Linka Tungsten Project, USA
• Metallurgical optimisation testwork on primary Linka mineralisation produced a
premium 56.9% WO₃ concentrate at 76.0% recovery from a 1.2% WO₃ feed, a 1.27x
recovery increase over the May result and above the Company’s target, confirming a
simple, low-CAPEX gravity and flotation flowsheet.
• Linka fully permitted for drilling following US Bureau of Land Management approval
of the Notice of Intent, with a US-based contractor engaged for the maiden 63-hole, 48-
pad Reverse Circulation programme across three priority target areas.
• Second field mapping and sampling campaign identified two previously unrecognised
mineralised rock stockpiles identified adjacent to the historic Conquest mine, with
visual scheelite confirmed under UV light and Phase 1 Linka Main stockpile sampling
returning up to 1.1% WO₃ (41 samples averaging 0.4% WO₃).
• XRT ore sorting testwork by TOMRA successfully separated Linka mineralisation into
discrete product and waste streams, directing 67.8% of Conquest Pit sample mass and
56.1% of Linka Stockpile sample mass to product, with product assays expected in the
September quarter.
• Expanded ground geophysical programme confirmed gravity as an effective direct-
detection tool for scheelite at Linka and resolved several concealed targets beneath
volcanic cover at the Linka Southwest extension, de-risking the maiden drill programme
and significantly expanding the drill-target inventory.
• Conceptual process flow diagram finalised with Mineral Technologies, adopting a
modular design and a nominal 43 tonne-per-hour processing rate for evaluation of a
proposed ~300,000tpa operation.
Riverina East Project
• Binding agreements executed to divest the non-core First Hit Gold Project in Western
Australia to First Au Limited (ASX:FAU)1
for total consideration of up to $5.0 million,
sharpening Viking’s focus on the flagship Linka Tungsten Project.
• Viking retains exposure to future discovery through its FAU shareholding and
performance-linked consideration, while FAU assumes a minimum $500,000 drilling
commitment at no cost to Viking.
1
VKA ASX Announcement 29 June 2026 - Viking Divests Non-Core Gold Project for up to $5M
ASX:VKA | vikingmines.com 2
2
Corporate
• Viking’s ordinary shares qualified for trading on the US OTC Markets under the ticker
VKALF, giving North American investors real-time USD trading with no new shares issued
and the ASX (ASX:VKA) remaining the primary listing.
• Tungsten prices remained near record highs through the quarter, with APT (CIF
Rotterdam 88.5%) reported at approximately US$3,100 per MTU, underpinning the
strategic value of Viking’s US domestic supply positioning.
• Cash at 30 June 2026 was $3.67M (plus $1.2M cash component from sale of First Hit
due in the September quarter – bringing total to $4.87M).
Viking Mines Limited (ASX:VKA) (OTCID:VKALF) (“Viking” or “the Company”) is pleased to
present its quarterly activities report for the period ended 30 June 2026 (“June quarter”).
In December 2025, Viking entered into a binding Terms Sheet to acquire six tungsten
Projects located in the Tier-1 mining jurisdiction of Nevada, USA, representing a
transformational development for the Company2
. During the quarter, activities focused on
advancing the flagship Linka Project toward its maiden drilling campaign, progressing
metallurgical and processing studies, and securing full drill permitting, under a “fast to market”
strategy.
The USA Tungsten portfolio’s strategic value is underpinned by geopolitical urgency: China
controls ~85% of tungsten supply and export quotas continue to tighten. Tungsten prices have
extended their 2025 rally, remaining near record highs of approximately US$3,100 per MTU
(metric tonne unit = 10kg) of APT (Ammonium Paratungstate)3
.
Commenting on the quarterly activities, Viking Mines Managing Director & CEO Julian
Woodcock said:
“The June quarter has been about execution. We have moved Linka from a well-understood
historical dataset to a fully permitted, contracted and drill-ready project, and we are now on the
cusp of the first drilling at Linka in more than 40 years.
“Our metallurgical programme continued to deliver, with testwork producing a premium,
saleable 56.9% WO₃ concentrate at 76% recovery, exceeding our target and reinforcing the
case for a simple, low-CAPEX gravity and flotation flowsheet. Alongside this, our conceptual
processing study with Mineral Technologies and encouraging initial ore sorting results from
TOMRA are building a clear, capital-efficient development pathway.
“Our field teams also delivered a strategically significant outcome, identifying two previously
unrecognised rock stockpiles at Conquest which contain mineralised material, and confirming
grades of up to 1.1% WO₃ from the Linka Main stockpile. This is material sitting at surface that
could provide a near-term, lower-cost feed source as the Project advances.
“We also sharpened our focus during the quarter, divesting the non-core First Hit Gold Project
for consideration of up to $5.0 million while retaining exposure to its upside. This allows us to
2
VKA ASX Announcement 16 December 2025 – VKA to acquire production proven USA Tungsten Projects
3
Source: Shanghai Metals Markets, June 2026 https://www.metal.com/tungsten - CIF Rotterdam 88.5% APT US$/mtu (metric
tonne unit – 10kg)
ASX:VKA | vikingmines.com 3
3
direct our full technical and financial capacity to Linka at exactly the right moment in the
tungsten market. Complementing this US focus, we also broadened our reach to North
American investors, with Viking’s shares now trading on the OTC Markets in the United States
under the ticker VKALF.
“With permitting complete, our contractor engaged and the rig mobilised, Viking is entering a
sustained period of news flow. I look forward to updating the market as we commence maiden
drilling and continue to advance Linka toward development.”
NEVADA, USA
LINKA TUNGSTEN PROJECT
In December 2025, Viking entered into a binding Terms Sheet with USA based BLK Group LLC
to acquire six tungsten Projects - Linka, Alpine, Long, Terrell, Ragged and Victory - all located
within the Tier-1 mining jurisdiction of Nevada, USA. Four of the Projects have had ore mined
via both open pit and underground operations throughout the 20th century for a total
production of ~123,000t at 0.54% WO₃.
The flagship Linka Project is a past-producing tungsten system with mineralisation extracted
from three historical mines over ~820m of strike length, since expanded to a ~1.6km target
horizon through the Company’s historical data integration. During the June quarter, Viking
transitioned Linka from technical evaluation to a fully permitted, drill-ready project, while
advancing metallurgical, processing and stockpile workstreams in parallel under its "fast to
market" strategy.
METALLURGICAL TESTWORK
During the reporting period, Viking continued to advance metallurgical testwork on the
primary Linka mineralisation, building on the gravity separation and flotation results achieved
earlier in the year. The programme is designed to define a simple, low-CAPEX flowsheet
capable of producing a premium, saleable tungsten concentrate.
Optimisation testwork on a 10kg sample from the Linka Pit delivered a combined gravity and
cleaner flotation circuit concentrate grading 56.9% WO₃ at 76.0% recovery from a 1.2% WO₃
feed grade4
. This result represents a 1.27x step-change improvement in recovery from the
62.5% WO₃ concentrate at 59.8% recovery reported in May5
, and exceeds the Company’s
target of greater than 70% recovery at a concentrate grade above 50% WO₃. The final
concentrate was attained by combining a standalone gravity concentrate grading 66.6% WO₃
at 42.16% recovery with a flotation concentrate grading 48.2% WO₃ at 33.89% recovery from
the gravity tails.
The testwork confirms the amenability of Linka mineralisation to a conventional gravity and
flotation flowsheet and provides a strong foundation for ongoing optimisation and variability
testing across additional bulk samples. Flotation reagent optimisation is continuing on the
gravity tails, with the objective of further lifting flotation recovery toward a revised target of
greater than 80% recovery while holding the combined concentrate grade above the 50% WO₃
saleable threshold. The Company notes that the broader metallurgical programme has
4
VKA ASX Announcement 10 June 2026 - Linka Tungsten Project Recovery Improved to 76.0% at 56.9% WO₃ Grade
5
VKA ASX Announcement 28 May 2026 - Linka Metallurgy Success Delivers 62.5% WO₃ at 59.8% Recovery
ASX:VKA | vikingmines.com 4
4
experienced some scheduling delays due to increased global demand for tungsten testwork
in the current commodity price environment.
MAIDEN DRILLING - PERMITTING AND CONTRACTOR
During the quarter, Viking completed the final regulatory and operational milestones required
to commence its maiden drilling campaign at Linka, the first known sub-surface exploration at
the Project in more than 40 years.
Federal Permitting
Viking lodged a Notice of Intent (NOI) with the US Federal Bureau of Land Management (BLM)
for its planned 63-hole maiden drilling programme. BLM approval was subsequently received
ahead of the Company’s internal timeline, clearing the final federal regulatory hurdle and
rendering the Linka Project fully permitted for drilling6
. The approval was secured ahead of the
December 2026 REEShore Act mandate, which prohibits Chinese-origin tungsten in US
Department of Defense supply chains.
Drilling Contractor
Following the receipt of BLM approval, Viking executed a drilling services contract with an
established US-based contractor for the maiden Reverse Circulation (RC) drilling programme,
representing the final operational milestone ahead of mobilisation. The maiden drilling phase
is anticipated to take approximately six weeks from commencement, subject to ground
conditions, productivity and weather. Subsequent to the end of the quarter, the drill rig has
mobilised to site and drilling is anticipated to commence shortly.
Programme Overview
The approved campaign comprises 63 holes from 48 drill pads across three priority target
objectives:
• Linka Main (36 holes): resource-focused testing to verify high-grade historical intercepts,
including DH-04 (9.8m @ 0.5% WO₃), LR-11 (7.9m @ 0.9% WO₃) and channel sample 8.5m
@ 1.0% WO₃, and to target down-dip continuity beneath historical workings.
• Linka SW Extension (16 holes): maiden testing across four sections at 125-150m spacing
of the prospective ~800m southwest extension, where surface sampling has returned
grades up to 0.6% WO₃.
• Regional Reconnaissance (11 holes): shallow vertical holes to validate magnetic and
gravity geophysical interpretations and define contact positions prospective for new
mineralised zones across the broader Linka intrusive complex.
6
VKA ASX Announcement 26 May 2026 - Viking Locks in Driller for Linka Tungsten Maiden Campaign
ASX:VKA | vikingmines.com 5
5
Figure 1: Map showing the Linka Project and planned drillhole locations across the three target objectives with
magnetic geophysics background image.
FIELD MAPPING, SAMPLING AND STOCKPILES
Viking completed its second field mapping and sampling campaign at the Linka Tungsten
Project, concentrating on the Linka (Main), Conquest and Hillside historic mining areas. A total
of 98 samples were collected across the campaign for WO₃ content, geochemical analysis and
specific gravity measurements, structured around trench resampling, rock stockpile
investigations, outcrop sampling and geological mapping.
Historical Tailings Dam and Stockpile Evaluation
Ahead of the second field campaign, Viking mobilised a field team to the Linka Project to
evaluate the historical tailings dam and ore stockpiles, targeting near "zero-mining-cost"
surface material as a potential low-cost supplemental feed source for a future modular
ASX:VKA | vikingmines.com 6
6
processing plant. The historical tailings dam was grid-sampled, with approximately 52 samples
collected to determine both WO₃ grade and tailings thickness.7
Sampling of the historical ore stockpiles was undertaken to confirm grade consistency,
building on an earlier composite result from sample LKMET0001 (a 97.4kg composite) that
returned 0.8% WO₃. In parallel, additional metallurgical samples were collected for a suite of
comminution tests (Crushing Work Index, Abrasion Index, SMC and Bond rod and ball mill
work indices) to define energy requirements and support the operating cost profile feeding
into the conceptual processing study.
Conquest Rock Stockpile Discovery
The standout outcome of the campaign was the identification of visual mineralisation,
confirmed under ultraviolet light, within two previously unrecognised historical rock stockpiles
located adjacent to the historic Conquest mine. The stockpiles contain mineralised material
mixed with waste rock, a profile that is potentially well suited to ore sorting. Subject to assay
confirmation, the Conquest stockpiles represent a potential source of additional surface-
accessible feed should the Project advance to development, with material already at surface
and not requiring drilling, blasting or mining.
Linka Main Stockpile Sampling Results
Phase 1 sampling of the historical Linka Main stockpile returned assays of up to 1.1% WO₃, with
41 samples averaging 0.4% WO₃, increasing to 0.5% WO₃ above a 0.1% WO₃ cut-off. These
results are comparable with the Project’s historically reported average mined grade of ~0.5%
WO₃ and confirm that the stockpile is mineralised, supporting the Company’s strategy of
advancing historical stockpile material toward the production of an offtake-grade concentrate
sample. Individual sample assays ranged from 0.05% to 1.13% WO₃, and specific gravity tests
on three stockpile samples returned results of 3.40, 2.66 and 2.71, which are being evaluated
to support stockpile density and tonnage estimation. The result supports a two-track strategy
of advancing historical surface stockpile material toward an offtake-grade concentrate sample
in parallel with the permitted maiden drill programme testing resource potential.8
Trench Sampling & Geological Mapping
Six historical trenches were also mapped and resampled, with visual mineralisation observed
under ultraviolet light in each. Mapping across the broader claim package confirmed the
presence of alluvial cover and unmineralised tuff to the west of the outcropping Linka
Mineralised Trend, validating the scout drilling approach adopted for the maiden drilling
campaign.
7
VKA ASX Announcement 14 April 2026 - Stockpile and Tailings Evaluation Underway at Linka Tungsten Project
8
VKA ASX Announcement 9 June 2026 - Linka Stockpile Sampling Delivers Up To 1.1% WO₃
ASX:VKA | vikingmines.com 7
7
Figure 2: Map showing the location and grade of samples collected across the Linka stockpile. Note repeated high-
grade samples occurring throughout up to 1.1% WO3.
Figure 3: Photo showing high grade samples collected from the Linka stockpile. Grade annotated on the image.
Refer to Figure 2 for location and data tables for sample coordinates.
ASX:VKA | vikingmines.com 8
8
ORE SORTING TESTWORK
Viking reported positive initial results from X-ray Transmission (XRT) ore sorting testwork
completed by TOMRA at its Test Center in Wedel, Germany.9
The testwork was undertaken on
two ~20kg samples, one from the Conquest Pit and one from the Linka Stockpile, each crushed
and screened to +10mm to 40mm to assess the amenability of Linka mineralisation to sensor-
based pre-concentration.
XRT sorting discriminates material on the basis of atomic density and is well suited to detecting
dense tungsten-bearing minerals such as scheelite. Each sample was processed through a
three-stage cascade sorting configuration, incorporating TOMRA’s newly released CONTAIN
deep-learning inclusion-detection software alongside the established OBTAIN detection
technology, producing four output streams: High Grade Inclusions, Low Grade Inclusions,
CONTAIN Inclusions and Waste.
The testwork successfully separated mineralised feed into discrete product and waste streams.
For the Conquest Pit sample, 67.8% of feed mass reported to the three product streams, with
visible scheelite confirmed in the high-grade product fraction under ultraviolet light. For the
Linka Stockpile sample, 56.1% of feed mass reported to product streams. TOMRA does not
assay sorted fractions in order to retain independence; the fractions have been returned to the
Company’s metallurgical laboratory in Canada for analysis, with product fraction assays
expected in the second half of July 2026.
If confirmed by the pending assays, ore sorting could provide two distinct sources of value:
pre-concentration of run-of-mine feed to lift plant feed grade, and upgrading of the Company’s
existing surface stockpiles. These results will be integrated into the conceptual processing
flowsheet being developed by Mineral Technologies for the ~300ktpa processing model.
In parallel with the TOMRA ore sorting programme, Sepro Mineral Systems evaluated the
recovery of fine scheelite using Falcon centrifugal gravity concentrators, assessing an
additional recovery pathway for material that reports to the finer size fractions. The outcomes
of both the sensor-based sorting and fine-gravity testwork are being considered within the
modular flowsheet under development with Mineral Technologies.10
9
VKA ASX Announcement 18 June 2026 - Ore Sorting Success at Linka Tungsten Project
10
VKA ASX Announcement 2 April 2026 - Viking Mines Accelerated Workflow for Linka Tungsten Project
ASX:VKA | vikingmines.com 9
9
Figure 4: High-grade sorted fraction (Set 1) from the Conquest Pit sample under ultraviolet light, showing
characteristic blue-white fluorescence of scheelite. Visual estimate containing between ~1.5% to ~3.5% scheelite
(~1.2% to ~2.8% WO3). Refer to Appendix 1. Assay results expected late July 2026.
Cautionary Statement: Visual estimates of mineral presence should never be considered a proxy or substitute for laboratory
analyses where concentrations or grades are the factor of principal economic interest. Visual estimates also potentially provide no
information regarding impurities or deleterious physical properties relevant to valuations.
GEOPHYSICS AND TARGETING
In the March quarter, Viking completed and interpreted an expanded ground geophysical
programme at the Linka Project designed to extend the Company’s understanding beyond
known surface mineralisation and to identify subsurface targets beneath younger volcanic
cover. The programme deployed three complementary methods: a 1.2km² ground gravity
survey, a 5.9km² ground magnetic survey, and a four-line Gradient Array Induced Polarisation
(GAIP) trial over the Conquest target.11
The processed and interpreted gravity dataset resolved a series of high gravity anomalies that
correlate with known mineralisation at the Linka Main, Hillside and Conquest historic mines,
where the high density of tungsten-bearing skarn contrasts with the lower-density host rocks.
This correlation confirms ground gravity as an effective direct-detection tool for scheelite
mineralisation at Linka. The ground magnetic survey defined the interpreted limits of the
intrusive system and its contact with the sedimentary host rocks, the setting in which skarn
mineralisation typically forms.
Importantly, the survey resolved several gravity highs beneath volcanic cover at the Linka
Southwest extension, de-risking the maiden drill programme and providing compelling
concealed targets. Numerous additional anomalies identified across the tenure have
significantly expanded the drill-target inventory, and are being ranked and prioritised
alongside geological mapping and historical data for future drill testing.
11
VKA ASX Announcement 9 April 2026 - Viking’s Gravity Survey at Linka De-risks Drilling & Identifies New Targets
ASX:VKA | vikingmines.com 10
10
Figure 5: Terrain-corrected Bouguer anomaly gravity image with Linka Main, Hillside and Conquest historic mines
annotated and coincident with gravity highs.
CONCEPTUAL PROCESSING STUDY
Viking progressed the conceptual processing study for the Linka Tungsten Project with Mineral
Technologies, a subsidiary of the Downer Group and an international leader in gravity
separation and mineral processing. During the quarter, Mineral Technologies finalised a
ASX:VKA | vikingmines.com 11
11
conceptual process flow diagram that incorporates the Company’s baseline metallurgical
findings to date12
.
The flowsheet is built around a modular design that enables the future integration of advanced
recovery stages, such as Wet High-Intensity Magnetic Separation (WHIMS) or a Falcon
concentrator, without requiring a fundamental redesign of the primary circuit. A nominal
processing rate of approximately 43 tonnes per hour was adopted for conceptual evaluation
purposes, feeding into a proposed ~300,000 tonne-per-annum (300ktpa) processing model.
This processing rate is used solely to support technical assessment of the flowsheet and does
not represent a production target or forecast.
The study marks a shift in focus from laboratory validation toward mechanical engineering,
equipment sizing and preliminary, order-of-magnitude capital and operating cost
considerations. Comminution testwork has been initiated to support preliminary power and
water requirement inputs, and the Company is assessing "Purchase versus Hire" procurement
strategies for specific modules to minimise upfront capital expenditure and reduce
development lead times.
Figure 6: Block flow diagram illustrating the conceptual flowsheet design for the Linka Project conceptual
processing study. Source: Mineral Technologies.
12
VKA ASX Announcement 27 April 2026 - Conceptual Process Established for Linka Tungsten Project
ASX:VKA | vikingmines.com 12
12
WESTERN AUSTRALIA
FIRST HIT PROJECT
Divestment of the First Hit Gold Project
On 29 June 2026 Viking entered into binding agreements to divest 12 tenements
encompassing its non-core First Hit Gold Project in the Eastern Goldfields of Western Australia
to First Au Limited (ASX:FAU). The divestment crystallises value from a non-core asset and
allows Viking to direct its capital and technical resources toward its flagship Linka Tungsten
Project.
Total consideration is up to $5.0 million, comprising upfront consideration of $2.2 million ($1.2
million in cash and $1.0 million in FAU shares) and up to a further $2.8 million in FAU
performance rights, payable progressively as FAU achieves defined drilling and Mineral
Resource milestones on the tenure. Viking retains exposure to future discovery through its
shareholding in FAU and the performance-linked consideration, while FAU assumes a
minimum $500,000 drilling commitment on the transaction tenements within 12 months of
completion, funding ongoing gold exploration at no cost to Viking. Completion remains
subject to customary conditions and is expected to occur in the coming weeks.
Riverina East Project
Following the binding agreements to divest the First Hit Gold Project, the Riverina East Project
tenements are subject to transfer to First Au Limited on completion of the transaction. No
material exploration activities were undertaken on the project during the period.
CANEGRASS
Canegrass Battery Minerals Project
No material activities were undertaken on the Canegrass Battery Minerals Project during the
period. The project continues to host a substantial vanadium-rich mineral resource in the
Murchison region of Western Australia.
CORPORATE
US OTC Markets listing
During the quarter, Viking’s ordinary shares were qualified for trading on the US OTC Markets
under the ticker symbol VKALF, providing North American investors with real-time trading in
US dollars during US market hours. No new shares were issued in connection with the listing,
and the Company’s primary listing remains on the Australian Securities Exchange (ASX: VKA),
with its ASX reporting obligations satisfying the requirements of the US trading presence. The
listing is intended to broaden the Company’s shareholder base and improve liquidity as it
advances the Linka Tungsten Project in Nevada.13
Strategic US positioning
The Company also continued to progress its application for membership of the US Defense
Industrial Base Consortium (DIBC), which US government agencies use to access industry
13
VKA ASX Announcement 13 April 2026 - Viking Mines Commences Trading on US OTC Markets - Ticker VKALF
ASX:VKA | vikingmines.com 13
13
sources for critical minerals, and continued to establish State and Federal contacts to position
Linka as a future domestic source of tungsten for the US defence supply chain. Upon successful
completion of the application process, the Company will evaluate opportunities to partake in
US government programmes.
Board Changes
Mr Bevan Tarratt resigned as a Non-Executive Director, effective 31 March 2026, due to
expanded external executive and non-executive commitments.
FINANCIAL POSITION
The Company has a strong cash position of $3.67M as of 30 June 2026. This balance does
not include the $1.2M cash component due to be received from the sale of the First Hit Gold
Project which will be received in the September quarter.
Income for the period totalled $168k, resulting from $68k R&D tax refund and GST returns,
$44k from investing activities (bank interest), 25k from share issue for payment of Investor Hub
and $31k from other income.
The Company’s cash position realised a net decrease of $1.01M (after expenses) over the
March 2026 quarter Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $140k in the quarter ending 30 June 2026. This amount comprised
Director fees for the relevant period.
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure for the quarter predominantly related to:
• $670k: Exploration expenditure on the Company’s Projects, primarily relating to
costs associated with the Nevada Tungsten Projects.
• $271k: General corporate and administration costs, including ASX listing fees and
annual software costs.
• $222k: Director fees and staff costs.
• $44k gain was made due to bank interest.
Other than as set out in this report, the Company undertook no other substantive exploration,
mining production and development activities during the quarter.
SEPTEMBER QUARTER PLANNED ACTIVITIES
Viking will maintain its focus on advancing the Linka Tungsten Project, with planned activities
including:
• Commencement of the maiden 63-hole RC drilling campaign, with rig mobilisation and
pre-drilling earthworks, followed by drilling and the release of visual and assay results as
received.
• Continued metallurgical optimisation and variability testwork on the primary
mineralisation.
ASX:VKA | vikingmines.com 14
14
• Receipt of product fraction assays from the TOMRA ore sorting testwork.
• Receipt of assay results from the second field campaign, including trench sampling and
Conquest stockpile sampling.
• Reporting of the Mineral Technologies conceptual processing study outcomes and
evaluation of next steps.
• Completion of the First Hit Gold Project divestment to First Au Limited.
CORPORATE OPPORTUNITIES
The Company continues to review and conduct due diligence on a range of mineral acquisition
opportunities to complement its existing project portfolio, with the objective of acquiring
mature exploration assets with the potential to deliver long-term shareholder returns. Should
any of these acquisition opportunities progress, the Company will provide an update to the
market.
-END-
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
contact@vikingmines.com
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a Member
and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines
Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to
the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the disclosure of the information in this report in the
form and context in which it appears.
Competent Persons Statement – Metallurgical Testwork
The information in this announcement that relates to Exploration Results from metallurgical test work is based on, and fairly represents,
information and supporting documentation compiled by Mr Peter Adamini, BSc (Mineral Science and Chemistry), who is a Member of The
Australasian Institute of Mining and Metallurgy (AusIMM). Mr Adamini is a full-time employee of SGS Australia owned Independent
Metallurgical Operations Pty Ltd, a wholly owned subsidiary of SGS Australia Holdings Pty Ltd, and has sufficient experience that is relevant
to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person
as defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr.
Adamini is an independent consultant engaged by Viking Mines Limited for metallurgical representation. Mr Adamini consents to the
disclosure of
Share your feedback