VIKING EXPANDS FIRST HIT GOLD PROJECT DRILLING PROGRAMME
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
18 November 2024
VIKING BOOSTS FUNDING AND EXPANDS FIRST HIT
GOLD DRILLING PROGRAMME TO 20,000 METRES
•
Funding boosted via a strongly subscribed placement to sophisticated and professional
investors, raising ~A$2.39 million.
•
First Hit Gold Project drilling programme subsequently increased 4x to ~20,000m to
test high-priority targets along 25km of underexplored Zuleika Shear greenstone belt.
•
Exploration campaign now fully funded with ~A$5 million in cash reserves.
•
Enhanced focus on exploring untapped potential in unexplored greenstone adjoining
the >1.3Moz Riverina-Mulline Gold Camp, targeting high-grade gold.
•
Multiple operating mills located close to the Project, with Ora Banda Mining’s
(ASX:OBM) operating underground Riverina mine 8km east and the Davyhurst
operations 40km south of Viking’s First Hit Gold Mine, respectively.
Viking Mines Limited (ASX: VKA) ("Viking" or the “Company") is pleased to announce it has
received binding commitments from sophisticated and professional investors to raise ~A$2.39
million (before costs) under a placement of fully paid ordinary shares (“Placement”).
Proceeds from the Placement will boost Viking’s financial position to ~A$5 million in cash reserves
to fund exploration activities. Viking is subsequently expanding the current drilling program to up
to ~20,000 metres of Reverse Circulation (“RC”) drilling at the First Hit Gold Project (which
includes the historical First Hit Gold Mine) in the Eastern Goldfields, Western Australia.
The initial ~5,000m phase of the drilling programme will be completed prior to the end of the
December quarter, testing open targets proximal to the First Hit Mine and first pass drilling at
high-priority zones along a 25-kilometre stretch of the Zuleika Shear, a well-recognised
structural belt, known for its significant high-grade gold endowment.
Viking Mines Managing Director & CEO Julian Woodcock said:
“We are extremely pleased with the strong support for the Placement, enabling Viking to
significantly expand exploration activities at the First Hit Gold Project.
Amidst a robust global gold market, Viking is in a strong position to advance this expanded
exploration strategy and unlock the potential of our high-grade gold assets along the Zuleika
shear.
We have a substantial land package in the right geological setting with multiple priority targets
that warrant testing. The region is host to multiple major high-grade gold deposits and our tenure
encompasses and adjoins the greenstone belt which hosts the >1.3Moz Riverina Camp and is
directly along strike from the >1.2Moz Central Davyhurst Camp, both held by Ora Banda Mining.
With multiple gold exploration work streams now underway, we look forward to providing updates
on both the First Hit Gold Mine mineral resource potential assessment and the initial drilling
programme across high priority regional targets in the near future.”
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Drilling Overview and Strategic Goals:
As part of the Company’s strategy to unlock the potential of its high-grade gold assets in a prolific
and well-endowed gold district, an initial drilling programme consisting of ~5,000m of RC drilling
will be completed prior to the end of the December quarter. The Company intends to
recommence drilling in Q1 2025 after receiving the initial drill programme results and to follow
up on additional targets.
The enhanced 20,000 metre programme aims to:
1. Test Priority Zones: Focus on initial drill testing of potential high-grade gold targets
identified through geochemistry and geophysical interpretation.
2. Expand Exploration Footprint: Cover extensive and previously underexplored targets
along the well-endowed, high-grade Zuleika Shear greenstone belt.
3. Deliver Value: By targeting zones with minimal modern exploration to enable new
discoveries of high-grade gold resources.
Viking has significantly increased its land holding in the Eastern Goldfields with granted tenure in
the district now standing at ~283km2, with additional tenement applications in process bringing
the total land package to ~480km2 (Figure 1)1. At the core of the tenement holding is a 25km
strike length fully encompassing the Zuleika Shear, which has seen very little modern
exploration. Historical government drill database reveals no bedrock drill testing has been
completed over the Company’s targets within the structurally complex areas of this highly fertile
and well-endowed gold province.
Figure 1; Map showing the location of Vikings extensive 100% controlled tenure and the position of the
Zuleika Shear and the regional associated gold deposits.1
1
See Appendix 1 for data source references.
ASX:VKA | vikingmines.com
2
ZULEIKA SHEAR – A MAJOR GOLD HOSTING STRUCTURE
The Zuleika Shear is host to multiple major high-grade gold deposits (including several
>million-ounce gold camps) occurring over a >250km strike length (Figure 1) and home to many
major mining Companies, including;
• St Ives Camp (Gold Fields Ltd)
• Kundana Camp (Evolution Mining Ltd) >4Moz
• Bullant Deposit (Norton Gold Fields) >0.8Moz
• Central Davyhurst Camp (Ora Banda Mining) >1.2Moz
• Riverina-Mulline Camp (Ora Banda Mining) >1.3Moz
• Bottle Creek (Alt Aurene)
• Mt Ida (Delta Lithium) >1Moz
The First Hit Gold Project encompasses a substantial 25km strike length of the Zuleika Shear and
lies in the northern part of this prolific gold district, immediately adjacent to the active RiverinaMulline Gold Camp owned by Ora Banda Mining (ASX:OBM) and 60km south of Delta Lithium’s
Mt Ida Project (ASX:DLI).
This extensive zone of the Zuleika Shear has seen little exploration or bedrock drill testing due to
fragmented ownership over the past 25+ years and prior focus of activity on the outcropping
deposits at the Riverina-Mulline Gold Camp. The Company will provide an updated
announcement with the details of the targets being tested in the near future.
PLACEMENT DETAILS:
The Placement comprises the issue of approximately 265 million new fully paid ordinary shares in
the Company to sophisticated and professional investors at an issue price of $0.009 per share
(“Placement Shares”), to raise approximately A$2.39 million (before costs). The Placement
Shares will be issued utilising the Company’s ASX Listing Rule 7.1 and 7.1A capacity.
The Offer Price of $0.009 per share represents a 18.2% discount to the last close of $0.011 per
share and a 22.8% discount to the 5-day VWAP of $0.0117 per share.
The Company engaged Euroz Hartleys Limited as Lead Manager to the Placement.
An Appendix 3B for the proposed issue of the Placement Shares will be lodged with ASX
following this announcement.
ASX:VKA | vikingmines.com
3
Indicative Timetable
Key dates relating to the Placement are provided in the timetable below. The timetable remains
subject to change at the Company’s discretion and is also subject to compliance with applicable
laws and the ASX Listing Rules:
Event
Date
Announcement of the Outcome of the Placement. Lodge Appendix 3B
with ASX.
Monday 18 November 2024
Trading Halt Lifted – Trading resumes on the ASX
Monday 18 November 2024
Settlement of New Shares issued under the Placement
Monday, 25 November 2024
Allotment and Normal Trading of New Shares issued under the
Placement
Tuesday, 26 November 2024
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to,
statements concerning Viking Mines Limited’s planned exploration program and other statements that are not historical facts.
When used in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should,"
and similar expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected
in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be
given that actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is
a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time
employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
ASX:VKA | vikingmines.com
4
FIRST HIT PROJECT, WESTERN AUSTRALIA
The First Hit Project is centred around the historic high-grade First Hit gold mine situated along
the prospective Ida and Zuleika Shear zones in the Eastern Goldfields of Western Australia. The
Project incorporates 479.9km2 of tenements with 7 active Mining and Prospecting licences, 5
Exploration licences, and 3 Exploration licences under application. At the core of this landholding
is a 6.4km2 group of contiguous tenements which host the historic First Hit gold mine.
Prior to closure of the First Hit gold mine by Barra Resources in 2002 and at a time of depressed
gold prices of US$320/oz, the First Hit mine produced ~30koz ounces of gold at an average grade
of ~7.7g/t Au. No modern exploration activity has been conducted in the past 18 years and
creates a significant opportunity for Viking. The Company is focused on delivering exploration
programs to test near mine extensions and regional targets around the First Hit Project with the
objective of defining fertile structures and discovering gold ounces.
The Project area is well serviced by infrastructure and is located 50km west of the sealed
Goldfields highway and the township of Menzies. The nearest operating Gold Processing Plant is
the Davyhurst Mill 40km to the south, owned and operated by Ora Banda Mining (ASX:OBM). The
nearest operating gold mine is the Riverina open pit, located 8km south of the First Hit gold mine,
owned by OBM.
ASX:VKA | vikingmines.com
5
APPENDIX 1
Data sources for mineral resource estimates and mine production referenced on map in figure 1.
Riverina-Mulline Camp
Historical production: 305koz Au5
Measured, Indicated & Inferred Mineral Resource: 854koz Au6
OBM Production (FY21-23): 170koz Au7,8,9
TOTAL: 1333koz
Central Davyhurst Camp
Historical production: 811koz Au1
2024 Indicated & Inferred Mineral Resource: 396koz Au2
TOTAL: 1,207koz Au
Bullant
Historic Production: 354koz Au3
Measured, Indicated & Inferred Mineral Resource: 462koz Au4
TOTAL: 816koz
Kundana Camp
Historic Production to June 2020: 2.75Moz Au10
FY21 to FY24 Production: 291,853oz Au11,12,13,14
Current Ore Reserves: 464koz Au15
Frogs Leg Mineral Resources: 770koz Au16
TOTAL 4.28Moz
Map Source References
1 https://orabandamining.com.au/projects/davyhurst/
2 https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
3 https://www.miningnews.net/precious-metals/news/1233885/bullant-gold-packs-bite
4 https://nortongoldfields.com.au/bullant/
5 https://orabandamining.com.au/projects/davyhurst/
6 https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
7 https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2021/?wpdmdl=7200&refresh=6736e1d72a3a51731650007
8 https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2022/?wpdmdl=8803&refresh=6736e1d71beab1731650007
9 https://orabandamining.com.au/download/annual-report2023/?wpdmdl=11152&refresh=6736e1d703e691731650007
10 https://randmining.com.au/projects/east-kundana-joint-venture/
11 https://app.sharelinktechnologies.com/announcement/asx/44dffa9bc8eaaa574af7cfda9564c595
12 https://app.sharelinktechnologies.com/announcement/asx/690381347ddb79dc8261b0f775636da7
13 https://app.sharelinktechnologies.com/announcement/asx/b13d0741e08843fb98f0e8c8be20eaaa
14 https://app.sharelinktechnologies.com/announcement/asx/00592059cc0f5c205e3eb6cfa25f3e4d
15 https://evolutionmining.com.au/storage/2024/02/2680687-Annual-Mineral-Resources-and-OreReserves-Statement.pdf
16 https://evolutionmining.com.au/storage/2015/08/01647903.pdf
ASX:VKA | vikingmines.com
6
Share your feedback
Discover