VIKING INTERCEPTS VISIBLE SCHEELITE 500M SW OF LINKA MAIN
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
18 November 2026
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
VISIBLE SCHEELITE INTERSECTED AT SW EXTENSION, 500M
FROM LINKA MAIN
• Visible scheelite intersected in widely spaced exploratory drilling from the SW
Extension target at the Linka Tungsten Project in Nevada, USA, ~500m along strike
south-west of Linka Main:
• LKRC0044: 3.0m interval of visible scheelite from 56.4m downhole, hosted in tactite
(skarn) at the limestone–monzonite contact.
• Estimated visual abundance ranges from 0.1% to 0.3% scheelite (not a WO₃ assay
grade), using fluorescence under shortwave ultraviolet light at 254nm (Figure 1).
• 6 of the 10 holes drilled at the SW Extension intersected the target limestone/monzonite
contact, the geological setting that hosts tungsten mineralisation at Linka Main.
• The SW Extension is now reaffirmed as a priority target for follow-up drilling.
• The target sits within ~7km of interpreted intrusive/limestone contact that remains
largely untested, and forms part of the Growth Potential workstream of Viking’s fast-to-
market strategyi
.
• Samples from LKRC0044 are at the laboratory, with assays expected throughout
December 2026.ii
• Visual intercepts from the remaining Linka Main holes will be reported separately on
completion of geological logging and data compilation.
Cautionary note: Visual estimates of mineral presence should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Viking Mines Limited (ASX: VKA, OTCID: VKALF) ("Viking" or "the Company") is pleased to
report that reverse circulation ("RC") drilling at the South-West Extension ("SW Extension") target
at the Linka Tungsten Project in Nevada, USA, has intersected visible scheelite (Figure 1) hosted
in skarn in drillhole LKRC0044, ~500m south-west of Linka Main (Figure 2). It is the first visible
scheelite the Company has reported from drilling at the SW Extension and confirms the area as a
priority exploration target outside of Linka Main.
Viking Mines Managing Director & CEO Julian Woodcock said:
“Until now, every scheelite intercept has come from Linka Main. LKRC0044 is ~500m to the south-
west, under the Bates Mountain cover sequence, and it has intersected skarn with visible scheelite
at the same limestone–monzonite contact that hosts mineralisation at Linka Main.
“This result has very significant positive implications for the prospectivity of the region. We have
always known Linka Main was mineralised, as it is a historical mine, but the SW Extension
demonstrates the potential scale for the broader Project.
“It is one hole and we are yet to receive the assays, but we have now intersected the right geology
in 6 of the 10 holes drilled at the SW Extension. This reaffirms it as a priority target for follow-up
drilling and supports our work to define sources of mineralisation outside of the historical mining
areas.”
2
ASX:VKA | vikingmines.com
Cautionary note: Visual estimates of mineral abundance should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially
provide no information regarding impurities or deleterious physical properties relevant to valuations.
SOUTH-WEST EXTENSION DRILLING
The SW Extension target is located in the area immediately south-west of Linka Main and
encompasses an interpretated ~800m strike length of the now confirmed contact between
limestone and intrusive monzonite (Figure 2). The entirety of the target area is covered by the
younger Bates Mountain Tuff which means the older target host rocks cannot be mapped or
sampled at surface. This creates an encouraging ‘blind’ target as tungsten mineralisation at Linka
Main occurs as scheelite-bearing skarn developed along this contact. The historic mining and
activity from the 1950s and 1970s did not explore through this area and as such the potential to
discover new mineralised zones remains high.
10 RC holes for ~713m were drilled at the SW Extension (Figure 2) as part of the 48-hole,
~3,491m maiden programmeii
. The Company previously reported that early holes at the SW
Extension had reached the limestone–monzonite contact, with no scheelite observed at that timeiii
.
Figure 1; LKRC0044 chip trays under shortwave UV light (254nm) (bottom) and natural light (top). The top image shows
the geology throughout the hole and the bottom image highlights the visible scheelite at the limestone/monzonite contact.
3
ASX:VKA | vikingmines.com
Figure 2; Map showing location of drillholes at the SW Extension target. Note visible scheelite in hole LKRC0044 which is
~500m SW of Linka Main. Annotated hole LKRC0004 assay results reported on 24 September 2026; Tungsten assays
confirm thick intercepts at Linka.
4
ASX:VKA | vikingmines.com
LKRC0044
Drilling intersected a variable sequence of younger cover, intrusive monzonite, limestone and
skarn. Key features of the drillhole include:
• 3.0m interval with visible scheelite (estimated at 0.1-0.3% visual abundance) from
56.4m downhole, hosted in tactite (skarn).
• The logged sequence comprises tuff from surface to 27.4m, intrusive monzonite from
27.4m to 48.8m, limestone from 48.8m to 56.4m, skarn from 56.4m to 59.4m, and
monzonite from 59.4m to the end of the hole at 76.2m.
• The variable geology presents opportunities for formation of skarn mineralisation on all
contacts between the intrusive monzonite and limestone.
Cautionary note: Visual estimates of mineral presence should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal
economic interest. Visual estimates also potentially provide no information regarding impurities or
deleterious physical properties relevant to valuations.
Geology across the SW Extension
6 of the 10 SW Extension holes intersected limestone in contact with monzonite with skarn
developing in LKRC0044 and hosting visible scheelite. All holes drilled at the SW Extension are
summarised in Table 1.
Table 1; Summary of all holes drilled at the SW Extension.
Hole ID
End of
Hole (m)
Limestone–
monzonite
contact
Comment
LKRC0044 76.2 Yes
Full sequence of tuff into limestone into monzonite, multiple intrusive contacts
intercepted but with 3.0m of skarn developed on the contact with the primary
intrusive body.
LKRC0001 36.0 No
Abandoned hole due to ground conditions. Did not penetrate through the volcanic
tuff.
LKRC0018
48.8
No
No limestone encountered. Volcanic tuff immediately unconformably overlies
monzonite. Contact interpreted to lie further to the SE.
LKRC0019 39.6 Yes Full sequence of volcanic tuff into limestone into monzonite.
LKRC0020 33.5 Yes Full sequence of volcanic tuff into limestone into monzonite.
LKRC0031 118.9 Yes Full sequence of volcanic tuff into limestone into monzonite.
LKRC0032 47.2 No No limestone encountered. Volcanic tuff overlies monzonite.
LKRC0033
153.9
No
Multiple monzonite dykes, hole ended in limestone and not drilled deep enough to
test principal pluton contact.
LKRC0034
121.9
Yes
Full sequence of volcanic tuff into limestone into monzonite. Thin intrusive dykes
intercepted prior to primary monzonite contact.
LKMB0003 36.6 Yes Full sequence of volcanic tuff into limestone into monzonite.
Priority target for follow-up drilling
The Company considers the SW Extension a priority target for follow-up drilling on the following
basis:
• The principal limestone-monzanite contact, the host setting at Linka Main, has been
intersected in 6 of 10 holes.
• Skarn with visible scheelite has been intersected in LKRC0044, ~500m from Linka Main.
• The area lies beneath younger unmineralised cover and has no known historical drilling.
5
ASX:VKA | vikingmines.com
The SW Extension forms part of the Growth Potential workstream of the Company’s fast-to-market
strategy, which is assessing potential mineralised zones beyond the Linka Main piti
. The SW
Extension and regional targets sit within ~7km of interpreted intrusive/limestone contact that
remains largely untestedi
.
Assays
All samples from the maiden programme, including LKRC0044 and the other SW Extension holes,
have been delivered to the laboratoryii
. Assay results for the remainder of the programme,
including the SW Extension holes, are expected throughout December 2026.
Linka Main
Assays have been received for fourteen holes at Linka Main to dateii
. Logging of the remaining
Linka Main holes is being finalised and visual intercepts from those holes will be reported
separately once completed.
MAIDEN DRILLING PROGRAMME
The maiden programme was completed with 48 holes drilled, compared with the 63 holes
approved by the Bureau of Land Management ("BLM"). Viking sought approval for 63 holes to
cover multiple eventualities at both the SW Extension and Regional target areas and to give the
Company flexibility and options during drilling. As with all exploration programmes, the number
of holes drilled can differ from the number planned as information is gained during drilling and
as ground conditions and technical limitations of equipment are evaluated as drilling progresses.
As the programme advanced, the Company revised the number of holes to be drilled based on
the information obtained. Fewer holes were drilled at the SW Extension once the contact position
was determined and several of the approved deeper holes at Linka Main were postponed due to
the occurrence of groundwater and compressor limitations on the drill rig.
Following this programme, the Company intends to apply to the BLM for further drilling approvals
at new drill site locations at the SW Extension to advance drilling at Linka.
NEXT STEPS
The Company’s near-term workstreams for the Linka Tungsten Project include:
• Reporting of visual intercepts from the remaining Linka Main holes.
• Reporting of assay results, including LKRC0044, expected through December 2026.
• Re-analysis of mineralised intervals using an ore grade method with an XRF finish once all
assays are received.
• Updating the 3D geological model, including the SW Extension, and planning follow-up
drilling.
• Ongoing metallurgical testwork on samples from Conquest, Hillside and the Linka stockpile,
including the second round of ore sorting testwork with TOMRA.
• Identification of toll treatment options for the approved 900t bulk sample.
6
ASX:VKA | vikingmines.com
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Learn more about Viking Mines via our investor hub here.
i
ASX announcement 3 November 2026: Fast-to-market strategy update: advancing a potential USA tungsten restart at Linka.
ii
ASX announcement 12 November 2026: Viking’s assays continue to confirm high-grade tungsten mineralisation at Linka.
iii
ASX announcements 17 September 2026: Drilling extends priority target zones at Linka; and 16 October 2026: Drilling resumes at Linka
tungsten project.
Competent Person’s Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a
Member of the Australasian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of
Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the
disclosure of the information in this report in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When used
in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may," "potential," "should," and similar
expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
7
ASX:VKA | vikingmines.com
ABOUT THE LINKA TUNGSTEN PROJECT
The Linka Tungsten Project is located in Lander and Pershing counties, Nevada, USA, and
comprises three historically producing tungsten mines: Linka, Conquest and Hillside.
Mineralisation occurs as scheelite-bearing skarn developed in limestone along the contact with
granitic intrusive rocks. The mines produced approximately 65,000 tonnes at 0.5% WO₃ through
a 360 tonne-per-day mill up to 1956, when operations ceased in response to the prevailing
tungsten price rather than for geological reasons. Linka's historical mill grade of approximately
0.5% WO₃ ranks among the highest of comparable global tungsten projects.
In December 2025 Viking signed a binding term sheet to acquire a 100% interest in the Project
and is pursuing a brownfields restart strategy that builds on substantial existing infrastructure,
including a 150ft (~46m) shaft, historic pits and underground workings, an on-site ROM pad and
historical tailings dam, and approximately 8.5km² of consolidated mining claims, with sealed
highway within 7km and grid power within 4km. Digitisation of 72 historical drillholes (2,908m)
has extended the known mineralised trend to 1.6km within an interpreted ~7km regional intrusive
contact that remains largely untested. Surface sampling has returned grades up to 14.7% WO₃,
and recent metallurgical testwork has produced a 56.9% WO₃ concentrate at 76.0% recovery
using conventional gravity and flotation. With tungsten designated a critical mineral and the US
REEShore Act mandating Chinese-free tungsten in US military supply chains from December
2026, the Project is positioned to advance towards a near-term, domestically sourced restart.
8
ASX:VKA | vikingmines.com
APPENDIX 1 – DRILLHOLE INFORMATION
Hole ID
Hole
Type
From
(ft)
To (ft)
From
(m)
To (m)
Interval
(m)
Est. visual
scheelite
abundance (%)
LKRC0044 RC 185 195 56.4 59.4 3.0 0.1-0.3
9
ASX:VKA, OTC:VKALF | vikingmines.com
APPENDIX 2 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as downhole gamma sondes, or handheld XRF
instruments, etc.). These examples should not be taken as limiting the broad
meaning of sampling.
RC chip samples are collected at the drill rig during the drilling process. The full drilling interval is
collected from the sampling system on the drill rig into plastic bags. The sample is sieved to collect a
portion of chips for geological logging. The chips are subsequently lamped using a shortwave UV light
(254nm) to assess visually scheelite content.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
For each sample interval, RC sample recovery is monitored for excessive sample loss and recorded to
ensure sample representivity. Sample condition (dry/moist/wet) is also recorded to ascertain sample
quality.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold that
has inherent sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed information
RC drilling is used to obtain either 1m, 2.5ft (0.76m) or 5ft (1.52m) sample intervals depending on the
drilling rig being used and tooling available (metric vs imperial length drill rods). For the holes reported
in this announcement, samples were collected on 5ft intervals. No laboratory assay results have yet been
received for the holes referred to in this report and this report outlines visual estimates from the RC chip
samples collected.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Reverse circulation (RC) drilling using a face-sampling hammer is utilised.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
RC drilling recoveries are visually estimated and recorded as part of geological logging and sampling
process and is estimated as either Good, Fair, Poor or No sample.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
RC drilling sample recovery is monitored to ensure representivity of the samples. High pressure air
compressors with auxiliary boosters and compressors are used to maximise good sample recovery from
the drillhole. The company monitors recovery using visual estimates and weights of sample recovered.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
Not applicable. No assays reported.
Logging
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
RC logging of all drill cuttings is undertaken. No geotechnical logging has been undertaken. Logging of
RC chips is sufficient to support future studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc.) photography.
Geological logging of RC chips is qualitative in nature. Quantitative estimates (visual percentage
estimates) are undertaken for abundance of key minerals (including scheelite). Photographs are taken of
all RC chip trays under natural and shortwave UV (254nm) light to identify fluorescent minerals.
10
ASX:VKA, OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
The total length and percentage of the relevant intersections logged. 100% of RC drilling is logged.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken. Not applicable.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled
wet or dry.
Splitting of dry samples is undertaken using a 3 tier riffle splitter with the full sample from the drilling
interval (2.5ft or 5ft) put through the riffle.
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
The sample preparation and sub-sampling techniques are appropriate for this material’s mineralogical
makeup.
Quality control procedures adopted for all subsampling stages to maximise
representivity of samples.
Sample mass per metre is recorded and any intervals with low recovery or anomalous mass are
investigated.
Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-half
sampling.
Duplicate samples are taken 1 in every 20 mineralised samples.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The current methods and processes described are appropriate for this style of mineralisation.
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
No new assay results are being reported.
For geophysical tools, spectrometers, handheld XRF instruments, etc., the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Not applicable.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
No new assay results are being reported.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
Not applicable, no new assay results are being reported.
The use of twinned holes. Not applicable, no new assay results being reported.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Primary data for drill cuttings, including sample number, depth, colour, grain size, weathering, lithology,
alteration, rock fabric and the presence of minerals potentially related to mineralisation are collected in
the field and entered into a spreadsheet which is then uploaded into relational (Maxwell Datashed)
database. Data is managed using the company’s sharepoint system and sample information is recorded
into notebooks at the time of sampling.
Discuss any adjustment to assay data. No assay results are being reported.
Location of
data points
Accuracy and quality of surveys used to locate drillholes (collar and downhole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
The collar positions have been initially measured using a handheld GPS with an accuracy of +/-5m (z).
Upon completion of the drilling programme a differential GPS (accuracy +/- 0.5m) is used to accurately
obtain the collar coordinates. The downhole azimuth and dip are surveyed using north seeking gyro tool
with an accuracy of +/- 1 degree for the azimuth and +/-0.1 degrees for the dip.
No MRE is being reported, but the methods being used are deemed suitable for any future MRE
estimation.
11
ASX:VKA, OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
Specification of the grid system used. The adopted grid system is NAD83/UTM Zone 11N and all data are reported in these coordinates.
Quality and adequacy of topographic control.
Publicly available LiDAR data from the USGS is at 1m accuracy and considered of a high quality and has
been used to determine the elevation of the samples collected.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Results are reported for individual drillholes from the Company’s maiden drilling programme at Linka.
See map in the body of the report for data spacing of drillholes. Drill spacing ranges from close (<10m)
to far (>200m).
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Not applicable, no mineral resource being reported.
Whether sample compositing has been applied. No sample compositing has been applied.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
At this early stage in the drilling programme, it has not been determined if the intervals are true width or
unbiased sampling has occurred. Due to the steep nature and azimuth of some of the drillholes being
reported, the intervals may have incurred a length bias, however the historical geological information
does demonstrate abrupt changes in strike and dip of the mineralisation. Further work is required to
determine if a length bias is present.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.
Drilling dip orientation across the programme is variable from -90 degrees to -55 degrees. Dip and
azimuth for the holes reported are listed in Appendix 1. At the SW Extension the orientation of the
limestone–monzonite contact and of any mineralisation is not yet established, and the relationship
between downhole length and true width is not known. Further drilling is required to confirm the
orientation of mineralisation.
Sample
security
The measures taken to ensure sample security.
Samples were collected in the field by Viking geologists and have been delivered to the ALS laboratory in
Reno, Nevada. Samples are secured and bagged and security is not deemed to be an issue.
Audits or
reviews
The results of any audits or reviews of sampling techniques and data. The Company has conducted no audits or reviews of the sampling techniques and data.
12
ASX:VKA, OTC:VKALF | vikingmines.com
JORC 2012 Table 1, Section 2 – Reporting of Exploration Results
Criteria JORC Code explanation Commentary
Mineral
tenement and
land tenure
status
Type, reference name/number, location and ownership including
agreements or material issues with third parties such as joint ventures,
partnerships, overriding royalties, native title interests, historical sites,
wilderness or national park and environmental settings.
Tenements and location
The USA Tungsten Project Lode Mineral Claims are located in the state of Nevada in the USA. Details of the
Mineral Claims are presented in the table below:
Project State County Type Holder Quantity
Linka Nevada Lander Unpatented
BLK Group LLC 10
Viking Tungsten LLC 91
Alpine Nevada Pershing Unpatented BLK Group LLC 4
Long Nevada Pershing Unpatented
BLK Group LLC 4
Viking Tungsten LLC 12
Ragged Top Nevada Pershing Unpatented
BLK Group LLC 8
Viking Tungsten LLC 30
Terrell Nevada Nye Unpatented
BLK Group LLC 10
Viking Tungsten LLC 56
Victory Nevada Nye Unpatented Kircher Mine Development LLC 8
Third Party Interests
Viking Mines Ltd has signed a binding term sheet to acquire a 100% interest in the project BLK Group LLC
Mineral Claims and currently holds no ownership. Viking can acquire 100% interest in the claims by paying a
total of US$2.88M over a staged 7 year period. BLK group will retain a 2% NSR on all minerals recovered from
mineral claims, and Viking retains the option to buy down 1% of the NSR for US$2M.
Native Title, Historical sites and Wilderness
There are no known registered historical sites over the Project Mineral Claims. The Mineral Claims are
registered with the Bureau of Land Management. The Linka Project has split federal agency responsibility with
the Bureau of Land management managing approximately half of the claims and the US Forestry Service the
other half. All the remaining projects fall under the jurisdiction of the BLM.
The security of the tenure held at the time of reporting along with any
known impediments to obtaining a licence to operate in the area.
The tenements are held in good standing by BLK Group LLC. To the best of Vikings knowledge, all annual
claim payments are up to date. There are no known impediments to obtaining a licence to operate in the area.
The US process is to file either a notice of intent or Plan of Operations to the responsible Federal Agency to
obtain permits for drilling. The Company does not know of any reason why these permits would not be
granted once the process if followed and the required bond payment made.
Exploration
done by other
parties
Acknowledgment and appraisal of exploration by other parties.
Linka Mine: The area was staked in 1941 by Steve Linka of Austin, NV. In 1943-44, the mine produced 2,420
tons of ore averaging 0.69% WOз. Consolidated Uranium Mines purchased the property in 1953, sunk a
vertical shaft to 210 feet and drove approximately 1,000 feet of drifts and cross-cuts on the 150’ level.
Additional production included; 4,000 tons of ore averaging 0.98% WOз between 1951 and 1956 and 60,000
tons averaging 0.40% WOз between 1955 and 1956. The mine closed when the Government buying program
ended. Mine workings include a 100’ X 50’ open-pit 25 feet deep, a 210’ shaft with approximately 1,500 feet of
drifts and cross-cuts. Shrinkage stopes extend from the 150’ level to the surface (Stager and Tingley, 1988).
In 1951, the Linka Mine was optioned to Hugh Chesser, Reno, NV. Hugh Chesser estimates shipments to
Metals Reserve Corporation during WWII totalled 2,673 tons averaging 0.72 percent WOз.
13
ASX:VKA, OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
Cache Creek Exploration held the properties in the early 1970’s and conducted geological and geophysical
programs. Duval Corporation optioned the properties in the mid-1970’s, did geological studies but no drilling.
Min-Ex drilled the property in 1977-78, with a total of 72 drillholes recorded (eight DDH and 64 wide-spread
percussion drillholes). Note: Not all drillhole locations have been established, with 69 holes digitised and 1
hole estimated (total 70) and three percussion holes with unknown location. Exploration activity completed by
Minex included drilling, surface and underground geological mapping and sampling, minor geophysical
magnetic survey with 10,400 linear feet collected (inconclusive results), 6,500ft of
Share your feedback
Discover