TUNGSTEN ASSAYS CONFIRM THICK INTERCEPTS AT LINKA
• Latest assays confirm thick zones of tungsten mineralisation continue both above and
below the historic Linka (Main) Mine workings in Nevada, USA; highlights include:
• LKRC0005: 18m at 0.42% WO3 from 62m (estimated true width ~16m),
including 3m at 0.75% WO3.
• LKRC0006: 13m at 0.46% WO3 from 70m (estimated true width ~11m),
including 4m at 0.70% WO3.
• Individual 1m samples grade up to 1.02% WO3, hosted in tactite (skarn) and consistent
with the Company’s 3D geological model.
• Results follow the previously reported 14m at 0.56% WO3 in LKRC0002i
, and are align
with historic recorded production at Linkaii
of ~0.49% WO3.
• Assays for a further 7 holes at Linka (Main) are pending (expected mid-October),
including LKRC0016; 9.9m visible scheeliteiii
and LKRC0017; 12.2m visible scheeliteiii
.
• Laboratory results continue to validate the Company’s visual scheelite loggingiii & iv
, with
assayed intervals correlating closely to the UV logged intervals in all four holes.
• 20 RC holes drilled to date with drilling scheduled to resume mid-October.
• Blue Moon Metals (TSX-V:MOON) recently announced JVv
with The Elmet Group and EQ
Resources (ASX:EQR) to invest US$150M - US$175M on the Springer Tungsten Mine
highlights the strategic importance of the Linka Project, located just 190 miles away.
Cautionary note: Visual estimates of mineral presence should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
Figure 1; Chip tray from LKRC0005 under shortwave UV light (254nm) showing the mineralised zone assaying 18m at 0.42% WO3 from
62m and including 3m at 0.75% WO3.
2
ASX:VKA | OTC:VKALF | vikingmines.com
Viking Mines Limited (ASX: VKA, OTCID: VKALF) (“Viking” or “the Company”) is pleased to
report the second batch of assay results from its maiden reverse circulation (“RC”) drilling
programme at the Linka Tungsten Project in Nevada, USA. Holes LKRC0005 and LKRC0006,
drilled to test down dip of the historic Linka Mine workings, have returned significant intervals of
18m at 0.42% WO3 from 62m and 13m at 0.46% WO3 from 70m downhole (Figure 2), while
LKRC0003 returned 6m at 0.21% WO3 from 16m and LKRC0004 returned 6m at 0.46% WO3 from
14m, confirming shallow mineralisation up dip of the historic stope and close to surface.
Viking Mines Managing Director & CEO Julian Woodcock said:
“The assay results continue to deliver grades as expected at Linka. LKRC0005 and LKRC0006 were
drilled to test below the historic workings, and both have returned thick intervals of tungsten
mineralisation at grades comparable to those mined at Linka through the 1950’s.
“Just as importantly, the shallow holes above the historic stopes have also returned mineralisation.
Together with the 14m at 0.56% WO3 in LKRC0002, these results further support a continuous zone
of mineralisation extending from near surface to below the depth the historic miners reached,
exactly as predicted by our 3D geological model.
“Tungsten continues to be confirmed within our zones of visually logged scheelite, which gives us
confidence in the shortwave UV logging estimates being made in the field. I look forward to
receiving the remaining assays for the holes completed to date and maintain high expectations of
further good results.
“In addition, the drill rig returns to site in October and we look forward to completing the maiden
drill programme at Linka.”
ASSAY RESULTS
Assay results have been received from ALS Laboratories in Reno, Nevada for holes LKRC0003 to
LKRC0006. LKRC0005 and LKRC0006 were designed to test the continuity of mineralisation down
dip of the historic workings, while LKRC0003 and LKRC0004 tested the crown pillar located
between the base of the open pit and the underground stoped out material. Mineralisation in all
four holes is hosted in tactite (skarn) and corresponds closely to the zones of disseminated and
coarse scheelite logged under shortwave UV light during drillingiii
.
Below the historic workings, LKRC0005 intersected an 18m zone of tungsten mineralisation
(estimated true width of ~16m) from 62m and LKRC0006 a 13m zone (estimated true width of
~11m) from 70m (Table 1), with individual 1m samples grading up to 1.02% WO3 (Appendix 1).
In the crown pillar, LKRC0004 returned 6m at 0.46% WO3 from 14m (estimated true width ~3m)
and LKRC0003 returned 6m at 0.21% WO3 from 15m (estimated true width ~5m).
LKRC0005 and LKRC0006 confirm that mineralisation continues below and down dip of the
historic stope and 150ft level workings (Figure 2), confirming that mineralisation was left in place
and extends beneath the historic mine workings. LKRC0003 and LKRC0004 also confirm
mineralisation continues up dip of the stope towards surface, between the historic open pit and
3
ASX:VKA | OTC:VKALF | vikingmines.com
the underground workings. Collectively the results support the interpretation of a continuous
mineralised zone from surface to below the historic workings.
Assay results for the remaining holes drilled to date, including 7 holes drilled at Linka (Main), are
pending with the results expected mid-October.
Table 1; Significant intercepts, LKRC0003 to LKRC0006, Linka Tungsten Project. Intervals are downhole lengths;
estimated true widths as stated in the table. Refer to Appendix 1 for full list of 1m assay results.
Hole ID From (m) Interval (m)
Estimated True
Width (m)
WO3
%
Cut-Off-Grade
WO3 %
LKRC0003 16 6 5 0.21 0.10
LKRC0004 14 6 3 0.46 0.10
LKRC0005 62 18 16 0.42 0.10
including 73 3 2.7 0.75 0.50
LKRC0006 70 13 11 0.46 0.10
including 70 4 3.4 0.70 0.50
Figure 2; Cross section (azimuth 280°, looking north) through LKRC0005 and LKRC0006 showing downhole WO3 assays
relative to the modelled mineralised tactite and historic workings. Grid NAD83 / UTM Zone 11N. Intervals are downhole lengths
4
ASX:VKA | OTC:VKALF | vikingmines.com
DRILLING PROGRAMME UPDATE
As of 22 September, 20 holes have been drilled at the Linka Project, with 14 holes completed
around the Linka (Main) pit and workings, 4 holes at the southwest extension (including one
abandoned hole) and 2 regional exploratory holes. The drill contractor has temporarily
demobilised from site for rig maintenance and crew break. The rig is scheduled to return to site
mid-October 2026 to complete the programme. Viking is using this period to update the 3D
geological model with the assay results received and to plan additional holes where warranted.
Linka (Main) Pit
Assay results have now been received for five holes at Linka Main (LKRC0002 to LKRC0006), all of
which have returned significant tungsten mineralisation. Visual scheelite interceptsiii
have been
reported for a further 7 holes, for which assays are pending (Figure 3).
Holes LKRC0015, LKRC0016 and LKRC0017 were drilled approximately 20m to the north-east of
LKRC0005 and LKRC0006 and returned 1.5m, 9.9m and 12.2m of visible scheelite respectivelyiii
.
Assays for these holes are anticipated in mid-October.
Cautionary note: Visual estimates of mineral presence should never be considered a proxy or
substitute for laboratory analyses where concentrations or grades are the factor of principal economic
interest. Visual estimates also potentially provide no information regarding impurities or deleterious
physical properties relevant to valuations.
Southwest Extension
Four holes have been drilled to date at the southwest extension (including abandoned hole
LKRC0001). Two holes have drilled through the younger cover, into limestone and subsequently
into the monzonite intrusive. Whilst no scheelite has yet been observed, the presence of the
limestone–monzonite contact supports the exploration model and further drilling is planned in
this area.
Regional Exploration
Two regional exploratory holes have been drilled. LKRC0013 tested through the younger cover
into limestone and subsequently into monzonite, confirming that limestone is preserved above
the intrusion. The second hole did not penetrate the younger tuff, leaving that area untested.
Further drilling is planned across the regional target area.
5
ASX:VKA | OTC:VKALF | vikingmines.com
Figure 3; Map showing location of holes drilled around the Linka Main Pit, assay results received to date and holes
awaiting assays with logged visual mineralisation (as reported to the ASX on 17 September 2026).
6
ASX:VKA | OTC:VKALF | vikingmines.com
NEXT STEPS
The Company’s near-term workstreams for the Linka Tungsten Project include:
• Assay results for the remaining holes to be reported as they are received and validated, with
the next batch expected mid-October.
• Resumption and completion of the maiden RC drilling programme mid-October 2026 across
the Linka Main, south-west extension and regional target areas.
• Update the Company’s 3D geological model with assay results to refine targeting for the
remaining holes.
• Ongoing metallurgical testwork on samples from Conquest, Hillside and Linka Stockpile.
• Second round of ore sorting testwork with TOMRA
• Identification of toll treatment options for the approved 900t bulk sample.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Learn more about Viking Mines via our investor hub here.
i
ASX announcement 10 September 2026: Maiden Linka drilling delivers exceptional tungsten intercept: 14 metres @ 0.56% WO3.
ii
ASX announcement 16 December 2025: VKA to acquire production proved USA tungsten projects.
iii
ASX announcement 17 September 2026: Drilling extends priority target zones at Linka.
iv
ASX announcements 19 August 2026: Viking drills wide scheelite zones at Linka
v
TSX-V : MOON Announcement 14 September 2026: Blue Moon, The Elmet Group, and EQ Resources Announce a US$150-$175
Million Investment into the Springer Tungsten Complex, Nevada, to Strengthen the U.S. Tungsten Supply Chain
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a Member of the
Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd. Mr Woodcock has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves’. Mr Woodcock consents to the disclosure of the information in this report in the form and context in which it appears.
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Viking
Mines Limited’s planned exploration programme and other statements that are not historical facts. When used in this document, the words such as
"could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking statements. Although Viking
Mines Limited believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and
uncertainties and no assurance can be given that actual results will be consistent with these forward-looking statements.
7
ASX:VKA | OTC:VKALF | vikingmines.com
ABOUT THE LINKA TUNGSTEN PROJECT
The Linka Tungsten Project is located in Lander and Pershing counties, Nevada, USA, and
comprises three historically producing tungsten mines: Linka, Conquest and Hillside.
Mineralisation occurs as scheelite-bearing skarn developed in limestone along the contact with
granitic intrusive rocks. The mines produced approximately 65,000 tonnes at 0.5% WO₃ through
a 360 tonne-per-day mill up to 1956, when operations ceased in response to the prevailing
tungsten price rather than for geological reasons. Linka's historical mill grade of approximately
0.5% WO₃ ranks among the highest of comparable global tungsten projects.
In December 2025 Viking signed a binding term sheet to acquire a 100% interest in the Project
and is pursuing a brownfields restart strategy that builds on substantial existing infrastructure,
including a 150ft (~46m) shaft, historic pits and underground workings, an on-site ROM pad and
historical tailings dam, and approximately 8.5km² of consolidated mining claims, with sealed
highway within 7km and grid power within 4km. Digitisation of 72 historical drillholes (2,908m)
has extended the known mineralised trend to 1.6km within an interpreted ~7km regional intrusive
contact that remains largely untested. Surface sampling has returned grades up to 14.7% WO₃,
and recent metallurgical testwork has produced a 56.9% WO₃ concentrate at 76.0% recovery
using conventional gravity and flotation. With tungsten designated a critical mineral and the US
REEShore Act mandating Chinese-free tungsten in US military supply chains from December
2026, the Project is positioned to advance towards a near-term, domestically sourced restart.
8
ASX:VKA | OTC:VKALF | vikingmines.com
APPENDIX 1 – DRILLHOLE INFORMATION & ASSAY RESULTS
Hole ID Hole Type
East (m)
NAD83
Zone 11n
North (m)
NAD83
Zone 11n
RL (m)
End of Hole
(m)
Azi (°) Dip (°)
LKRC0003 RC 514071 4353228 1795 31 315 -55
LKRC0004 RC 514037 4353227 1795 25 000 -90
LKRC0005 RC 514076 4353163 1800 84 280 -55
LKRC0006 RC 514073 4353163 1800 90 280 -65
9
ASX:VKA | OTC:VKALF | vikingmines.com
APPENDIX 2 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria JORC Code explanation Commentary
Sampling
techniques
Nature and quality of sampling (e.g. cut channels, random chips, or specific
specialised industry standard measurement tools appropriate to the minerals
under investigation, such as downhole gamma sondes, or handheld XRF
instruments, etc.). These examples should not be taken as limiting the broad
meaning of sampling.
RC chip samples are collected at the drill rig during the drilling process. The full drilling interval is
collected from the sampling system on the drill rig into plastic bags. The sample is sieved to collect a
portion of chips for geological logging. The chips are subsequently lamped using a shortwave UV light
(254nm) to assess visually scheelite content.
Include reference to measures taken to ensure sample representivity and the
appropriate calibration of any measurement tools or systems used.
For each sample interval, RC sample recovery is monitored for excessive sample loss and recorded to
ensure sample representivity. Sample condition (dry/moist/wet) is also recorded to ascertain sample
quality.
Aspects of the determination of mineralisation that are Material to the Public
Report. In cases where ‘industry standard’ work has been done this would be
relatively simple (e.g. ‘reverse circulation drilling was used to obtain 1 m samples
from which 3 kg was pulverised to produce a 30 g charge for fire assay’). In other
cases more explanation may be required, such as where there is coarse gold that
has inherent sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed information
RC drilling is used to obtain either 1m, 2.5ft (0.76m) or 5ft (1.52m) sample intervals depending on the
drilling rig being used and tooling available (metric vs imperial length drill rods). The full sample is
retained from the drill rig sampling system into plastic bags. Dry samples are processed through a 3-tier
riffle splitter to representatively reduce the sample mass to obtain a sub-sample (12.5% of original
sample mass) for laboratory analysis.
For hole LKRC0002 a different sampling system was used with a rig mounted riffle splitter. The company
determined the system was not suitable for the wet sample which was being produced and to mitigate
any errors, both the split and the remaining sample were collected into plastic bags. The full split was
collected and sent for analysis along with a duplicate sample from the reject bag. More details are
provided below on the QAQC procedures adopted for this hole.
The geologist at the rig determines the sample intervals to be selected for analysis using indicators such
as geological logging and utilising a shortwave UV light to determine presence of scheelite. General
procedure is to sample approximately 5m above and below the suspected mineralised intervals.
Samples selected for analysis are delivered to ALS laboratory in Reno, Nevada and are prepared using
lab method PREP-31BY which involves drying and subsequent crushing to 70% less than 2mm. Where
samples are >1kg, a 1kg subsample is collected using a rotary splitter. The 1kg (or less) sample is then
pulverised to better than 85% passing 75 microns.
The pulverised samples are analysed using lab method ME-MS89L is used which is considered total
using a lithium meta-borate fusion and ICP-MS finish.
Drilling
techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple or standard
tube, depth of diamond tails, face-sampling bit or other type, whether core is
oriented and if so, by what method, etc.).
Reverse circulation (RC) drilling using a face-sampling hammer is utilised. For hole LKRC0001 to
LKRC0006 a 5.25-inch diameter bit was utilised. For holes LKRC0007 onwards, a 4.5-inch diameter bit
has been utilised.
Drill sample
recovery
Method of recording and assessing core and chip sample recoveries and results
assessed.
RC drilling recoveries are visually estimated and recorded as part of geological logging and sampling
process and is estimated as either Good, Fair, Poor or No sample.
Measures taken to maximise sample recovery and ensure representative nature
of the samples.
RC drilling sample recovery is monitored to ensure representivity of the samples. High pressure air
compressors with auxiliary boosters and compressors are used to maximise sample recovery from the
drillhole. Drilling equipment and procedures are suitable to maximise sample recovery and the
10
ASX:VKA | OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
representative nature of the samples. Sample weights are recorded by the laboratory and reviewed to
ensure consistent sample weights are produced.
Whether a relationship exists between sample recovery and grade and whether
sample bias may have occurred due to preferential loss/gain of fine/coarse
material.
RC drilling uses industry standard drilling equipment and procedures that are suitable to maximise
sample recovery and ensure the representative nature of the samples. Insufficient data has been
collected to establish if any bias is present due to loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and geotechnically
logged to a level of detail to support appropriate Mineral Resource estimation,
mining studies and metallurgical studies.
Geological logging of all RC drill cuttings is undertaken. No geotechnical logging has been undertaken.
Logging of RC chips is sufficient to support future studies.
Whether logging is qualitative or quantitative in nature. Core (or costean,
channel, etc.) photography.
Geological logging of RC chips is qualitative in nature. Quantitative estimates (visual percentage
estimates) are undertaken for abundance of key minerals (including scheelite). Photographs are taken of
all RC chip trays under natural and shortwave UV (254nm) light to identify fluorescent minerals.
The total length and percentage of the relevant intersections logged. 100% of RC drilling is logged.
Subsampling
techniques and
sample
preparation
If core, whether cut or sawn and whether quarter, half or all core taken. Not applicable.
If non-core, whether riffled, tube sampled, rotary split, etc. and whether sampled
wet or dry.
Splitting of dry samples produced by the drill rig is undertaken using a 3 tier riffle splitter to obtain a
12.5% split, with the full sample from the drilling interval (1m, 2.5ft or 5ft) put through the riffle splitter.
For wet samples produced by the drill rig for hole LKRC0002, the whole sample is collected from the rig
mounted riffle splitter and submitted to the laboratory for analysis. For duplicate wet samples, a scoop is
collected from the reject sample bag. At the laboratory, samples are dried and those <1kg are not split
prior to pulverising. If samples are >1kg they are crushed and rotary split at the laboratory to <1kg
before being pulverised
For all sample types, the nature, quality and appropriateness of the sample
preparation technique.
For dry samples, the sample preparation and sub-sampling techniques are appropriate for this material’s
mineralogical makeup. For wet samples, the sampling method is not industry best practice and the
company mitigates the risk by increasing the volume of duplicate sampling to determine the effects. In all
cases, the primary commodity being assessed is measured in % which reduces the risk and impacts of
variability in the sampling method due to the relatively high concentrations of the commodity.
Quality control procedures adopted for all subsampling stages to maximise
representivity of samples.
Standard laboratory procedures adopted for analysis of samples including laboratory duplicate sample
analysis and standards. Duplicate sampling has been applied to the RC drill programme (see details
below) to measure repeatability of samples. Standards (1:20 samples) and blanks (1:25 samples) are
inserted by Viking Mines into the sampling sequence to both check accuracy and precision of the
analytical technique and for any contamination in the analytical process. Results are checked on receipt
of assay batches and QAQC reports produced by Viking Mines database manager for checking by the
geologist.
Measures taken to ensure that the sampling is representative of the in-situ
material collected, including for instance results for field duplicate/second-half
sampling.
For dry samples, the company collects scoop samples from the RC sample reject from the riffle splitter at
a ratio of ~1:10 samples. Laboratory analysis involved the duplicate analysis of certain samples are part of
the routine lab QAQC.
For hole LKRC0002, the company collected field duplicates via scoop samples from each sample interval
to review the impacts of the wet sampling. The mineralised interval was identified in the duplicate
11
ASX:VKA | OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
samples and an average grade was returned of 14m at 0.47% WO3 vs the original result of 14m at 0.56%
WO3. The duplicate sample predominantly analysed at a lower level. The cause of this variance has not
been determined and further data is required from the ongoing drill programme to determine if it is
statistically relevant.
Whether sample sizes are appropriate to the grain size of the material being
sampled.
The visual distribution of the grain size of the mineralisation seen under UV light indicates a range from
coarse to fine. The Competent Person considers the current methods and processes described as
appropriate for this style of mineralisation due to the grade of mineralisation being reported being
measured in percents and the large diameter hole being used (4.25-inch to 5.25-inch).
Quality of
assay data and
laboratory
tests
The nature, quality and appropriateness of the assaying and laboratory
procedures used and whether the technique is considered partial or total.
The assaying techniques utilised lab method W-MS89L which utilises a lithium meta-borate fusion and
ICP-MS finish. This technique is considered to be total and appropriate for the style of mineralisation
being investigated, specifically to ensure full digest of the scheelite to obtain a representative tungsten
assay.
For geophysical tools, spectrometers, handheld XRF instruments, etc., the
parameters used in determining the analysis including instrument make and
model, reading times, calibrations factors applied and their derivation, etc.
Not applicable.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates,
external laboratory checks) and whether acceptable levels of accuracy (i.e. lack of
bias) and precision have been established.
The company inserts one certified reference material every 20 samples, one blank every 25 samples and
selects one duplicate every 10 samples within suspected mineralised zones and the geologist discretion.
The analytical laboratory inserted blanks and standards and undertook duplicate analysis on a selection
of pulps. One standard returned a result in excess of 3 standard deviations of the certified value and is
being investigated. The result received was lower than the certified value and as such is interpreted that
an incomplete digest may have occurred. The Company has requested the laboratory reassay all samples
from the preceding to subsequent passed standard. All other QAQC results passed the company
requirements. In the event a material change is received with the re-assay results, they will be re-reported
to market. The hole affected by the reassay is LKRC0006 and part of LKRC0005. No other issues were
identified or reported by the laboratory and (subject to the ongoing investigation) acceptable levels of
accuracy and precision have been determined with the analytical technique. No umpire analysis has
been conducted which would be required to check for any laboratory bias.
Verification of
sampling and
assaying
The verification of significant intersections by either independent or alternative
company personnel.
Significant intersections have not been verified by either independent or alternative company personnel.
The use of twinned holes. No twinned holes have been drilled at this stage.
Documentation of primary data, data entry procedures, data verification, data
storage (physical and electronic) protocols.
Primary data for drill cuttings, including sample number, depth, colour, grain size, weathering, lithology,
alteration, rock fabric and the presence of minerals potentially related to mineralisation are collected in
the field and entered into a spreadsheet which is then uploaded into relational (Maxwell Datashed)
database. Data is managed using the company’s sharepoint system.
Discuss any adjustment to assay data.
The laboratory reports tungsten in its elemental for as W%. This is converted into Tungsten Oxide (WO3)
using stochiometric conversion factor by multiplying W% by 1.2611.
Location of
data points
Accuracy and quality of surveys used to locate drillholes (collar and downhole
surveys), trenches, mine workings and other locations used in Mineral Resource
estimation.
Drillhole collar positions are initially located using a handheld GPS with an accuracy of +/-5m (z). Upon
completion of the drilling programme a differential GPS (accuracy +/- 0.5m) will be used to accurately
obtain the collar coordinates. The downhole azimuth and dip are surveyed using a downhole north
seeking gyro tool with an accuracy of +/- 1 degree for the azimuth and +/-0.1 degrees for the dip.
No MRE is being reported, but the methods being used are deemed suitable for any future MRE
estimation.
12
ASX:VKA | OTC:VKALF | vikingmines.com
Criteria JORC Code explanation Commentary
Specification of the grid system used. The adopted grid system is NAD83/UTM Zone 11N and all data are reported in these coordinates.
Quality and adequacy of topographic control. Publicly available LiDAR data from the USGS is at 1m accuracy and considered of a high quality.
Data spacing
and
distribution
Data spacing for reporting of Exploration Results.
Results are reported for individual drillholes from the company’s maiden drilling programme at Linka.
See map in the body of the report for data spacing of drillholes. Drill spacing ranges from close (<10m)
to far (>200m).
Whether the data spacing and distribution is sufficient to establish the degree of
geological and grade continuity appropriate for the Mineral Resource and Ore
Reserve estimation procedure(s) and classifications applied.
Drilling needs to be completed before this can be determined. Currently no mineral resource estimate is
being reported. However, the drill programme has been designed to establish an appropriate degree of
geological and grade continuity to report a mineral resource in the future (subject to analysis of drilling
results to verify the continuity).
Whether sample compositing has been applied.
No sample compositing has been applied beyond the length-weighted aggregation of 1m assays
described in the body of the report.
Orientation of
data in relation
to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible
structures and the extent to which this is known, considering the deposit type.
Due to the steep nature and azimuth of some of the drillholes being reported, the intervals may have
incurred a length bias, however the historical geological information does demonstrate abrupt changes
in strike and dip of the mineralisation. The report includes estimates of true thickness relative to the
drillhole length intercept.
If the relationship between the drilling orientation and the orientation of key
mineralised structures is considered to have introduced a sampling bias, this
should be assessed and reported if material.