Quarterly Report for the period ended 30 September 2023
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
18 October 2023
QUARTERLY REPORT FOR THE PERIOD ENDED
30 SEPTEMBER 2023
Canegrass Battery Minerals Project
•
VKA acquired a 25% Equity Stake in the Canegrass Project after successful
completion of Stage 1 of the Farm-In Agreement.1
•
Results from the 7,500m drill programme returned significant consistent high-grade
intervals of Vanadium Pentoxide (V2O5) across all target areas, including:
•
Fold Nose Deposit: (VCRC0027)2
• 42m at 0.74% V2O5 (>0.5%) from 79m, inc;
17m at 0.80% V2O5 (>0.8%) from 83m &
8m at 0.99% V2O5 (>0.8%) from 108m
•
Kinks Deposit: (VCRC0021)3
• 40m at 0.75% V2O5 (>0.5%) from 202m inc
27m at 0.83% V2O5 (>0.5%) from 203m
•
Kinks South Target: (VCRC0011)4
• 38m at 0.76% V2O5 (>0.5%) from 114m, inc;
15m at 0.95% V2O5 (>0.8%) from 118m &
7m at 0.98% V2O5 (>0.8%) from 145m
• 15m at 0.72% V2O5 (>0.5%) from 160m, inc
10m at 0.92% V2O5 (>0.8%) from 165m
•
Metallurgical testwork on hole VCRC0006 17m at 0.98% V2O5 achieved 90.9%
recovery into magnetic concentrate grading 1.44% V2O5, 60.3% Fe & 10.6% TiO2.
•
Updated MREs to be completed for the Fold Nose Deposit, Kinks Deposit and a highly
anticipated maiden MRE for the Kinks South Target Area.
•
Significant improvement to the Canegrass Global MRE anticipated.
Ghana Gold Project
•
Final settlement agreed in the ongoing legal proceedings in Ghana and US$2.12M
(A$3.30M) received.5
Corporate
•
Strong cash position of $5.6M as of 30 September 2023.
•
Subsequent to the reporting period, Mr Bevan Tarratt was appointed as NonExecutive Director of the Company.6
Viking Mines (ASX:VKA) ASX Announcement 16 August 2023 – Viking Proceeds Exceptional Vanadium Recoveries up to 99.3%
Viking Mines (ASX:VKA) ASX Announcement 4 September 2023 – Viking Drills Massive Vanadium Zone with 42m at 0.75% V 2O5
3
Viking Mines (ASX:VKA) ASX Announcement 24 August 2023 – Viking Hits High-Grade at Kinks – 40m at 0.75% V2O5
4
Viking Mines (ASX:VKA) ASX Announcement 21 August 2023 – Viking Discovers Extensive Vanadium System at Kinks South
5
Viking Mines (ASX:VKA) ASX Announcement 25 September 2023 – Viking Receives $3.3M Final Settlement in Ghana Litigation
6
Viking Mines (ASX:VKA) ASX Announcement 3 October 2023 – Viking Appoints Non-Executive Director to the Board
1
2
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Viking Mines Limited (ASX:VKA) (“Viking” or “the Company”) is pleased to present its
quarterly activities report for the period ended 30 September 2023 (“September quarter”).
The Company’s focus during the reporting period was advancing exploration at the Canegrass
Battery Metals Project in Western Australia.
WESTERN AUSTRALIA
CANEGRASS BATTERY MINERALS PROJECT
Stage 2 of Canegrass Farm-In (25%)
Viking achieved a substantial milestone with the acquisition of the first 25% Equity Stake in
Canegrass Project after successful completion of Stage 1 of the Farm-In Agreement (FIA).7 The
Company made the decision to proceed with Stage 2 of the FIA following the satisfactory
completion of the Stage 1 commitment of $1 million exploration expenditure.
Stage 2 of the FIA will give Viking the right to earn a further 24% interest in the Project once
total exploration expenditure reaches $2 million on the Project and is to be completed by
August 2024. With $1.28 million spent to 31 July 2023 on the Project, Viking is well placed to
comfortably achieve this next milestone within the required timeframe.
Major 7,500m Drilling Programme
The Company drilled across eight target areas, focussed on extending and growing the
already substantial Inferred MRE8 of 79Mt at 0.64% V2O5 estimated for the Fold Nose and
Kinks Deposits.
Fold Nose Deposit
Drilling at the Fold Nose MRE target area returned thick high-grade zones of vanadium
mineralisation, both within and external to the current MRE limits. Additionally, the results
correlate with historical drilling, which has occurred since the last MRE update and has not
been included in the Mineral Resource (Figure 1).
The recently completed drilling programme included seventeen holes for 2,768m at the Fold
Nose MRE, Fold Nose North Extension (FNE) and Fold Nose South Extension (FSE) targets.
Selected significant Vanadium Pentoxide (V2O5) intercepts from the recent program and
located within the current Fold Nose MRE limits include:2
•
VCRC0027:
42m at 0.74% V2O5 (>0.5%) from 79m, including:
7m at 0.80% V2O5 (>0.8%) from 83m &
8m at 0.99% V2O5 (>0.8%) from 108m
•
VCRC0026:
38m at 0.72% V2O5 (>0.5%) from 138m, including:
26m at 0.82% V2O5 (>0.8%) from 140m
•
7
8
VCRC0031:
24m at 0.81% V2O5 (>0.5%) from 96m
Viking Mines (ASX:VKA) ASX Announcement 16 August 2023 – Viking Proceeds to Stage 2 of Canegrass Project Farm-In
Viking Mines (ASX:VKA) ASX Announcement 30 November 2022 – Viking to Farm Into Substantial Battery Mineral Resource
ASX:VKA | vikingmines.com
2
Additional significant Vanadium Pentoxide (V2O5) intercepts from the recent program and
located outside the current Fold Nose MRE limits include:
•
VCRC0035:
20m at 0.52% V2O5 (>0.5%) from 21m &
24m at 0.71% V2O5 (>0.5%) from 201m, including:
14m at 0.87% V2O5 (>0.8%) from 202m
•
VCRC0036:
22m at 0.53% V2O5 (>0.5%) from 21m, including:
6m at 0.91% V2O5 (>0.8%) from 35m
•
VCRC0038:
14m at 0.58% V2O5 (>0.5%) from 4m
Figure 1 – Map of the Fold Nose Deposit showing V2O5 assay results from Vikings 2023 drilling programmes. Intercepts are
reported above a 0.5% V2O5 cut-off, with included intercepts (where reported) >0.8% V2O5 cut-off. Composite intercepts have been
derived for zones>6m width, reporting above minimum cut-off grade and a maximum of 6m consecutive internal waste zones.
Intervals reported are downhole lengths and the true widths are not known. Note historical drillhole results which have not yet been
incorporated into the MRE for the Fold Nose deposit (orange callouts) and results currently informing the MRE (white callouts). 1
ASX:VKA | vikingmines.com
3
Kinks Deposit
Drilling at the Kinks Deposit returned thick high-grade zones of vanadium mineralisation at the
Western extents of the Mineral Resource (Figure 2). The results correlate with historical drilling,
which has occurred since the last MRE update and has not yet been included into the Mineral
Resource.
The recently completed drilling programme included seven holes at the Kinks MRE target area
for 1,099m, testing the higher-grade western and lower-grade eastern blocks within the Kinks
MRE target area.
Significant Vanadium Pentoxide (V2O5) intercepts from the recent program include:3
•
VCRC0021:
40m at 0.75% V2O5 (>0.5%) from 202m, including:
27m at 0.83% V2O5 (>0.8%) from 203m
•
VCRC0019:
38m at 0.70% V2O5 (>0.5%) from 96m, including:
15m at 0.86% V2O5 (>0.8%) from 101m
•
VCRC0020:
12m at 0.66% V2O5 (>0.5%) from 51m, including:
6m at 0.86% V2O5 (>0.8%) from 54m
Figure 2 – Map of the Kinks Deposit and the Kinks West Extension ETE target area showing V2O5 assay results from Vikings 2023
drilling programmes. Intercepts are reported above a 0.5% V2O5 cut-off, with included intercepts (where reported) >0.8% V2O5 cutoff. Note historical drillhole results which have not yet been incorporated into the MRE for the Kinks deposit (orange callouts) and
results currently informing the MRE (white callouts).2
ASX:VKA | vikingmines.com
4
All drillholes highlighted in the West Block are substantially above the current MRE average
grade of 0.57% V2O5, with results in multiple holes regularly exceeding 0.7% V2O5 (above a
0.5% cut off).
Further, drilling and mapping has confined that the mineralisation will extend to surface from
the current model, which has mineralisation restricted to~120m depth in the location of
FCRC0029.
Kinks South Target
Drilling at the Kinks South target has returned multiple and consistent, thick zones of vanadium
mineralisation (reported as V2O5) along a 1.5km strike length (Figure 3).
The Kinks South target does not form part of the current MRE and presents a substantial
opportunity for the Company to grow the mineral resource base, specifically targeting a highgrade component >30Mt >0.9% V2O5.
Figure 3 – Map of the Kinks South target area showing V2O5 assay results from Vikings 2023 drilling programmes. Intercepts are
reported above a 0.5% V2O5 cut-off, with included intercepts (where reported) >0.8% V2O5 cut-off. Composite intercepts have been
derived for zones>6m width, reporting above minimum cut-off grade and a maximum of 6m consecutive internal waste zones. Intervals
reported are downhole lengths and the true widths are not known. 3 VCRC0006 previously reported in ASX release 18 April 2023.
ASX:VKA | vikingmines.com
5
The recently completed drilling programme included 17 holes for 2,730m (including one 60m
tail on VCRC0005), testing >1.5km strike of Vanadiferous Titanomagnetite (VTM) horizon
identified in outcrop mapping and geophysics. Viking drilled 18 holes for a total of 2,892m
into the Kinks South target.
Significant V2O5 intercepts from the recent program include:4
•
VCRC0011:
38m at 0.76% V2O5 (>0.5%) from 114m, including:
15m at 0.95% V2O5 (>0.8%) from 118m &
7m at 0.98% V2O5 (>0.8%) from 145m
15m at 0.72% V2O5 (>0.5%) from 160m, including:
10m at 0.92% V2O5 (>0.8%) from 165m
•
VCRC0007:
46m at 0.55% V2O5 (>0.5%) from 68m, including:
12m at 0.82% V2O5 (>0.8%) from 88m
•
VCRC0008:
16m at 0.57% V2O5 (>0.5%) from 110m, including:
12m at 1.02% V2O5 (>0.8%) from 110m
•
VCRC0010:
34m at 0.57% V2O5 (>0.5%) from 43m, including:
12m at 0.96% V2O5 (>0.8%) from 61m
Fold Nose to Kinks South Target Area
Drilling at the Fold Nose to Kinks South target area has returned newly discovered zones of
vanadium mineralisation in an area not previously drilled (Figure 4).
These results confirm the hypothesis that VTM mineralisation continues between the MRE’s at
Fold Nose and Kinks South and demonstrates the opportunity to grow the Resource base with
further drilling.
The recently completed drilling programme included four holes for 530m at the Fold Nose to
Kinks South (FN to KS) exploration target area. Field mapping, magnetic geophysics and rock
chip sampling identified the target as having high potential to host Vanadium within the target
VTM horizon.
All four drillholes intersected VTM mineralisation, with reportable grades >0.5% V2O5
occurring in the northern two holes which warrant further follow up. The results from these two
holes are presented below.9
•
VCRC0045:
7m at 0.60% V2O5 (>0.5%) from 63m &
14m at 0.63% V2O5 (>0.8%) from 122m
•
9
VCRC0044:
12m at 0.68% V2O5 (>0.5%) from 60m
Viking Mines (ASX:VKA) ASX Announcement 12 September 2023 – Viking Intercepts 14m at 0.63% V2O5 >1.5km from Fold Nose Resource
ASX:VKA | vikingmines.com
6
The extent of the untested area between the Fold Nose Deposit the Kinks South target area
has the potential to provide significant further discoveries at Canegrass. Further work will be
required to assess this potential, but the Company is encouraged by the results of this first pass
wide spaced drilling at this target area.
Figure 4 – Map of the Fold Nose to Kinks South target area showing V 2O5 assay results from Vikings 2023 drilling programmes.
Intercepts are reported above a 0.5% V2O5 cut-off, with included intercepts (where reported) >0.8% V2O5 cut-off. Composite
intercepts have been derived for zones>6m width, reporting above minimum cut-off grade and a maximum of 6m consecutive
internal waste zones. Intervals reported are downhole lengths and the true widths are not known.
ASX:VKA | vikingmines.com
7
Metallurgical Testwork Results
36 samples were collected from hole VCRC0006 and submitted to ALS metallurgy for Davis
Tube Wash (DTW) testwork with a target P80 75-micron grind to ascertain recovery of
Vanadium by magnetic separation methods (Figure 5).
High recoveries of 90.9% were achieved for the main interval of 17m at 0.98% V 2O5, with the
concentrate grading 1.44% V2O5, 60.3% Fe, 10.6% TiO2, 1.13% SiO2 and 1.72% Al2O3 and a
high mass recovery of 59.6%.10
Mass recoveries for all samples averaged 45.7% by weight which is significantly higher than
typical titaniferous magnetite deposits (30% Wt/Wt). This will lead to improved economics
when processing this ore compared to other ores where the yield is typically 30% by weight.
Figure 5 – Cross-section through hole VCRC0006 showing Vanadium grades (coloured bands and values on the
right side of drillhole) and Vanadium recovery % (left side of drillhole).
10
Viking Mines (ASX:VKA) ASX Announcement 4 August 2023 – Viking Achieves Exceptional Vanadium Recoveries up to 99.3% at Canegrass
Project
ASX:VKA | vikingmines.com
8
Testwork Conclusions
The metallurgical testwork has proven to be highly successful with the following key
conclusions determined.
•
The DTW testwork has demonstrated that a high-quality magnetic concentrate can be
produced from the VTM mineralisation at the Canegrass Project.
•
Low levels of Al2O3 and SiO2 provide a positive indication that a suitable feed for roasting
can be produced to produce a V2O5 flake with further testwork required.
•
High-grade iron values in the concentrate demonstrate the opportunity to investigate
producing an iron/magnetite concentrate for direct shipping.
•
The confirmation of Cu, Ni and Co reporting at various recoveries to the non-magnetic tail
confirms future potential to recover this additional battery mineral and that more testwork
is required.
•
The mass yields were typically 45% by weight indicating the samples were fresh. Oxidised
or weathered samples would produce much lower yields.
•
Vanadium recovery remains consistent throughout hole VCRC0006 in zones of massive
magnetite.
MRE Update Commences
Subsequent to the reporting period, Viking appointed MEC Mining to undertake an updated
JORC Mineral Resource Estimate (MRE) on the Canegrass Battery Minerals Project.
Updated MREs will be completed for the Fold Nose Deposit, Kinks Deposit and a maiden MRE
for the Kinks South Target Area (Figure 6).
The results in the drilling completed by Viking at these three areas have demonstrated
potential for considerable improvements over the current Inferred JORC (2012) MRE of 79Mt
at 0.64% V2O58. The potential for both the growth of Resource tonnes and improvements in
grade have been realised in the drilling and provide the Company with optimism that a
substantially improved MRE could be delivered. Key takeaways include:
1. The Kinks South Target does not form part of the current MRE, providing the
opportunity for growth of the Mineral Resource Base with high-grade material,
specifically contributing the Company’s target for a high-grade component within the
global MRE of >30Mt >0.9% V2O5.
2. The Fold Nose Deposit MRE will be extended to surface in the North, South and West
from the current MRE limits as proven by the recent drilling campaign. With intercepts
up to 42m thick at 0.74% V2O5 seen in the hinge of the fold (from which the Deposit
takes its name) have the potential to deliver a thick, high-tonnage, high-grade
component.
3. At the Kinks Deposit, drilling has delineated an area in the West Block which is
substantially higher grade than the current Kinks MRE average grade of 0.57% V2O5
AND extended mineralisation to surface. Both the aspects are expected to substantially
improve the quality of the MRE.
The MRE update is anticipated to be completed within the December Quarter.
ASX:VKA | vikingmines.com
9
Figure 6 – Map of the Canegrass Project area showing the location of the current Mineral Resources at Fold Nose & Kinks and the
location of the Kinks South target. Note the strike length of the Kinks South target at 1.5km. 5
FIRST HIT GOLD & LITHIUM PROJECT
The Company’s First Hit Project (“First Hit Project”) is located 50km west of Menzies in the WA
Goldfields.
A small exploration drilling programme totalling 5 holes for 307m was completed on tenement
P30/1137 targeting extensions from the historic Emerald Gold Mine (not under Viking tenure).
No significant results were received, although a weak gold anomaly was identified which could
be related to the targeted structure. Further interpretation of the local geology is required to
incorporate the results observed in the drilling.
ASX:VKA | vikingmines.com
10
The Company also applied for two additional tenements during the period. The Company
notes the growing interest and prospectivity in the region associated with the advancement of
the Mt Ida Lithium project located ~40km north of the First Hit Mine (Figure 7).
The Company identified opportunities in acquiring additional exploration tenure in the area
and applied for the tenements accordingly. Tenement E30/571 is subject to a ballot with three
other parties (including FMG Resources Pty Ltd) and will be determined in due course.
Figure 7; Map showing current and newly applied for tenements relating to the First Hit Project. DLI resource reported in ASX
announcement 3 October 2023 Mt Ida Lithium Project Mineral Resource Estimate upgrade.
ASX:VKA | vikingmines.com
11
The Company plans to undertake a regional exploration programme in the December quarter
focussed on assessing the area for Lithium potential as well as continuing gold exploration
activities.
GHANA
Akoase Gold Project
Payments Received
During the quarter, the defendants made a payment of US$2.12M (A$3.3011) towards the Court
ruled debt of US$2.88m. The funds received are considered as final payment towards the
judgement of 24 January 2023, ordering the Defendants to pay US$2.88M.12
CORPORATE
Board Appointments
After the reporting period, the Company appointed Mr Bevan Tarratt as Non-Exectuive
Director to the Board.13
Other
The Company has a strong cash position of $5.58M as of 30 September 2023.
Income for the period totalled $3.38M and was composed of $3.31M as final settlement of the
legal dispute in Ghana, gain due to exchange rate variations on the Company’s US$ cash
reserves of $51k and a gain of $16k from investing activities (bank interest).
The Company’s cash position realised a net increase of $1.45M over the June 2023 quarter
Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $110k in the quarter ending 30 September 2023. This amount
comprised Director fees for the relevant period.
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure on exploration and evaluation activities for the quarter predominantly
related to:
•
$1,107k: Exploration expenditure on the Canegrass Project, predominantly composed of
the drilling and analytical costs invoiced in the period from the ~7,500m drilling
programme completed in the June Quarter FY23 and exploration expenditure on the First
Hit Project for drilling and analytical costs completed in the period for 5 holes for 307m on
P30/1137.
•
$489k: General corporate and administration costs, including ~$254k final legal fees
associated with the Ghanian litigation.
•
$225k: Canegrass Project – Stage 1 Farm-In acquisition cost.
•
$110k: Director fees and staff costs.
Calculated using ofx.com on 24 September 2023 using an exchange rate of 1USD = 1.5535986 AUD
ASX Announcement Viking Mines (ASX:VKA) 30 January 2023 – Viking succeeds in Ghana legal claim with greater than A$4M due.
13
ASX Announcement Viking Mines (ASX:VKA) 3 October 2023 – Viking Appoints Non-Executive Director to the Board
11
12
ASX:VKA | vikingmines.com
12
DECEMBER QUARTER PLANNED ACTIVITIES
The Company continues to make key advancements at the Canegrass Project, with the focus
on the interpretation of the results from the drilling completed in the June & September
quarters. Upcoming activities and priorities include:
•
Complete the updated MRE for the Canegrass Battery Minerals Project.
•
Updated density modelling.
•
Commencement of 2nd round metallurgical testwork designed to produce V2O5 flake from
a magnetic concentrate.
•
Plan and execute exploration programme for the First Hit Gold & Lithium Project.
•
Continue to review additional Projects that may be acquired by the Company that would
add substantial shareholder value.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Sarah Wilson - Company Secretary
+61 8 6245 0870
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a
Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee
of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the
disclosure of the information in this report in the form and context in which it appears.
Competent Persons Statement – Mineral Resources
The information in this report that relates to Mineral Resources is based on, and fairly reflects, information compiled by Mr Aaron
Meakin, a Competent Person who is a Member of the Australasian Institute of Mining and Metallurgy. Mr Meakin is a consultant to
Red Hawk Mining Ltd and Viking Mines Ltd, employed by CSA Global Pty Ltd, independent mining industry consultants. Mr Meakin
has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which
he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of
Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). The Company confirms it is not aware of any new
information or data that materially affects the information included in the original market announcements and that all material
assumptions and technical parameters underpinning the estimates in the relevant market announcement continue to apply and
have not materially changed. The Company confirms that the form and context in which the Competent Person’s findings are
presented have not been materially modified from the original announcement on 30 November 2022.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the
information and supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS
Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr
Connelly has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration, and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for
Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. The Company confirms that the form
and context in which the Competent Person’s findings are presented have not been materially modified from the original market
announcement.
ASX:VKA | vikingmines.com
13
APPENDIX 1 – TENEMENTS HELD OR WITH AN AGREEMENT TO ACQUIRE AN
EQUITY INTEREST AS AT 30 SEPTEMBER 2023
Australia
Project
License
name
M30/0091
M30/0099
P30/1144
E29/1133
First Hit Project
E30/0529
P29/2652
P30/1137
E29/1131
E29/1169
E30/0570
E30/0571
E30/0517
Location
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
Western
Australia
License type
License Holder/ JV
Partners i
Viking Mines
Ownership/Invol
vement
Mining Licence
Red Dirt Mining Pty Ltd
100%
Mining Licence
Red Dirt Mining Pty Ltd
100%
Red Dirt Mining Pty Ltd
100%
Viking Mines Ltd
100%
Viking Mines Ltd
100%
Viking Mines Ltd
100%
Red Dirt Mining Pty Ltd
100%
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Viking Mines Ltd
Red Dirt Mining Pty Ltd
Viking Mines Ltd
Viking Mines Ltd
Baudin Resources Pty Ltd.
100%
(under application)
100%
(under application)
100%
(under application)
100%
(under application)
0%(option over
exclusive area
over part of the
tenement)
Western
Prospecting
Viking Critical Minerals Pty Ltd
100%
Australia
Licence
Western
Prospecting
100%
P58/1942
Viking Critical Minerals Pty Ltd
Australia
Licence
(under application)
Western
Prospecting
100%
E58/0604
Viking Critical Minerals Pty Ltd
Australia
Licence
(under application)
Western
Exploration
Viking Critical Minerals Pty Ltd/
E58/0232
Australia
Licence
Flinders Canegrass Pty Ltd
Western
Exploration
Viking Critical Minerals Pty Ltd/
E58/0236
Australia
Licence
Flinders Canegrass Pty Ltd
Western
Exploration
Viking Critical Minerals Pty Ltd/
E58/0282
25% acquired
Australia
Licence
Flinders Canegrass Pty Ltd
(under Farm-In
Western
Exploration
Viking Critical Minerals Pty Ltd/
arrangement)
E58/0520
Australia
Licence
Flinders Canegrass Pty Ltd
Western
Exploration
Viking Critical Minerals Pty Ltd/
E58/0521
Australia
Licence
Flinders Canegrass Pty Ltd
Western
Exploration
Viking Critical Minerals Pty Ltd/
E58/0522
Australia
Licence
Flinders Canegrass Pty Ltd
Red Dirt Mining Pty Ltd and Viking Critical Minerals are 100% owned subsidiaries of Viking Mines Ltd.
Canegrass Project
P58/1943
i)
ASX:VKA | vikingmines.com
14
Rule 5.5
Appendix 5B
Mining exploration entity or oil and gas exploration entity
quarterly cash flow report
Name of entity
VIKING MINES LIMITED
ABN
Quarter ended (“current quarter”)
38 126 200 280
30 SEPTEMBER 2023
Consolidated statement of cash flows
Current quarter
$A’000
1.
Cash flows from operating activities
1.1
Receipts from customers
1.2
Payments for
(a) exploration & evaluation
Year to date
(3 months)
$A’000
(1,107)
(1,107)
(d) staff costs
(110)
(110)
(e) administration and corporate costs
(489)
(489)
16
16
(b) development
(c) production
1.3
Dividends received (see note 3)
1.4
Interest received
1.5
Interest and other costs of finance paid
1.6
Income taxes paid
1.7
Government grants and tax incentives
1.8
Other (provide details if material)
3,310
3,310
1.9
Net cash from / (used in) operating
activities
1,620
1,620
2.
Cash flows from investing activities
2.1
Payments to acquire or for:
(225)
(225)
(a) entities
(b) tenements
(c) property, plant and equipment
(d) exploration & evaluation
(e) investments
(f)
other non-current assets
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 1
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
2.2
Current quarter
$A’000
Year to date
(3 months)
$A’000
Proceeds from the disposal of:
(a) entities
(b) tenements
(c) property, plant and equipment
(d) investments
(e) other non-current assets
2.3
Cash flows from loans to other entities
2.4
Dividends received (see note 3)
2.5
Other (provide details if material)
2.6
Net cash from / (used in) investing
activities
3.
Cash flows from financing activities
3.1
Proceeds from issues of equity securities
(excluding convertible debt securities)
3.2
Proceeds from issue of convertible debt
securities
3.3
Proceeds from exercise of options
3.4
Transaction costs related to issues of equity
securities or convertible debt securities
3.5
Proceeds from borrowings
3.6
Repayment of borrowings
3.7
Transaction costs related to loans and
borrowings
3.8
Dividends paid
3.9
Other (provide details if material)
3.10
Net cash from / (used in) financing
activities
4.
Net increase / (decrease) in cash and
cash equivalents for the period
4.1
(225)
(225)
-
-
Cash and cash equivalents at beginning of
period
4,132
4,132
4.2
Net cash from / (used in) operating
activities (item 1.9 above)
1,620
1,620
4.3
Net cash from / (used in) investing activities
(item 2.6 above)
(225)
(225)
4.4
Net cash from / (used in) financing activities
(item 3.10 above)
-
-
ASX Listing Rules Appendix 5B (17/07/20)
+ See chapter 19 of the ASX Listing Rules for defined terms.
Page 2
Appendix 5B
Mining exploration entity or oil and gas exploration entity quarterly cash flow report
Consolidated statement of cash flows
Current quarter
$A’000
Year to date
(3 months)
$A’000
4.5
Effect of movement in exchange rates on
cash held
51
51
4.6
Cash and cash equivalents at end of
period
5,578
5,578
5.
Reconciliation of cash and cash
equivalents
Current quarter
$A’000
Previous quarter
$A’000
at the end of the quarter (as shown in the
consolidated statement of cash flows) to the
related items in the accounts
5.1
Bank balances
5.2
Call deposits
5.3
Bank overdrafts
5.4
Other (provide details)
5.5
Cash and cash equivalents at end of
quarter (should equal item 4.6 above)
6.
Payments to related parties of the entity and their
associates
6.1
Aggregate amount of payments to related parties and their
associates included in item 1
6.2
Aggregate amount of payments to related parties and their
associates included in item 2
5,578
5,578
5,578
5,578
Current quarter
$A'000
110
Note: if any amounts are shown in items 6.1 or 6.2, your quarterly activity report must include a description of, and an
explanation for, such payments.
ASX Listing Rules Appendix 5B (17/07/20
Share your feedback
Discover