VKA RESOURCE UPDATE DELIVERS OVER 100% GROWTH AT CANEGRASS
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
20 November 2023
VIKING DELIVERS 103% GROWTH AT CANEGRASS WITH
2.2 BILLION LBS OF VANADIUM PENTOXIDE
•
Viking has completed an updated JORC (2012) Mineral Resource Estimate (MRE)
report for the Canegrass Battery Minerals Project (the Project).
•
MRE grows 103% and now contains >2.2 Billion Pounds of the critical mineral
Vanadium Pentoxide (V2O5).
•
Total Inferred MRE for the Project:
• 146Mt at 0.70% V2O5, 31.8% Fe & 6.6% TiO2 (>0.5% V2O5 cut-off)
•
High-grade subset of the MRE provides the basis to commence a Scoping Study to
assess Project options:
• 27.5Mt at 0.87% V2O5, 37.3% Fe & 8.0% TiO2 (>0.8% V2O5 cut-off)
•
Thick zones of high-grade mineralisation >0.8% V2O5 commence from surface
indicating potential for a low strip-ratio mining operation.
•
Maiden estimate for copper, nickel & cobalt at the Project, delivering:
• 146Mt at 0.066% Cu, 0.062% Ni & 0.016% Co (>0.5% V2O5 cut-off).
• Total metal content of 97Kt Cu, 90Kt Ni & 23Kt Co
• Metallurgical testwork planned to assess process options for these
additional valuable metals.
•
Applying metallurgical testwork results to the high-grade subset of the MRE
indicates the potential to deliver >16Mt concentrate at a grade of >60% Iron.1
•
The opportunity to produce a direct ship concentrate with credits for Iron and
Vanadium to be investigated.
•
Viking to commence with preliminary activities ahead of Scoping Study.
Viking Mines Ltd (ASX: VKA) (“Viking” or “the Company”) is pleased to provide an update
on the highly anticipated Mineral Resource Estimate (“MRE”) for the Canegrass Battery
Minerals Project (“the Project” or “Canegrass”), located in the Murchison region of Western
Australia.
The MRE has proven highly successful, with a 103% increase in the contained V2O5 to
2.2 Billion Pounds within the total MRE (>0.5% V2O5) of 146Mt at 0.70% V2O5, 31.8% Fe &
6.6% TiO2. Significantly, a high-grade subset of the MRE contains 27.5Mt at 0.87% V2O5,
providing the basis to move forward and commence with a Scoping Study on the Project.
The opportunity to produce a direct ship Iron Ore concentrate from the Project with credits
for Vanadium content to be investigated by the Company.
Viking Mines’ Managing Director & CEO, Julian Woodcock, said:
“I am extremely pleased with the outcome of the MRE. The Company identified the
opportunity at Canegrass with the presence of outcropping mineralisation throughout the
tenure which was not included in the 2017 MRE inherited with the Project.
1
Viking Mines (ASX:VKA) ASX Announcement 4 August 2023 – Viking Achieves Exceptional Vanadium Recoveries up to 99.3%
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
“Not only is it a significant achievement that we have more than doubled the contained
Vanadium within the Deposit, but more importantly we have identified and defined a
substantial high-grade portion of 27.5Mt at 0.87% V2O5 which will form the basis for
commencing a Scoping Study.
“With the positive results from the metallurgical testwork completed earlier this year that
produced a magnetic concentrate >60% Fe1, we can now investigate the opportunity to
produce a magnetite concentrate suitable for direct shipping.
“Combined with the first estimates for Cu, Ni and Co, this provides additional optionality for
Viking to assess multiple pathways to release the huge inherent value in this large multicommodity Resource.”
Figure 1; Map of the Canegrass Project showing the JORC (2012) MRE for each of the deposit areas and the total combined
estimate. Note all Resources are Inferred category reported above a 0.5% V2O5 cut-off. Totals may vary due to rounding.
ASX:VKA | vikingmines.com
2
CANEGRASS PROJECT MINERAL RESOURCE ESTIMATE
Industry consultants, MEC Mining have completed the MRE update for Viking Mines
Canegrass Project. The MRE update is the product of the extensive exploration campaign
undertaken by Viking since announcing acquisition of the Project in November 2022.
The MRE has determined a significant increase at the Project over the previous estimate
reported by Red Hawk Mining in 2017.2 Table 1 below provides the summary of the MRE and
comparison to the previous estimate.
The tonnage has increased substantially, with improvements in grade for all the target
commodities. Further, the grade of the deleterious elements has decreased, which results in
a higher quality ore more amenable to processing to produce a magnetic concentrate.
Table 1; 2023 Canegrass Project MRE update and comparison to 2017 model2 showing substantial growth in tonnes and grade of the
primary commodities (reported above a 0.5% V2O5 cut-off). Note, Cu, Ni & Co were not estimated for the Project in 2017.
Most significantly is a high-grade subset of the MRE when reported above the higher cut-off
of 0.8% V2O5. This cut-off has been selected as it represents the change from disseminated
magnetite in gabbro to massive magnetite bands seen in the drilling data and forms
continuous zones which the Company believe could be amenable to mining.
This high-grade subset of the MRE will form the basis for Vikings future work to assess the
economic viability of the Project and aligns with the Company’s aspirations to become a 1520 year mine life operator processing 1.5-2.0Mtpa.
A summary of the MRE above a 0.8% cut-off is provided in Table 2 below.2
Table 2; 2023 Canegrass Project MRE high-grade subset >0.8% V2O5 cut-off as a part of the total Resource.2
A full breakdown of the MRE by individual deposits is provided in Appendix 1 and shown on
Figure 1.
2
Viking Mines (ASX:VKA) ASX Announcement 30 November 2022 – Viking to Farm Into Substantial Battery Minerals Project
ASX:VKA | vikingmines.com
3
Figure 3; Cross-section through the Fold Nose Deposit looking to the NE showing the distribution of high-grade zones within the broader
mineralised package. Note mineralisation extends from surface to depth with over 460m dip continuity and thicknesses up to 30m.
Figure 2; Cross-section through the Kinks Deposit looking to the West showing the distribution of high-grade zones within the broader
mineralised package. Note mineralisation extends from surface to depth with over 390m dip continuity and thicknesses up to 28m.
ASX:VKA | vikingmines.com
4
Figure 4; Cross-section through the Kinks South Deposit looking to the West showing the distribution of high-grade zones within the
broader mineralised package. Note mineralisation extends from surface to depth with over 280m dip continuity and thicknesses up to 31m.
Target Commodities & Mineral Content
The primary target commodities for the Project are Vanadium (as V2O5), Iron, Titanium (as
TiO2), Copper, Nickel and Cobalt. The MRE has resulted in substantial quantities of these
valuable minerals being defined. Table 3 & Table 42 provide a summary of the contained
commodities within the MRE at the stated cut-off grades. The tonnage and grade values used
to determine these mineral quantities are provided in the tables above.
Table 3; Contained quantities in the MRE of the target commodities above a 0.5% V 2O5 cut-off
Table 4; Contained quantities in the MRE of the target commodities above a 0.8% V 2O5 cut-off
ASX:VKA | vikingmines.com
5
GROWTH POTENTIAL
With the extensive drilling completed by the Company and the completion of the MRE, areas
for further growth have been identified at each of the three deposits (Figure 5, Figure 6 &
Figure 7). This provides further upside opportunity to both increase the tonnes and grade of
the high-grade subset of the total MRE.
With further drilling in these areas, it is anticipated that the total high-grade subset will grow
and exceed the Company’s target of >30Mtand commensurate growth of the total MRE
>0.5% V2O5 cut-off will likely occur as a byproduct of this work.
Drill programmes to test these areas will be investigated by the Company as part of future
work programmes.
Figure 5; Map of the Fold Nose Deposit with 2023 MRE limits shown and target areas for further growth of the MRE illustrated.
ASX:VKA | vikingmines.com
6
Figure 6; Map of the Kinks Deposit with 2023 MRE limits shown and target areas for further growth of the MRE illustrated.
Figure 7; Map of the Kinks South Deposit with 2023 MRE limits shown and target areas for further growth of the MRE illustrated.
ASX:VKA | vikingmines.com
7
FORWARD STRATEGY
With the high-grade subset of the total MRE reaching close to our aspirational target of 30Mt
>0.9% V2O5, the Company is now focussed on determining the most effective method to
release the high inherent value of the Project.
Further metallurgical testwork has commenced with the objective of producing V2O5 flake as
an end product suitable for sale from the Project. This testwork will also further evaluate the
mineralisation and its suitability to produce a marketable Iron Ore concentrate. The benefit
of this approach is that a much lower capital cost project could be undertaken to produce a
magnetic concentrate which could be direct shipped to offtake partners.
In addition to investigating the metallurgy and potential of offtake partners for product from
the Project, the Company will commence with initial economic assessments with a pit
optimisation study. This is a key pre-cursor to commencing a Scoping Study as it will define
an indication of the size of operation which could be supported by the updated MRE.
Discussions have commenced with MEC Mining to undertake this work.
In parallel with the pit optimisation study, the Company will also commence determining the
key steps required to complete a Scoping Study on the Project.
These next stage work programmes will collectively identify the economic potential of the
project.
MINERAL RESOURCE ESTIMATE — MATERIAL INFORMATION SUMMARY
Viking Mines engaged industry consultants MEC Mining to undertake a Mineral Resource
Estimate (MRE) for the Canegrass Battery Minerals Project.
The MRE incorporates 3 deposits called Fold Nose, Kinks and Kinks South, with estimates
completed for the following: V2O5, Fe, TiO2, Cu, Ni, Co, SiO2, Al2O3, P, LOI, and Density.
A summary of sampling techniques and data, and estimation and reporting methodologies
is contained in JORC Table 1 which is included as an attachment to this ASX release.
The Resource is reported above the 210 m RL, which effectively removes all blocks at a depth
greater than 250 m below surface. MEC Mining consider that this approach results in a
Mineral Resource Estimate which appropriately and transparently addresses the “Reasonable
Prospects for Eventual Economic Extraction” requirement for Mineral Resources reported
under the JORC Code (2012 Edition) with regards to mining potential.
Geology and Geological Interpretation
All domains were defined using a combination of grade, primarily vanadium, titanium, and
iron; magnetic susceptibility, density, and lithology. Domains were modelled on the basis
that the deposits were formed from differentiation of layers in the magma chamber melt and
were subsequently folded. An implicit model was used to guide the explicit modelling. All
MRE were reported above an economic cut-off grade of 0.5% V2O5, no top cuts were applied
as no extreme values that could bias the estimation were observed.
The final wireframes constructed for each of the three deposits and coloured by domain are
shown in plan view below for the Kinks South area (Figure 8), the Fold Nose area (Figure 9)
and the Kinks area (Figure 10).
ASX:VKA | vikingmines.com
8
Figure 8; Plan view of Kinks South wireframes – Wireframe colours by sub-domains with the main domain coloured purple which
provides the largest contribution of mineralisation to the final MRE statement >0.5% V 2O5.
Figure 9; Plan view of Fold Nose Deposit wireframes – Wireframe colours by sub-domains with the main domain coloured
orange which provides the largest contribution of mineralisation to the final MRE statement >0.5% V2O5.
ASX:VKA | vikingmines.com
9
Figure 10; Plan view of Kinks wireframes – Wireframe colours by sub-domains with the main domain coloured orange which provides
the largest contribution of mineralisation to the final MRE statement >0.5% V 2O5.
Sampling and Sub-Sampling Techniques
Reverse circulation (“RC”) drilling was the primary sampling method, with lessor diamond
(NQ2 size) drilling. Cone splitters were used for sampling 1m intervals during RC drilling
programmes with the 2m and 4m composite samples obtained by spear or scoop sampling
of bags.
Diamond core was cut in quarter with a core saw and sampled at variable intervals. RC
recoveries were reported as all very good based on visual estimates but not quantified. The
diamond recoveries reported as excellent but not quantified.
Samples were then sorted, dried and weighed at the laboratory. The whole sample was then
crushed, and split with a riffle splitter to collect a sub-sample, which was then pulverised using
a vibrating pulveriser.
Drilling Techniques
One hundred and five (105) drill holes for 15,833m were used for the MRE; inclusive of 102
Reverse Circulation (RC) drillholes for 14,978m, and 3 Diamond drill holes for 678m. Drillhole
depths range from 7m to 500.7m. Viking drilled 43 drillholes for 7,104m, 45% of the total
15,833m.
•
Fold Nose has 47 drillholes for 7,426.7m; inclusive of 46 RC drill holes for 6,926m, and 1
Diamond drillhole for 500.7m. Viking Drilled 17 holes for 2,768m which is 37%, and
Historic drilling is 30 drillholes for 4,658.7m which is 63%.
•
Kinks South has 34 drillhole for 4,578.3m; inclusive of 2 Diamond drillhole for 177.3m,
and 32 RC drillholes for 4,401m. Viking Drilled 19 drillholes for 3,237m which is 71%, and
Historic drilling is 15 holes for 1,164.3m which is 29%.
ASX:VKA | vikingmines.com
10
•
Kinks has 24 drillholes for 3,828m. All Kinks drillholes are RC. Viking Drilled 7 holes for
1,099m which is 29%, and Historic drilling is 17 drillholes for 2,729m which is 71%.
The drillhole spacing at Fold Nose varies from 100m x 50m to 300m x 100m. The drillhole
spacing at Kinks South varies from 50m x 100m to 300m x 100m. The drillhole spacing at
Kinks varies from 100m x 100m to 300m x 150m.
Classification Criteria
The Mineral Resource has been classified in accordance with guidelines contained in the
JORC Code (2012 Edition). Data quality, data distribution, and the geological and grade
continuity at the project were considered prior to forming a judgement on Mineral Resource
confidence. Following consideration of these aspects, Fold Nose, Kinks South and Kinks
Mineral Resources were classified as Inferred.
Sample Analysis Method
The majority of samples used to estimate the Mineral Resource were derived from drilling
completed by Maximus Resources, Flinders Mines (now Red Hawk Mining) and Viking Mines.
Theses samples were submitted to laboratories in Perth for analysis. A prepared sample is
fused using a 12:22 lithium tetraborate – lithium metaborate flux to form a glass bead then
determined by x-ray fluorescence (XRF). Loss on ignition results were determined using a
robotic TGA system. Furnaces in the system were set at 425, 650 and 1000O C. Samples were
analysed by XRF for 21 elements including V, Fe, TiO2, Cu, Ni, Co, SiO2, Al2O3, P and LOI, in
addition to other constituents that weren’t estimated. The techniques are considered total.
Estimation Methodology
Assays were composited to 1m. The geology model wireframes were assigned to the assay
file. The grades within the wireframes were then used to model experimental variograms
using two components and spherical variogram models.
The Ore Block Model parent blocks were 20m x 20m east/west and north/south and 5m in
elevation, subcelled to 2m x 2m east/west and north/south and 1m in elevation. All blocks
were restricted to the geological wireframes.
Only those composited sample intervals which occur within the wireframed mineralisation
were used to interpolate grades into the block model, using ordinary block kriging, with
discretisation of 2 x 2 x 2 to partially address change of support issues. Negative kriging
weights were reset to zero and subcells were estimated to obtain resolution of estimation as
the narrow geometry of the lodes did not permit estimation to parent cells only.
The Fold Nose MRE were estimated using flattening and extension to allow for the training
of the search ellipse to include all relevant samples. The Kinks South and Kinks MRE were not
unfolded or flattened as they were linear.
Experimental semivariograms were modelled for:
•
Vanadium (with cobalt, copper and nickel using these variogram parameters for the
estimation of these elements);
•
Iron (with LOI, phosphorous, silica, and alumina using these variogram parameters for
the estimation of these elements); and
•
Titanium.
Search ellipse distances were defined initially from the semivariogram range distances and
were then increased to ensure all blocks were populated. Search ellipses used a minimum of
ASX:VKA | vikingmines.com
11
three drillholes for Run 1 to avoid isolated estimation of blocks. The search ellipse dimensions
were increased for Run 2 to populate all remaining blocks.
Some lodes included assay results for commodities such as Vanadium but did not include
LOI and other variables. As such, the average interpolated grade for the variable being
estimated was defaulted to blocks within the OBM which were not interpolated due to the
absence of values. This occurred for LOI in all three deposits and for SiO2 in the Kinks deposit.
Cut-off Grades
A cut-off grade of 0.5% V2O5 has been applied when reporting the Mineral Resource. A 0.5%
V2O5 cut-off grade is within the range adopted for reporting Mineral Resources at other
Australian VTM deposits for planned open cut operations.
Modifying Factors1,3
Davis Tube Recovery (DTR) test work has been completed at the Project, with the most recent
work completed by Viking on samples collected from the Kinks South Deposit. Results have
demonstrated that a magnetic concentrate can be produced with the Vanadium, Iron and
Titanium reporting to the concentrate. Recoveries over 90% vanadium reporting to the
magnetic concentrate were achieved. Further testwork is required to demonstrate that a
Vanadium Pentoxide flake product can be produced and is currently underway on samples
collected from the Fold Nose deposit.
Reasonable Prospects Hurdle
Clause 20 of the JORC (2012) Code requires that all reports of Mineral Resources must have
reasonable prospects for eventual economic extraction, regardless of the classification of the
resource.
MEC Mining deems that there are reasonable prospects for eventual economic extraction
using open pit mining on the following basis:
•
The Canegrass lodes outcrop or occur close to surface and will be amenable to opencut
mining to commence production.
•
A restriction of depth to 210 m RL was applied to all MRE that are prospective for opencut
mining, correlating with an average depth of 250m, which may be confirmed by
recommended pit optimisation studies.
•
The Canegrass Mineral Resource occurs within a prolific Vanadium region with several
projects in a pre-operations phase, there is strong nearology, and extensive
infrastructure.
•
The Canegrass project is 60km from the township of Mount Magnet, with sealed airstrip
& regular commercial flights. There is a bitumen road to within 22km of the Canegrass
project. The Midwest gas pipeline passes 22km north of the Project. The Canegrass
project is 419km from an established Port at Geraldton already used to export iron ore
and mineral sands.
•
The metallurgical testwork completed to date demonstrates that a magnetic concentrate
can be produced from the Project which indicates the potential to deliver a marketable
product.
•
A cut-off grade of 0.5% V2O5 has been applied when reporting the Mineral Resource. A
0.5% V2O5 cut-off grade is within the range adopted for reporting Mineral Resources at
other Australian VTM deposits for planned open cut operations.
3
Viking Mines (ASX:VKA) ASX Announcement 2 March 2023 – Viking Receives High-Grade Vanadium Results up to 1.47% V2O5
ASX:VKA | vikingmines.com
12
•
Demand for vanadium is likely to increase in the future, particularly given potential battery
applications.
NEXT STEPS
With the completion of the MRE and the substantial increase in both the quantity and quality
of the Resource, the Company has achieved a significant milestone, less than 12 months since
acquiring the Project. Work continues to advance the Project forward with the following key
items underway:
•
Second stage metallurgical testwork underway to produce V2O5 flake and demonstrate a
saleable product for offtake discussions.
•
Undertake a preliminary pit optimisation study to assess the potential production
opportunities and to feed into key objectives for a Scoping Study.
•
Further assessment of magnetic concentrate products to review options for a direct ship
iron ore product with vanadium credits.
•
Engage with potential offtake partners and commence discussions on marketing of
Canegrass concentrate.
END
This announcement has been authorised for release by the Board of Directors.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Sarah Wilson - Company Secretary
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration programme and other statements that are not historical facts. When used
in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar
expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results and exploration target is based on information compiled by Mr Julian
Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is
a full-time employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation
and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resources
The information in this announcement that relates to the Mineral Resource estimate is derived from information compiled by Mr
Dean O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and Competent Person for this
style of mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC Mining, an independent
mining and exploration consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of
the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr O’Keefe
consents to the inclusion in the report of the matters based on the results in the form and context in which they appear.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the
information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS
Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr
Connelly has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the original
announcements.
ASX:VKA | vikingmines.com
13
CANEGRASS BATTERY MINERALS PROJECT
The Canegrass Battery Minerals Project is located in the Murchison region, 620km north-east
of Perth, Western Australia. It is accessed via sealed roads from the nearby township of Mt
Magnet to within 22km of the existing Resources. The Project benefits from a large
undeveloped Inferred Vanadium Resource hosted in vanadiferous titanomagnetite (VTM)
Mineralisation as part of the Windimurra Layered Igneous Complex.
The Project benefits from ~95km2 of exploration tenements with very limited follow up
exploration targeting the growth potential of the vanadium pentoxide (V2O5) Resources in
the +10 years since the Resource was first calculated. Multiple drill ready targets are present
which have the potential to significantly add to the already large Resource base, with high
grade intercepts presenting an opportunity to substantially increase the average grade.
JORC (2012) MINERAL RESOURCE
The Canegrass Mineral Resource has been calculated across three separate areas called the
Fold Nose, Kinks and Kinks South deposits, each with. The Resource has subsequently been
reported above a cut-off grade of 0.5% V2O5 and above the 210 RL (equivalent to a maximum
depth of ~250m).
Canegrass Project Vanadium Mineral Resource estimate, 0.5% V2O5 cut-off grade, >210m RL (due to the effects of
rounding, the total may not represent the sum of all components).
Target Commodities
Deleterious Elements
JORC (2012) Cut-Off Tonnage
Ni
Co Al2O3 SiO2
P
V2O5 Fe TiO2 Cu
Classification V2O5%
(Mt)
%
%
%
%
%
%
%
%
%
VKA 2023 Model
Inferred
>0.5
146
0.70 31.8 6.6 0.066 0.062 0.016 11.7 21.7 0.005
MRE
LOI
%
1.7
VIKING MINES FARM-IN AGREEMENT
Viking, via its wholly owned subsidiary, Viking Critical Minerals Pty Ltd, commenced with a
Farm-In arrangement with Red Hawk Mining Ltd (formerly Flinders Mines Ltd) (ASX:RHK) on
28 November 2022 to acquire an equity interest in the Canegrass Battery Minerals Project.
Through the terms of the Farm-In, Viking can acquire up to 99% of the Project through
completion of 4 stages via a combination of exploration expenditure of $4M and staged
payments totalling $1.25M over a maximum period of 54 months. If Viking complete the
Farm-In to 99% equity interest, Red Hawk Mining may offer to sell to Viking the remaining 1%
of the Project for future production and milestone related payments totalling $850,000. If Red
Hawk Mining do not offer to sell within a prescribed timeframe their right lapses, they must
offer Viking the right (but not the obligation) to buy the remaining 1% for the same terms.
The Project has a legacy 2% Net Smelter Royalty over the project from when Red Hawk Mining
acquired it from Maximus Resources in 2009.
As of August 2023, Viking has completed the first stage of the Farm-In and acquired a 25%
equity interest in the tenements hosting the Deposits.
ASX:VKA | vikingmines.com
14
VANADIUM REDOX FLOW BATTERIES – GREEN ENERGY FUTURE
Viking Mines recognise the significant importance of Vanadium in decarbonisation through
the growth of the Vanadium Redox Flow Battery (“VRFB’s”) sector.
VRFB’s are a developing market as an alternate solution to lithium-ion (“Li-ion”) in specific
large energy storage applications. Guidehouse Insights Market Intelligence White Paperi
published in 2Q 2022 forecasts the VRFB sector to grow >900% by 2031 through the
installation of large, fixed storage facilities (Figure 11).
Figure 11; Forecast growth of the VRFB Sector through to 2031 (source – Guidehouse Insightsi)
The reason for this forecast growth is that VRFB’s have unique qualities and advantages over
Li-ion in the large energy storage sector to complement renewable energy sources to store
the energy produced. They are durable, maintain a long lifespan with near unlimited
charge/discharge cycles, have low operating costs, safe operation (no fire risk) and have a
low environmental impact in both manufacturing and recycling. The Vanadium electrolyte
used in these batteries is fully recyclable at the end of the battery’s life.
Importantly, and unlike Li-ion, the battery storage capacity is only limited by the size of the
electrolyte storage tanks. This means that with a VRFB installation, increasing energy storage
capacity is only a matter of adding in additional electrolyte (via the installation of additional
electrolyte storage tanks) without needing to expand the core system components.
Increasing the energy storage directly reduces the levelized cost per kWh over the
installation’s lifetime. This is not an option with Li-ion batteries.
It is for these reasons that VRFB’s are an ideal fit for many storage applications requiring
longer duration discharge and more than 20 years of operation with minimal maintenance.
i) Guidehouse Insights White Paper Vanadium redox Flow Batteries Identifying Market Opportunities and Enablers Published 2Q 2022
https://vanitec.org/images/uploads/Guidehouse_Insights-Vanadium_Redox_Flow_Batteries.pdf
ASX:VKA | vikingmines.com
15
APPENDIX 1 – 2023 MINERAL RESOURCE ESTIMATE SUMMARY BY DEPOSIT
ASX:VKA | vikingmines.com
16
APPENDIX 1 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Tech
Share your feedback