VIKING EXPANDS PROSPECTIVE LITHIUM TENURE &
COMMENCES AUGER DRILLING AT FIRST HIT
•
Viking Mines purchases strategic tenement on the Mt Ida Fault zone, bringing the
total granted land package in this prospective Lithium district to ~291km2.
•
Mapped pegmatites occur throughout the new tenement, with historical rock chip
sampling confirming highly anomalous rare element pegmatite results including
Lithium up to 400ppm and Rubidium values up to 3,000ppm.
•
Multiple >50ppm Lithium anomalies identified in historic data on Viking tenure, up
to 200m x 700m, which have seen no follow up activity.
•
First phase auger drilling programme has commenced with ~1,200 samples planned
along the highly prospective 26km strike length.
•
Vikings tenements occur along the highly prospective Ida Fault which hosts
significant lithium deposits, including the Mt Ida Lithium Project 60km to the North.
•
Viking are establishing a substantial land package in this highly prospective Lithium
district, with two additional tenement applications lodged.
Viking Mines Limited (ASX: VKA) (“Viking” or “the Company”) is pleased to provide an
update on exploration activities at the Company’s First Hit Lithium & Gold Project (“the Project”
or “First Hit”), located west of Menzies in the WA Goldfields.
The Project is situated 60km south and along strike of Delta Lithium’s Mount Ida Lithium Gold
Project, that has delineated a substantial Mineral Resource Estimate totalling 14.6Mt at 1.2%
Li2O.1 Viking’s land package of granted tenements now stands at ~291km2 and a focussed
auger programme has commenced to test for LCT pegmatites.
Viking Mines Managing Director & CEO Julian Woodcock said:
“I’m pleased to announce that the Company increased its land position and commenced a
major auger drill program totalling ~1,200 holes, at the First Hit Lithium & Gold Project. Drilling
will assess an extensive 26km strike length covering >55km2 of tenure by collecting auger
samples from a depth of 1-2 metres, acting as a first pass test for lithium and gold potential.
“The tenements are strategically located on the well-endowed Ida Fault, which is highly
prospective for lithium, and is directly south of the Delta Lithium’s Mt Ida Project.
“Less than 14% of the area being tested by this programme has seen previous sampling for
Lithium, yet multiple anomalies >50ppm have been defined in this limited data set.
“The collection of new samples across the remainder of the tenure has the potential to both
grow the size of the current anomaly and define new targets.
“I look forward to updating the market with results from this program in the coming months.”
1
Mt Ida MRE is Inferred and Indicated, refer to Delta Lithium (ASX:DLI) ASX Announcement 3 October 2023: Mt Ida Lithium
Project Mineral Resource Estimate upgrade. Breakdown of classification at the end of this announcement in Note 1.
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
IDENTIFIED LITHIUM ANOMALIES
The Company has completed a review of the limited historical data and identified lithium
anomalies in soil samples and rock chips on Viking’s wholly owned tenure.
The most significant anomalies are located on E30/529 with multiple zones >50ppm Li up to
250m wide and 700m long (Figure 1). The orientation of the anomalies suggests that the
potential source of mineralisation may be NW-SE striking, which correlates with the orientation
of pegmatites identified at the First Hit Lithium-Gold Project.
Figure 1; Map showing the southern end of Viking tenement E30/529 with the location of historical samples (data sourced from
WAMEX). Strong NW-SE orientated >50ppm Lithium anomalies are evident.
ASX:VKA | vikingmines.com
2
On the newly acquired tenement, E30/505, the Company has assessed rock chip data with
results up to 400ppm Lithium and corresponding high elevated Rubidium values up to
3,000ppm.
In conjunction with the Lithium values recorded, Rubidium is associated with rare element
pegmatites, providing an indication of the potential of the tenement.
Multiple interpreted pegmatites have been identified in historic literature searches (Figure 2),
forming a NW-SE trending swarm across the tenement. An evaluation of the satellite imagery
has revealed a series of NE-SW striking features, which correlate with the historical data.
Figure 2; Map showing the geology, rock chip samples and interpreted pegmatites on tenement E30/505. Note NE-SW trend of
pegmatite swarm and large amount of unsampled pegmatites.
ASX:VKA | vikingmines.com
3
1,200 HOLE AUGER PROGRAMME UNDERWAY
Auger drilling operations have commenced at the Project (Figure 3). A total of ~1,200 holes
are scheduled to be drilled across the primary tenement holdings located along the Mt Ida
Fault (Figure 4), encompassing an area of ~55km2. The primary objective of this program is to
collect samples for analysis of multiple elements, with a focus on Lithium and Gold.
The current drilling phase serves as an initial exploration pass, providing valuable insights that
will inform and guide subsequent targeted drilling initiatives. The auger drill program is
expected to conclude by the end of November 2023.
After the completion of drilling activities, assay results are anticipated to be received in the
March 2024 quarter. These results will play a crucial role in shaping the direction of follow-up
exploration activities.
Figure 3: Gyro Australia Auger drill rig commencing auger drilling at the First Hit Gold & Lithium Project.
GROWING LAND POSTION IN A PROLIFIC LITHIUM DISTRICT
Viking is actively pursuing prospective tenure around the substantial landholding already
established on the Mt Ida Fault.
As part of this strategy, the Company has purchased a 95% interest to all minerals in tenement
E30/505. The tenement is located immediately to the west of Viking’s current tenure and
complements the existing land package (Figure 4).
Further, the Company has pegged additional tenements to the east and west. E30/570 is going
through the approvals process whilst E30/571 is subject to a ballot with three other parties, the
date of which is yet to be announced by the Western Australian government. The total land
package including applications stands at >535km2 (Figure 5).
The tenement is surrounded by tenements held by Ora Banda Mining (ASX:OBM) which has
recently divested the Lithium rights into a JV with Wesfarmers Chemicals, Energy & Fertilisers
for $26M.2
2
Ora Banda Mining ASX release dated 30 October 2023 “Ora Banda Signs Transformational $26million Lithium Focused JV with
Wesfarmers Chemicals, Energy and Fertilisers
ASX:VKA | vikingmines.com
4
Figure 4; Map showing the planned auger hole locations and historical sample results.
ASX:VKA | vikingmines.com
5
Figure 5; Location of the First Hit Project tenements and adjoining Company landholdings.
ASX:VKA | vikingmines.com
6
NEXT STEPS
Viking is progressing exploration at the First Hit Lithium & Gold Project with the objective of
identifying high-quality targets for follow up exploration activity that have the potential to
deliver economic deposits for Lithium or Gold.
To achieve this objective, the following work is planned to be completed on the Project.
•
Complete drilling of auger holes and collection of samples (by end of November).
•
Submit to laboratory for multi-element analysis (including lithium and gold) with results
expected in the March Quarter 2024.
•
On receipt of assay data, evaluate the results and identify anomalous areas for follow up
field work including field mapping, rock chip sampling, infill auger/soil sampling.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Sarah Wilson - Company Secretary
+61 8 6245 0870
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr
Julian Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy
(MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd. Mr Woodcock has
sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves’. Mr Woodcock consents to the disclosure of the information in this report in the form and
context in which it appears.
Competent Persons Statement – Mineral Resource Estimate
The information in this announcement that relates to the Mineral Resource Estimate is derived from
information compiled by Mr Dean O’Keefe, a Fellow of the Australasian Institute of Mining and
Metallurgy (AusIMM, #112948), and Competent Person for this style of mineralisation. Mr O’Keefe is a
consultant to Viking Mines Limited, and is employed by MEC Mining, an independent mining and
exploration consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and
type of deposit under consideration and to the activity which he is undertaking to qualify as Competent
Person as defined in the 2012 edition of the Australasian Code for the Reporting of Exploration Results,
Mineral Resources, and Ore Reserves (JORC Code). The Company confirms that the form and context
in which the results are presented and all material assumptions and technical parameters underpinning
the estimates in the original market announcement continue to apply and have not materially changed
from the original announcement and that the form and context in which the Competent Person’s findings
are presented have not been materially modified from the original announcement on 20 November
2023.
ASX:VKA | vikingmines.com
7
NOTE 1 – DELTA LITHIUM MINERAL RESOURCE
Delta Lithium Limited (ASX:DLI) released an update to the Mt Ida Lithium Mineral Resource
on 3 October 2023.
Following is the MRE table for Mt Ida that was released by DLI:
For further information, readers are directed to the ASX Announcement on 3 October 2023
entitled “Mt Ida Lithium Mineral Resource Estimate Update”
ASX:VKA | vikingmines.com
8
CANEGRASS BATTERY MINERALS PROJECT
The Canegrass Battery Minerals Project is located in the Murchison region, 620km north-east
of Perth, Western Australia. It is accessed via sealed roads from the nearby township of Mt
Magnet to within 22km of the existing Resources. The Project benefits from a large
undeveloped Inferred Vanadium Resource hosted in vanadiferous titanomagnetite (VTM)
Mineralisation as part of the Windimurra Layered Igneous Complex.
The Project benefits from ~95km2 of exploration tenements with very limited follow up
exploration targeting the growth potential of the vanadium pentoxide (V2O5) Resources in the
+10 years since the Resource was first calculated. Multiple drill ready targets are present which
have the potential to significantly add to the already large Resource base, with high grade
intercepts presenting an opportunity to substantially increase the average grade.
JORC (2012) MINERAL RESOURCE
The Canegrass Mineral Resource has been calculated across three separate areas called the
Fold Nose, Kinks and Kinks South deposits, each with. The Resource has subsequently been
reported above a cut-off grade of 0.5% V2O5 and above the 210 RL (equivalent to a maximum
depth of ~250m)(refer to ASX Announcement on 20 November 2023).
Canegrass Project Vanadium Mineral Resource estimate, 0.5% V 2O5 cut-off grade, >210m RL (due to the effects of
rounding, the total may not represent the sum of all components).
Target Commodities
Deleterious Elements
JORC (2012) Cut-Off Tonnage
Ni
Co Al2O3 SiO2
P
V2O5 Fe TiO2 Cu
Classification V2O5%
(Mt)
%
%
%
%
%
%
%
%
%
VKA 2023 Model
Inferred
>0.5
146
0.70 31.8 6.6 0.066 0.062 0.016 11.7 21.7 0.005
MRE
LOI
%
1.7
VIKING MINES FARM-IN AGREEMENT
Viking, via its wholly owned subsidiary, Viking Critical Minerals Pty Ltd, commenced with a
Farm-In arrangement with Flinders Mines Ltd (ASX:FMS) on 28 November 2022 to acquire an
equity interest in the Canegrass Battery Minerals Project. Through the terms of the Farm-In,
Viking can acquire up to 99% of the Project through completion of 4 stages via a combination
of exploration expenditure of $4M and staged payments totalling $1.25M over a maximum
period of 54 months. If Viking complete the Farm-In to 99% equity interest, Flinders may offer
to sell to Viking the remaining 1% of the Project for future production and milestone related
payments totalling $850,000. If Flinders do not offer to sell within a prescribed timeframe their
right lapses, they must offer Viking the right (but not the obligation) to buy the remaining 1%
for the same terms. The Project has a legacy 2% Net Smelter Royalty over the project from
when Flinders Mines acquired it from Maximus Resources in 2009.
ASX:VKA | vikingmines.com
9
VANADIUM REDOX FLOW BATTERIES – GREEN ENERGY FUTURE
Viking Mines recognise the significant importance of Vanadium in decarbonisation through the
growth of the Vanadium Redox Flow Battery (“VRFB’s”) sector.
VRFB’s are a developing market as an alternate solution to lithium-ion (“Li-ion”) in specific large
energy storage applications. Guidehouse Insights Market Intelligence White Paperi published
in 2Q 2022 forecasts the VRFB sector to grow >900% by 2031 through the installation of large,
fixed storage facilities (Figure 6).
Figure 6; Forecast growth of the VRFB Sector through to 2031 (source – Guidehouse Insightsi)
The reason for this forecast growth is that VRFB’s have unique qualities and advantages over
Li-ion in the large energy storage sector to complement renewable energy sources to store the
energy produced. They are durable, maintain a long lifespan with near unlimited
charge/discharge cycles, have low operating costs, safe operation (no fire risk) and have a low
environmental impact in both manufacturing and recycling. The Vanadium electrolyte used in
these batteries is fully recyclable at the end of the battery’s life.
Importantly, and unlike Li-ion, the battery storage capacity is only limited by the size of the
electrolyte storage tanks. This means that with a VRFB installation, increasing energy storage
capacity is only a matter of adding in additional electrolyte (via the installation of additional
electrolyte storage tanks) without needing to expand the core system components. Increasing
the energy storage directly reduces the levelized cost per kWh over the installation’s lifetime.
This is not an option with Li-ion batteries.
It is for these reasons that VRFB’s are an ideal fit for many storage applications requiring longer
duration discharge and more than 20 years of operation with minimal maintenance.
i) Guidehouse Insights White Paper Vanadium redox Flow Batteries Identifying Market Opportunities and Enablers Published 2Q 2022
https://vanitec.org/images/uploads/Guidehouse_Insights-Vanadium_Redox_Flow_Batteries.pdf
ASX:VKA | vikingmines.com
10
APPENDIX 1 – HISTORICAL SOIL & ROCK CHIP SAMPLING RESULTS
ASX:VKA | vikingmines.com
11
ASX:VKA | vikingmines.com
12
APPENDIX 2 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria
Sampling
techniques
Drilling
techniques
Drill sample
recovery
JORC Code explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random
chips, or specific specialised industry standard measurement
tools appropriate to the minerals under investigation, such as
downhole gamma sondes, or handheld XRF instruments, etc.).
These examples should not be taken as limiting the broad
meaning of sampling.
Salazar Gold 2017-18 E30/529: Soil samples were mostly collected at 100m intervals along E-W lines spaced 200m apart. A
small infill grid of 100m x 50m was collected on the Eastern Shear Zone in the south. Samples were taken at 20cm depth
and the whole sample collected for assay.
Simon Byrne 2023 E30/505: Rick chip samples were collected from quartz veins and pegmatites identified on the lease. No
information is available about the nature and quality of the sample.
Include reference to measures taken to ensure sample
representivity and the appropriate calibration of any
measurement tools or systems used.
Due to the historic nature of the data, it is unknown what measures were taken to ensure sample representativity in the
sample collection process.
Aspects of the determination of mineralisation that are Material
to the Public Report. In cases where ‘industry standard’ work
has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which
3 kg was pulverised to produce a 30 g charge for fire assay’). In
other cases more explanation may be required, such as where
there is coarse gold that has inherent sampling problems.
Unusual commodities or mineralisation types (e.g. submarine
nodules) may warrant disclosure of detailed information
Industry standard soils sampling and rock chip sampling was undertaken to collect samples for analysis by standard
analysis techniques including pulverising of samples prior to fire assay, 4 acid digest and XRF analysis.
Drill type (e.g. core, reverse circulation, open-hole hammer,
rotary air blast, auger, Bangka, sonic, etc.) and details (e.g. core
diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so,
by what method, etc.).
Not applicable.
Method of recording and assessing core and chip sample
recoveries and results assessed.
Not applicable.
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Not applicable.
ASX:VKA | vikingmines.com
13
Criteria
JORC Code explanation
Commentary
Whether a relationship exists between sample recovery and
grade and whether sample bias may have occurred due to
preferential loss/gain of fine/coarse material.
Not applicable.
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support
appropriate Mineral Resource estimation, mining studies and
metallurgical studies.
No logging information is available in the historical records.
Whether logging is qualitative or quantitative in nature. Core
(or costean, channel, etc.) photography.
Not applicable.
The total length and percentage of the relevant intersections
logged.
Not applicable.
If core, whether cut or sawn and whether quarter, half or all core
taken.
Not applicable.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
Not applicable.
For all sample types, the nature, quality and appropriateness of
the sample preparation technique.
Quality control procedures adopted for all subsampling stages
to maximise representivity of samples.
Samples were prepared by the laboratory via drying, crushing (where required) and pulverising ahead of analysis. The
competent person determines the preparation technique appropriate.
Standard laboratory procedures adopted for analysis of samples. No records of standards, blanks or field duplicates have
been identified in the historic data.
Measures taken to ensure that the sampling is representative of
the in-situ material collected, including for instance results for
field duplicate/second-half sampling.
No information available.
Whether sample sizes are appropriate to the grain size of the
material being sampled.
No information available.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is
considered partial or total.
The analysis methods used are deemed appropriate for the style of mineralisation and sampling being conducted.
Methods are considered total.
For geophysical tools, spectrometers, handheld XRF
instruments, etc., the parameters used in determining the
analysis including instrument make and model, reading times,
calibrations factors applied and their derivation, etc.
Not applicable.
Logging
Subsampling
techniques and
sample
preparation
Quality of assay
data and
laboratory tests
ASX:VKA | vikingmines.com
14
Criteria
Verification of
sampling and
assaying
Location of data
points
Data spacing and
distribution
Orientation of
data in relation to
geological
structure
JORC Code explanation
Nature of quality control procedures adopted (e.g. standards,
blanks, duplicates, external laboratory checks) and whether
acceptable levels of accuracy (i.e. lack of bias) and precision
have been established.
The verification of significant intersections by either
independent or alternative company personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data
verification, data storage (physical and electronic) protocols.
Discuss any adjustment to assay data.
Accuracy and quality of surveys used to locate drillholes (collar
and downhole surveys), trenches, mine workings and other
locations used in Mineral Resource estimation.
Specification of the grid system used.
Commentary
Standard laboratory procedures adopted for analysis of samples. No records of standards, blanks or field duplicates have
been identified in the historic data.
None additional verification completed.
Not applicable.
No information available. Data sourced from WAMEX (Western Australia data repository for historical data).
None undertaken.
Sample coordinates reported to have been collected using handheld GPS. Standard assumed accuracy is +/- 5m.
MGA94 Zone 51S
Quality and adequacy of topographic control.
Not applicable.
Data spacing for reporting of Exploration Results.
Soil samples were collected on regular grids on 100m x 200m and 100m x 50m spacing.
Rockchips were collected at variable sample
Whether the data spacing and distribution is sufficient to
establish the degree of geological and grade continuity
appropriate for the Mineral Resource and Ore Reserve
estimation procedure(s) and classifications applied.
Whether sample compositing has been applied.
Whether the orientation of sampling achieves unbiased
sampling of possible structures and the extent to which this is
known, considering the deposit type.
If the relationship between the drilling orientation and the
orientation of key mineralised structures is considered to have
introduced a sampling bias, this should be assessed and
reported if material.
Sample security
The measures taken to ensure sample security.
Audits or reviews
The results of any audits or reviews of sampling techniques and
data.
ASX:VKA | vikingmines.com
Not applicable, no resource being reported.
Not applicable.
Rock chip sampling is biased towards sampling of geological rock types of interest.
Soil sample lines were orientated across the strike of the known geological grain and interpreted zones of interest.
Not applicable.
It is not known what measures were taken to ensure sample security.
No audits have been undertaken.
15
JORC 2012 Table 1 Section 2 – Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Tenements and location
The First Hit Project tenements are located approximately 50 km due west of the town of Menzies,
Western Australia on the Menzies (05) 1:250,000 and Riverina 3038 1:100,000 topographic map sheets,
and include:
Mineral tenement
and land tenure
status
Type, reference name/number, location and ownership including agreements
or material issues with third parties such as joint ventures, partnerships,
overriding royalties, native title interests, historical sites, wilderness or national
park and environmental settings.
Tenement ID
E29/1133
E30/0529
P29/2652
M30/0091
M30/0099
P30/1137
P30/1144
E30/0517
E29/1131
E30/0570
E30/0571
E29/1169
Status
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
LIVE
Pending
Pending
Pending
Pending
Holder
Viking Mines Ltd
Viking Mines Ltd
Viking Mines Ltd
Red Dirt Mining Pty Ltd
Red Dirt Mining Pty Ltd
Red Dirt Mining Pty Ltd
Red Dirt Mining Pty Ltd
Baudin Resources
Viking Mines Ltd
Viking Mines Ltd
Viking Mines Ltd
Viking Mines Ltd
Viking Mines has an option with Baudin Resources (a wholly owned subsidiary of Encounter Resources )
to acquire 100% of the mineral rights over part of tenement E30/517.
Third Party Interests
The nickel rights to M30/99 & M30/91 are held by Riverina Resources Limited and Barra Resources
Limited.
Red Dirt Mining are not aware of any material 3rd party interests or royalties.
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area.
ASX:VKA | vikingmines.com
Native Title, Historical sites and Wilderness
Archaeological and ethnographic studies were undertaken for M30/99 prior to further development in
2001. These studies involved an examination of the existing ethnographic data base pertaining to the
mining area and an examination of known ethnographic site distribution. The studies concluded that it
was unlikely that the developments will impact any sites of Aboriginal significance. This information was
submitted to the Department of Aboriginal Affairs.
A recent search of the Department of Aboriginal Affairs (DAA) Heritage Inquiry System indicates there
are no registered Aboriginal Heritage Sites identified within any tenement covered under this MCP (DAA
2019).
The mining lease was granted prior to the Native Title Act being enforced.
The tenements are held in good standing by Red Dirt Mining Pty Ltd. (a wholly owned subsidiary of
Viking Mines Ltd) and Viking Mines Ltd. There are no known impediments to obtaining a licence in the
area.
16
Criteria
JORC Code explanation
Exploration done
by other parties
Acknowledgment and appraisal of exploration by other parties.
Geology
Deposit type, geological setting and style of mineralisation
ASX:VKA | vikingmines.com
Commentary
The Red Dirt tenements have been actively explored and mined since 1886 with the arrival of
prospecting parties during the initial Western Australia gold rush. Arthur and Tom Evans founded the
First Hit gold mine in 1938.
Tom and Arthur worked the mine until Tom sold his share to Riverina station owner Bill Skathorpe in late
1953. Arthur and Bill worked the mine until Bill's death in 1954. George Vujcich Senior bought the mine
from Arthur and Bill's estate in late 1955. George and then his son George operated the mine
intermittently over a 40-year period. Barminco purchased the First Hit tenement from George's daughter
in late 1996.
Regional exploration activities were undertaken by Western Mining Corporation (WMC) and
Consolidated Gold Operations prior to 1996 including geochemical sampling, lag sampling and auger
programs. The programs covered the various regolith features with a purpose of defining broad
geochemical anomalies.
From 1996 to 2002 exploration and development was undertaken by Barra Resources or Barminco.
Barminco Pty Ltd undertook geochemical soil geochemistry on the northern part of M30/99 between
1995 and 2000. Various combinations of multielement geochemistry were completed historically,
ranging from gold-only assays to 42 element geochemistry.
The following extract from the Barra Resources mine closure and production report provides an insight
to the exploration and discovery of the First Hit deposit:
“Barminco Pty Ltd acquired the First Hit tenement in August 1996, with the objective of exploring for and
developing moderate sized high grade gold deposits. Because of Barminco’s mining and exploration
activities at Two Boys, Karonie, Jenny Wren, Gordon Sirdar and Bacchus Gift mines the period between
August 1996 and June 2000 saw only intermittent work at First Hit. Twenty RC drill holes were completed
demonstrating the potential for high-grade underground resources.
The First Hit deposit was effectively discovered in June 2000 with drill hole BFH 025 which returned 3
zones of mineralisation including 5m @ 60 g/t, 7m @ 9.0 g/t and 2m @ 3.7 g/t”.
Barra Resources subsequently completed a 20 m x 25 m drill out to 240 m in depth, combined with a
detailed feasibility study, culminating in the commencement of mining operations in August 2001.
Barra Resources also completed RC drill programs at three prospects within the First Hit Project leases,
referred to as First Hit North, First Hit South and Clarkes Well. Minor gold mineralisation was intersected
in a small number of holes, but no further exploration was completed.
The leases have since been owned by several companies and private operators without much additional
exploration.
Regional Geology
The area of interest lies on the 1:100,000 Riverina geological sheet 3038 (Wyche, 1999). The Mt Ida
greenstone belt is a north-striking belt of predominantly metamorphosed (upper greenschistamphibolite facies) mafic and ultramafic rocks that form the western boundary of the Eastern Goldfields
geological terrane. The major structure in this belt is the Mt Ida Fault, a deep mantle tapping crustal
suture that trends N-S and dips to the east. It marks the western boundary of the Kalgoorlie Terrane
(~2.7 Ga) of the Eastern Goldfields Province against the Barlee Terrane (~3.0 Ga) of the Southern Cross
Province to the west. To the east the belt is bounded by the Ballard Fault, a continuation of the strike
extensive Zuleika Shear.
17
Criteria
JORC Code explanation
Commentary
The Mt Ida belt is widely mineralised, predominantly with discordant vein gold deposits. Associated
element anomalism typically includes copper and arsenic but neither have been identified in economic
concentrations. There is some nickel sulphide mineralisation associated with the komatiite component of
the supracrustal rocks and the area includes a locally significant beryl deposit sporadically mined