FOR LINKA
To accelerate the development pathway for the Linka Project, the Company has secured the
services of Mineral Technologies (“MT”), an international leader in gravity separation and
mineral processing solutions with over 80 years of experience.
The scope of work includes a processing concept study which encompasses metallurgical
characterisation, flowsheet design, and the evaluation of modular processing solutions. By
leveraging specialist expertise in tungsten recovery, the Company intends to maximise WO3
recovery rates while minimising the capital and operational intensity typically associated with
traditional fixed plant construction.
1
Source: 16 March 2026 - Shanghai Metals Markets https://www.metal.com/tungsten - CIF Rotterdam 88.5% APT US$/mtu (metric tonne unit – 10kg)
ASX:VKA | vikingmines.com 2
GLOBAL TUNGSTEN EXPERTISE
MT has been a key technical provider to some of the world’s most significant tungsten projects.
Their track record includes providing core process equipment and technology, testwork,
flowsheet development and engineering design for projects in Australia and Europe.
Whether as co-product from processing other minerals or from a standalone operation, MT’s
team of experienced metallurgists and design engineers work with customers around the world
to characterise tungsten ore samples then test and quantify performance parameters. As a
mineral that is generally freely liberated, risk is reduced through development of efficient
flowsheets and designs that look to minimise over grinding and over handling to maximise
recoveries.
RAPID-START MODULAR STRATEGY
A core component of this engagement is the design of a cost-effective, modular plant utilising
Mineral Technologies’ proprietary FlexSeries technology. This "Rapid-Start" model is
engineered to bypass the multi-year lead times of static infrastructure through pre-assembled,
"plug-and-play" modules.
Key advantages of the modular approach include:
• Assembly Speed: Modules are pre-assembled offsite which allows for faster on-site
assembly, this greatly derisks projects where, missing parts, labour availability and
inclement weather can cause long and costly delays to projects.
• Operational Agility: The compact, relocatable design allows for easy expansion or
redeployment to different ore bodies as the project grows.
• Proven Delivery: MT has installed FlexSeries plants at sites in the Australia and the USA,
and is currently executing delivery of three plants in South Africa.
STRATEGIC OUTLOOK
The engagement of MT represents a major step in Viking’s strategy to transition future
exploration success to commercial production. By combining the high-grade potential of the
Nevada portfolio with world-class modular processing design, the Company is positioned to
compress the development timeline and deliver a cost-effective, scalable production model.
ONGOING WORK & NEXT STEPS
With the engagement of MT, the Company continues to focus on the following priority
workstreams:
• Metallurgical Testing: Ongoing testwork of Linka mineralisation to define optimal gravity
separation parameters and increased recovery via flotation of the gravity tails.
• Flowsheet Design: Establish the processing flowsheet and delivery of a technical
"blueprint" for a modular processing solution.
• Procurement Planning: Evaluation of FlexSeries module specifications and construction
timelines for rapid site deployment.
• Cost Estimates: Concept level studies to deliver CAPEX and operating estimates for
potential future development.
END
ASX:VKA | vikingmines.com 3
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When used in
this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions
are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these forward-looking
statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that actual results will be
consistent with these forward-looking statement.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a
Member of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of
Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the
disclosure of the information in this report in the form and context in which it appears. The Company confirms that it is not aware of
any new information or data that materially affects the information included in the original announcements and that all material
assumptions and technical parameters underpinning the Exploration Results in the original announcements continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcements.
Share your feedback
Discover