Further results from the Northern Duplex Target have confirmed the presence of a
steeply dipping gold zone, interpreted to extend to surface.
•
Drilling has returned a broad downhole intercept in VKRC0068 containing multiple
+1g/t Au intercepts featuring;
•
17m at 1.1g/t Au from 28m including;
• 1m at 1.6g/t Au from 28m; and
• 2m at 3.1g/t Au from 34m; and
• 3m at 1.3g/t Au from 38m
•
Assays remain outstanding for 3 additional wide spaced drill traverses, located 0.8km
North, 1.7km South and 2.8km South of VKRC0068 respectively.
•
Targeted close spaced shallow infill auger sampling programme (20m x 100m grid) over
the Northern Duplex Target commencing shortly to define the extent of the target area
and guide planning of next bedrock drill testing.
•
Phase 2 drill programme to commence in early March at the separate 6km long
geochemical anomaly over the Central Duplex Target, with follow up at the Northern
Duplex Target to be incorporated once remaining assays received.
•
Viking has only drill tested a 3.6km strike length of the larger, previously undrilled,
~23km strike length of the prolific Zuleika Shear and within the same stratigraphic
horizon as the >1.2Moz Davyhurst Camp 40km to the south.
Viking Mines Limited (ASX: VKA) ("Viking" or "the Company") is pleased to announce further
assay results from the recently completed Phase 1 drilling programme.
Assays have been received for a scissor hole completed at the end of the Phase 1 drill programme
completed at the Northern Duplex Target (Figure 1, Figure 2 & Figure 3). These results confirm
the discovery of a steeply dipping gold zone first intercepted in VKRC0083.1 VKRC0068 has
returned 17m at 1.1g/t Au from 28m, with multiple individual intercepts up to 3.1g/t Au.
These results are from the first of four wide spaced drill traverses completed over the target area
with the assays pending for the remaining three drill traverses (Figure 3). Prior to the Company’s
Phase 1 RC drilling there has been no bedrock drill testing on Viking’s 100% controlled tenure for
more than 20km to the South and 3km to the North.
Viking Mines Managing Director & CEO Julian Woodcock said:
“I am extremely excited by the results received which confirm the presence of a steeply dipping
gold zone at the Northern Duplex Target.
“This zone correlates with the results seen in the previously reported intercept in hole VKRC0083
and confirm we have discovered a new zone of gold mineralisation in this greenfields target area
which has seen no prior bedrock drill testing.
1
ASX Announcement 3 February 2025 – Viking Discovers Gold at Northern Duplex Greenfields Target
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
“I can’t emphasise enough the scale of the area we are drill testing and the opportunity for
discovery of a substantial gold deposit. The Riverina gold mine owned by Ora Banda Mining
(ASX:OBM) is located only 10km to the SW and has a surface strike extent of ~900m. There is ample
space between our drilling to host multiple deposits of this size.
“The tenor of these results is analogous to those that are commonly seen proximal to substantial
gold deposits and means we have the opportunity to follow the pathway to a higher-grade zone.
“We are focussed on delineating the extents of the target with further field work and follow up drill
testing to establish if we have a new gold deposit by the tail.
“I look forward to providing further updates to market as we receive the results from the remaining
three drill traverses.”
PHASE 1 DRILLING RESULTS – NORTHERN DUPLEX TARGET
Assay results have been received for VKRC0068, a scissor hole drilled at the Northern Duplex
Target on the first drill traverse, following up on the previously reported intercept for hole
VKRC0083 of 27m at 0.4g/t Au (>0.1g/t cut-off) from 69m.1 This hole was planned late in the
programme based on visual alteration identified in VKRC0083 and designed to test the
orientation and continuity of the observed zone.
VKRC0068 returned a significant intercept of 17m at 1.1g/t Au from 28m containing multiple
+1g/t Au intercepts including (Figure 1 & Figure 2);
•
1m at 1.6g/t Au from 28m;
•
2m at 3.1g/t Au from 34m; and
•
3m at 1.3g/t Au from 38m.
This drillhole confirms the presence of a steep dipping gold hosting structure which is open along
strike with no constraining drillholes. The true extent of the zone cannot be determined, with the
next drill traverses located 0.8km North and 1.7km South and assays still pending (Figure 3).
Figure 1; Cross section through drill traverse 1 at the Northern Duplex Target.
ASX:VKA | vikingmines.com
2
Figure 2; Chip samples from VKRC0068 and analysis results reported as g/t gold. 17m at 1.1g/t Au from 28m with higher
grade intercepts up to 3.2g/t as annotated.
PHASE 1 DRILL PROGRAMME STATUS
The Phase 1 programme totalled ~55 holes for ~7,400m. Results have been received and QAQC
completed for 25 holes representing 2,880m of the programme, with 61% still outstanding. All
assays are anticipated to be received by late February/early March 2025.
The primary objective of this drill programme is to identify gold bearing pathways along any of
the multiple structural positions interpreted from the airborne magnetics. This objective has
been successfully achieved with the results from the first drill traverse, providing a priority target
for follow up exploration.
The Company cannot emphasise enough the scale of the Northern Duplex Target area being
tested (>3.6km) and the significance of the success of encountering gold in the first drill traverse
across this substantial and prospective greenfields target area (Figure 3 & Figure 4).
PHASE 2 DRILL PROGRAMME
Viking has commenced final planning and logistics to commence with the Phase 2 drill
programme in early March. This programme will initially commence on the Central Duplex Target
(Figure 3) which is defined by complex structures observed in the magnetic geophysics and
combined with a large >6km >10ppb near surface gold in auger anomaly and other pathfinder
geochemistry including Arsenic, Antimony, Bismuth and Tellurium. Additional holes are planned
for the Northern Duplex Target once all assays have been received.
ASX:VKA | vikingmines.com
3
Figure 3; Map showing the 4 completed drill traverses at the Northern Duplex Target and the location of VKRC0083 returning
27m at 0.4g/t Au and VKRC0068 with including 1m intercepts up to 2.9g/t Au and VKRC0069 returning 17m at 1.1g/t Au from
28m with intercepts up to 3.1g/t Au. Note, assays have only been received for 1 of the 4 drill traverses completed.
ASX:VKA | vikingmines.com
4
Figure 4; Map showing the 25km strike length of the Zuleika Shear controlled by Viking, the location of known gold
deposits, and the structurally complex geological targets being tested for gold mineralisation. Background image is 1VDPRTP magnetics.
ASX:VKA | vikingmines.com
5
ADDITIONAL EXPLORATION ACTIVITIES
The Company is commencing with an infill auger drilling programme to reduce the sample
spacing from the broad 100m x 400m grid to a 20m x 100m grid. The purpose of this infill auger
sampling is to better define the target anomalies to allow targeted drill testing to take place. This
approach will ensure the company focusses on the highest tenor anomalies with the highest
chance of success.
In addition to an infill auger drilling programme the Company is also obtaining quotes for a highresolution magnetic geophysics survey to better resolve the structures which form the focus of
our targeting.
FIRST HIT TARGETS
Assay results have been received for the holes drilled at the 3 targets tested close to the highgrade First Hit mine. Holes were drilled at Jana’s Reward, First Hit North and First hit South.
No significant assays were returned in this drilling.
NEXT STEPS
The Company continues to advance exploration activities with the objective of the discovery of
new gold deposits on the highly prospective tenement package at the First Hit Project. The
following next activities are underway;
•
Receipt of assays and interpretation of results from the remaining three drill traverses
completed at the Northern Duplex target as part of the Phase 1 drill programme. It is
anticipated results will be received in late February/early March 2025.
•
Commencement of first pass drill testing of the Central Duplex Target in early March 2025 and
potential follow up drilling at the Northern Duplex Target once remaining Phase 1 drill
programme assay results have been received and interpreted.
•
Infill auger drilling to a 20m x 100m grid (currently 100m x 400m grid) over the target area
identified from the results in the first drill traverse from the Phase 1 drill programme to provide
a focussed target area for follow up drilling.
•
Completion of high-resolution magnetic geophysics to assist targeting and structural
interpretation to provide focus areas for follow up drilling over this large expansive target
area.
We look forward to providing updates to the market as advancements are made with the Project.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
ASX:VKA | vikingmines.com
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
6
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration program and other statements that are not historical facts. When used
in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar
expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is
a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time
employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
ASX:VKA | vikingmines.com
7
FIRST HIT PROJECT, WESTERN AUSTRALIA
The First Hit Project is centred around the historic high-grade First Hit gold mine situated along
the prospective Ida and Zuleika Shear zones in the Eastern Goldfields of Western Australia. The
Project incorporates 479.9km2 of tenements with 7 active Mining and Prospecting licences, 5
Exploration licences, and 3 Exploration licences under application. At the core of this landholding
is a 6.4km2 group of contiguous tenements that host the historic First Hit Gold Mine.
Prior to closure of the First Hit Gold Mine by Barra Resources in 2002 and at a time of depressed
gold prices of US$320/oz, the First Hit mine produced ~30k ounces of gold at an average grade
of ~7.7g/t Au. The Company is focused on delivering exploration programmes to test near mine
extensions and regional targets around the First Hit Project with the objective of defining fertile
structures and discovering gold ounces.
The Project area is well serviced by infrastructure and is located 50km west of the sealed
Goldfields highway and the township of Menzies. The nearest operating Gold Processing Plant is
the Davyhurst Mill 40km to the south, owned and operated by Ora Banda Mining (ASX:OBM). The
nearest operating gold mine is the Riverina underground operations, located 8km south of the
First Hit gold mine, owned by OBM.
*See Appendix 1 for data source references
ASX:VKA | vikingmines.com
8
APPENDIX 1 – DATA SOURCES FOR MINERAL RESOURCE ESTIMATES AND MINE
PRODUCTION REFERENCED.
Riverina-Mulline Camp
Historical production: 305koz Au5
Measured, Indicated & Inferred Mineral Resource: 854koz Au6
OBM Production (FY21-23): 170koz Au7,8,9
TOTAL: 1,333koz
Central Davyhurst Camp
Historical production: 811koz Au1
2024 Indicated & Inferred Mineral Resource: 396koz Au2
TOTAL: 1,207koz Au
Bullant
Historic Production: 354koz Au3
Measured, Indicated & Inferred Mineral Resource: 462koz Au4
TOTAL: 816koz
Kundana Camp
Historic Production to June 2020: 2.75Moz Au10
FY21 to FY24 Production: 291,853oz Au11,12,13,14
Current Ore Reserves: 464koz Au15
Frogs Leg Mineral Resources: 770koz Au16
TOTAL 4.28Moz
Mt Ida
Historical production: 290koz Au19
2024 Indicated & Inferred Mineral Resource: 752koz Au20
TOTAL: 1,042koz Au
Bottle Creek
Historic Production: 90koz Au17
Alt Resources Quarterly Report 30 June 2020 - JORC Resource & Reserve Table: 370koz Au17
TOTAL 460koz
Map Source References
1) https://orabandamining.com.au/projects/davyhurst/
2) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
3) https://www.miningnews.net/precious-metals/news/1233885/bullant-gold-packs-bite
4) https://nortongoldfields.com.au/bullant/
5) https://orabandamining.com.au/projects/davyhurst/
6) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
7) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2021/?wpdmdl=7200&refresh=6736e1d72a3a51731650007
8) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2022/?wpdmdl=8803&refresh=6736e1d71beab1731650007
9) https://orabandamining.com.au/download/annual-report-2023/?wpdmdl=11152&refresh=6736e1d703e691731650007
10) https://randmining.com.au/projects/east-kundana-joint-venture/
11) https://app.sharelinktechnologies.com/announcement/asx/44dffa9bc8eaaa574af7cfda9564c595
12) https://app.sharelinktechnologies.com/announcement/asx/690381347ddb79dc8261b0f775636da7
13) https://app.sharelinktechnologies.com/announcement/asx/b13d0741e08843fb98f0e8c8be20eaaa
14) https://app.sharelinktechnologies.com/announcement/asx/00592059cc0f5c205e3eb6cfa25f3e4d
15) https://evolutionmining.com.au/storage/2024/02/2680687-Annual-Mineral-Resources-and-Ore-Reserves-Statement.pdf
16) https://evolutionmining.com.au/storage/2015/08/01647903.pdf
17) https://www.asx.com.au/asxpdf/20171108/pdf/43p1pnwsv6kd3g.pdf
18) https://www.asx.com.au/asxpdf/20200814/pdf/44lj6rj9wqk8r0.pdf
19) https://en.wikipedia.org/wiki/Mount_Ida_Gold_Mine
20) https://deltalithium.com.au/our-projects/mt-ida-lithium-gold/
ASX:VKA | vikingmines.com
9
APPENDIX 2 –ASSAY RESULTS TABLE
Hole ID
Hole Type
East (m)
MGA94
Zone 51
North (m)
MGA94
Zone 51
RL
End of
Hole (m)
Azi (°)
Dip (°)
Depth
From (m)
VKRC0068
RC
268711
6718179
471
120
090
- 75
0
4
4
8
8
ASX:VKA | vikingmines.com
Depth To
Length (m)
(m)
Au ppb
Au g/t
4
-5
- 0.01
4
24
0.02
12
4
15
0.02
12
16
4
-5
- 0.01
- 0.01
16
20
4
-5
20
24
4
24
0.02
24
28
4
-5
- 0.01
28
29
1
1567
1.57
29
30
1
840
0.84
30
31
1
266
0.27
31
32
1
372
0.37
32
33
1
799
0.80
33
34
1
130
0.13
34
35
1
3174
3.17
35
36
1
2990
2.99
36
37
1
337
0.34
37
38
1
163
0.16
38
39
1
1644
1.64
39
40
1
209
0.21
40
41
1
1985
1.99
41
45
4
844
0.84
45
49
4
23
0.02
49
50
1
18
0.02
50
51
1
22
0.02
51
52
1
5
0.01
52
53
1
-5
- 0.01
53
54
1
38
0.04
54
55
1
-5
- 0.01
55
56
1
110
0.11
56
57
1
94
0.09
57
58
1
20
0.02
58
59
1
445
0.45
59
60
1
840
0.84
60
61
1
258
0.26
61
62
1
60
0.06
62
63
1
99
0.10
63
64
1
89
0.09
64
65
1
59
0.06
65
69
4
20
0.02
69
73
4
12
0.01
73
77
4
-5
- 0.01
77
81
4
-5
- 0.01
81
85
4
-5
- 0.01
85
89
4
11
0.01
89
93
4
-5
- 0.01
93
97
4
16
0.02
97
101
4
6
0.01
101
105
4
-5
- 0.01
105
106
1
-5
- 0.01
106
107
1
-5
- 0.01
107
108
1
16
0.02
108
109
1
38
0.04
109
110
1
-5
- 0.01
110
111
1
160
0.16
111
112
1
7
0.01
112
113
1
9
0.01
113
117
4
-5
- 0.01
117
120
3
-5
- 0.01
10
Hole ID
Hole Type
East (m)
MGA94
Zone 51
North (m)
MGA94
Zone 51
RL
End of
Hole (m)
Azi (°)
Dip (°)
Depth
From (m)
VKRC0082
RC
268834
6718177
471
210
270
- 50
0
4
4
9
0.01
5
8
3
-5
- 0.01
ASX:VKA | vikingmines.com
Depth To
Length (m)
(m)
Au ppb
Au g/t
8
12
4
-5
- 0.01
12
16
4
-5
- 0.01
16
20
4
-5
- 0.01
20
24
4
-5
- 0.01
24
28
4
5
0.01
28
32
4
-5
- 0.01
32
36
4
-5
- 0.01
36
40
4
-5
- 0.01
40
44
4
-5
- 0.01
44
48
4
10
0.01
48
52
4
-5
- 0.01
52
56
4
-5
- 0.01
56
60
4
-5
- 0.01
60
64
4
-5
- 0.01
64
68
4
-5
- 0.01
68
72
4
-5
- 0.01
72
76
4
-5
- 0.01
76
80
4
-5
- 0.01
80
84
4
12
0.01
84
88
4
-5
- 0.01
88
92
4
-5
- 0.01
92
96
4
-5
- 0.01
96
100
4
-5
- 0.01
100
104
4
-5
- 0.01
104
108
4
6
0.01
108
112
4
14
0.01
112
116
4
6
0.01
116
120
4
5
0.01
120
124
4
0
0.00
124
128
4
0
0.00
128
132
4
0
0.00
132
136
4
0
0.00
136
140
4
0
0.00
140
144
4
0
0.00
144
148
4
0
0.00
148
152
4
0
0.00
152
156
4
0
0.00
156
160
4
6
0.01
160
164
4
7
0.01
164
168
4
9
0.01
168
172
4
52
0.05
172
176
4
24
0.02
176
180
4
-5
- 0.01
180
184
4
-5
- 0.01
184
185
1
-5
- 0.01
185
186
1
-5
- 0.01
186
187
1
-5
- 0.01
187
188
1
-5
- 0.01
188
189
1
-5
- 0.01
189
190
1
-5
- 0.01
190
191
1
-5
- 0.01
191
192
1
-5
- 0.01
192
193
1
-5
- 0.01
193
194
1
-5
- 0.01
194
195
1
-5
- 0.01
195
196
1
-5
- 0.01
196
197
1
-5
- 0.01
197
198
1
-5
- 0.01
198
199
1
-5
- 0.01
199
200
1
-5
- 0.01
200
201
1
-5
- 0.01
201
205
4
-5
- 0.01
205
209
4
-5
- 0.01
209
210
1
-5
- 0.01
11
Hole ID
Hole Type
East (m)
MGA94
Zone 51
North (m)
MGA94
Zone 51
RL
End of
Hole (m)
Azi (°)
Dip (°)
Depth
From (m)
VKRC0084
RC
268707
6718172
471
240
270
- 50
0
4
4
8
8
ASX:VKA | vikingmines.com
Depth To
Length (m)
(m)
Au ppb
Au g/t
4
-5
- 0.01
4
-5
- 0.01
12
4
-5
- 0.01
12
16
4
6
0.01
16
20
4
-5
- 0.01
20
24
4
43
0.04
24
28
4
52
0.05
28
30
2
70
0.07
30
32
2
-5
- 0.01
32
34
2
9
0.01
34
36
2
473
0.47
36
38
2
10
0.01
38
40
2
19
0.02
40
42
2
-5
- 0.01
42
46
4
-5
- 0.01
46
50
4
-5
- 0.01
50
54
4
-5
- 0.01
54
58
4
-5
- 0.01
58
62
4
-5
- 0.01
62
66
4
-5
- 0.01
66
70
4
-5
- 0.01
70
74
4
-5
- 0.01
74
78
4
-5
- 0.01
78
82
4
-5
- 0.01
82
86
4
-5
- 0.01
86
90
4
-5
- 0.01
90
94
4
-5
- 0.01
94
98
4
-5
- 0.01
98
102
4
-5
- 0.01
102
106
4
-5
- 0.01
106
110
4
-5
- 0.01
110
114
4
-5
- 0.01
114
118
4
-5
- 0.01
118
120
2
-5
- 0.01
120
124
4
-5
- 0.01
124
128
4
5
0.01
128
129
1
-5
- 0.01
129
130
1
-5
- 0.01
130
131
1
-5
- 0.01
131
132
1
-5
- 0.01
132
133
1
-5
- 0.01
133
134
1
7
0.01
134
135
1
-5
- 0.01
135
136
1
9
0.01
136
137
1
6
0.01
137
138
1
-5
- 0.01
138
139
1
6
0.01
139
140
1
10
0.01
140
141
1
16
0.02
0.01
141
142
1
11
142
143
1
7
0.01
143
144
1
-5
- 0.01
144
145
1
-5
- 0.01
145
149
4
-5
- 0.01
149
153
4
7
0.01
153
157
4
5
0.01
157
161
4
5
0.01
161
165
4
-5
- 0.01
165
169
4
-5
- 0.01
169
170
1
15
0.02
170
171
1
6
0.01
171
172
1
-5
- 0.01
172
173
1
8
0.01
173
174
1
5
0.01
174
175
1
-5
- 0.01
175
176
1
9
0.01
176
177
1
-5
- 0.01
177
181
4
-5
- 0.01
181
185
4
-5
- 0.01
185
189
4
-5
- 0.01
189
193
4
-5
- 0.01
193
197
4
-5
- 0.01
197
201
4
18
0.02
201
205
4
9
0.01
205
209
4
11
0.01
209
213
4
-5
- 0.01
213
217
4
-5
- 0.01
217
218
1
-5
- 0.01
218
219
1
-5
- 0.01
219
220
1
-5
- 0.01
220
221
1
8
0.01
221
222
1
-5
- 0.01
222
223
1
-5
- 0.01
223
224
1
-5
- 0.01
224
225
1
-5
- 0.01
225
229
4
-5
- 0.01
229
233
4
-5
- 0.01
233
237
4
-5
- 0.01
237
240
3
-5
- 0.01
12
APPENDIX 3 – JORC CODE, 2012 EDITION – TABLE 1
JORC Table 1, Section 1 – Sampling Techniques and Data
Criteria
JORC Code explanation
Nature and quality of sampling (e.g. cut channels, random chips, or
specific specialised industry standard measurement tools appropriate
to the minerals under investigation, such as downhole gamma sondes,
or handheld XRF instruments, etc.). These examples should not be
taken as limiting the broad meaning of sampling.
Sampling
techniques
Drilling
techniques
Include reference to measures taken to ensure sample representivity
and the appropriate calibration of any measurement tools or systems
used.
Aspects of the determination of mineralisation that are Material to the
Public Report. In cases where ‘industry standard’ work has been done
this would be relatively simple (e.g. ‘reverse circulation drilling was
used to obtain 1 m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay’). In other cases more explanation
may be required, such as where there is coarse gold that has inherent
sampling problems. Unusual commodities or mineralisation types
(e.g. submarine nodules) may warrant disclosure of detailed
information
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air
blast, auger, Bangka, sonic, etc.) and details (e.g. core diameter, triple
or standard tube, depth of diamond tails, face-sampling bit or other
type, whether core is oriented and if so, by what method, etc.).
Method of recording and assessing core and chip sample recoveries
and results assessed.
Drill sample
recovery
Measures taken to maximise sample recovery and ensure
representative nature of the samples.
Whether a relationship exists between sample recovery and grade
and whether sample bias may have occurred due to preferential
loss/gain of fine/coarse material.
Logging
Whether core and chip samples have been geologically and
geotechnically logged to a level of detail to support appropriate
ASX:VKA | vikingmines.com
Commentary
RC chip samples are collected at the drill rig during the drilling process. Samples are collected from a cone splitter by
placing a calico bag across the cone splitter apertures as well as a bucket under the splitter to collect the remainder of the
sample. Samples are collected every metre drilled with the reject being placed on the ground and the calico bag being
placed on top. Each of the calico sample bags average approximately 3kg in weight. Where 1m samples are selected, the
calico bag is collected in a new individually numbered calico bag. For 2m or 4m composite samples, representative scoops
are taken from each of the sample piles being sampled and composited into a numbered calico bag. All samples selected
for analysis are delivered for assay at Intertek laboratories in Kalgoorlie for 50g fire assay analysis.
The Competent Person considers these sampling methods appropriate for this style of mineralisation.
RC sample recovery is monitored for excessive sample loss and recorded to ensure sample representivity.
The Competent Person considers these sampling methods appropriate for this style of mineralisation.
RC drilling is used to obtain 1m sample intervals from which the geologist at the rig determines the sample interval to be
collected for analysis. 1m samples are collected in areas of interest and either 2m or 4m composite samples are collected
using a scoop from the respective sample piles to produce a composite sample for the interval required. On average,
approximately 3kg is pulverised by the laboratory to produce a 50g charge for fire assay. Selective 1m samples are
collected for multi-element analysis where deemed required. QAQC samples are inserted as described in the relevant
section below to monitor for any bias and ensure representivity.
The Competent Person considers these sampling and analytical methods appropriate for this style of mineralisation.
Reverse Circulation (RC) drilling is being utilised.
RC drilling recoveries are visually estimated and recorded as part of geological logging and sampling process and is
estimated as either Good, Fair, Poor or No sample.
RC drilling sample recovery is monitored to ensure representivity of the samples. High pressure air compressors with
auxiliary boosters and compressors are used to ensure good sample recovery from the drillhole. Drilling equipment and
procedures are suitable to maximise sample recovery and the representative nature of the samples. Sample weights are
recorded by the laboratory and reviewed with feedback given to the drillers to ensure consistent sample weights are
produced.
RC drilling used standard drilling equipment and procedures that are suitable to maximise sample recovery and the
representative nature of the samples. Insufficient data has been collected to establish if any bias is present due to loss/gain
of fine/coarse material.
Logging of drill cuttings is undertaken as a first pass indication of potential gold and multi-element anomalism. Samples of
rock chips from drill cuttings are logged by the geologist in the field, for parameters including, depth, colour, grain size,
weathering, lithology, alteration, rock fabric and the presence of minerals potentially related to mineralisation including
13
Criteria
JORC Code explanation
Mineral Resource estimation, mining studies and metallurgical
studies.
quartz and sulphides. Geological logging detail is deemed sufficient to support any appropriate future studies. No
geotechnical logging is undertaken on the RC chips/drillholes.
Whether logging is qualitative or quantitative in nature. Core (or
costean, channel, etc.) photography.
Logging of RC chips is qualitative in nature. Photographs are taken of all RC chip trays and sample spoil piles in the field.
The total length and percentage of the relevant intersections logged.
100% of RC drilling is logged.
If core, whether cut or sawn and whether quarter, half or all core taken.
Not applicable.
If non-core, whether riffled, tube sampled, rotary split, etc. and
whether sampled wet or dry.
For all sample types, the nature, quality and appropriateness of the
sample preparation technique.
Subsampling
techniques and
sample
preparation
Quality control procedures adopted for all subsampling stages to
maximise representivity of samples.
Measures taken to ensure that the sampling is representative of the insitu material collected, including for instance results for field
duplicate/second-half sampling.
Quality of assay
data and
laboratory tests
Commentary
All RC samples were collected via a cone splitter to yield predominantly dry sub samples of approximately 3kg from a 1 m
downhole sample length. At the laboratory, samples are dried and those <3kg are not split prior to pulverising. If samples
are >3kg they are crushed and rotary split at the laboratory to <3kg before being pulverised.
The Competent Person considers the methods and processes as described in previous sections for sample preparation
appropriate for this style of mineralisation.
Standard laboratory procedures adopted for analysis of samples including laboratory duplicate sample analysis and
standards. Duplicate sampling has been applied to the RC drill programme (see details below) to measure repeatability of
samples. Standards (1:40 samples) and blanks (1:40 samples) are inserted by Viking Mines into the sampling sequence to
both check accuracy and precision of the analytical technique and for any contamination in the analytical process. Results
are checked on receipt of assay batches and QAQC reports produced by Viking Mines database manager for checking by
the geologist. No issues have been identified with the representivity of the samples.
Viking Mines collects field duplicates via scoop samples from the RC sample spoil at a ratio of 1:50 samples. This results in a
general coverage of 1 to 2 samples per hole drilled in the current programme. Laboratory analysis involved the duplicate
analysis of certain samples are part of the routine lab QAQC. No issues have been identified within Viking’s field duplicates
or the duplicate analysis reported by the laboratory.
Whether sample sizes are appropriate to the grain size of the material
being sampled.
Sample sizes are considered appropriate to the grain size of the material being sampled given the style of mineralisation
being targeted and are industry standard for gold exploration in the Eastern Goldfields.
The nature, quality and appropriateness of the assaying and
laboratory procedures used and whether the technique is considered
partial or total.
Samples are delivered to Intertek laboratories in Kalgoorlie. Fire Assay method (50g charge) for gold. The analytical
technique for gold is considered total.
The Competent Person considers the current methods and processes described as appropriate for this style of
mineralisation.
For geophysical tools, spectrometers, handheld XRF instruments, etc.,
the parameters used in determining the analysis including instrument
make and model,
Share your feedback
Discover