VIKING OUTLINES GOLD DRILL TARGETS AT FIRST HIT PROJECT
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
21 November 2024
VIKING OUTLINES GOLD DRILL TARGETS AT FIRST HIT
PROJECT
•
High quality near mine and greenfields gold targets, prioritised for phased 20,000m
drill programme.
•
Seven target areas throughout 25km strike of the Zuleika Shear comprised of:
• Three high-priority, near mine gold targets following up high grade intercepts
including 1m at 36.49g/t Au.
• Three underexplored greenfields target areas (Duplex Targets) defined using
structural targets and geochemical anomalies located along the Zuleika Shear.
• >1.4km geochemical anomaly with historical RC drilling (drilled in the 1980’s)
returning significant, high-grade results including 4m at 5.1g/t Au & 4m at
4.88g/t Au
•
Extensive First Hit Gold Project drilling campaign now underway and fully funded with
~$5 million in cash
•
Enhanced Company focus on exploring for high grade gold in an underexplored
greenstone belt along the Zuleika Shear and proximal to significant processing
infrastructure
Viking Mines Limited (ASX: VKA) ("Viking" or "the Company") is pleased to announce the
target details for the recently commenced ~5,000m drilling programme, which forms part of a
larger expanded multi-phase ~20,000m drilling programme.
The initial ~5,000m phase of the drilling program will be completed prior to the end of the
December quarter (with assays expected early Q1 2025), testing high quality targets proximal to
the First Hit Mine and first pass drilling at high-priority zones along a 25km stretch of the Zuleika
Shear, a well-recognised structural belt, known for its significant high grade gold endowment.
Viking Mines Managing Director & CEO Julian Woodcock said:
“I am very pleased to be able to share with the market the details and strategy for Viking’s
aggressive drilling programme, designed to facilitate discovery of new gold deposits along the
Zuleika Shear.
“The significant 100% controlled land position which Viking has established encompasses >25km
of the prolific Zuleika Shear which is host to multiple million ounce plus gold deposits and is
immediately adjacent to Ora Banda Mining’s >1.3Moz Riverina-Mulline Camp and shares the same
host geology.
“The extremely limited previous drill testing over the Company’s controlled tenure, coupled with
the strong geological and geochemical characteristics, presents a compelling basis for the
substantial drilling programme the Company has commenced.
“I look forward to providing updates to market as the drilling advances.”
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
PHASE 1 DRILL TARGETS
The Phase 1 drill programme has two focus areas for drill testing.
1. First Hit - Near mine drill testing, following up on previously intersected mineralisation to
establish grade continuity and growth potential.
2. Zuleika Shear - Greenfields drill testing to assess the potential of the significant strike
length of the Zuleika Shear which has seen little effective bedrock exploration.
The details of these targets are presented below.
FIRST HIT NEAR MINE DRILL TARGETS
Several near mine, high grade drill targets to be tested as part of the current drill programme at
the First Hit Project (Figure 1) scheduled to be completed in the December Quarter:
• Jana’s Reward 1 – testing along strike and down dip of 2022 drilling intercepts of;
•
VKRC 0053:
1m at 17.83g/t Au from 16m
•
VKRC0057:
2m at 18.71g/t Au from 17m, inc.
1m at 36.49g/t Au
• First Hit North 2 – testing the northern continuation of the first hit structure 720m
north of the First hit Gold Mine and the Camp 1 shoot, down dip of;
•
VKRC0023:
2m at 9.67g/t Au from 26m
• First Hit South 3 – testing the southern continuation of the first hit structure 450m
south of the First hit Gold Mine and up dip of;
•
VKRC0041:
1m at 7.66 g/t Au from 45m
These targets present compelling opportunities for drill testing to establish potential continuity
of mineralisation and the identification of mineralised gold shoots along the same structure which
hosts the First Hit Gold Mine (mined 30koz at 7.7g/t and closed in 2003).
Drilling will step out from the historical, high-grade intercepts to determine the strike and dip of
the mineralisation. Once this has been established, follow up drilling will occur as part of the
Phase 2 programme.
ASX Announcement 3 March 2022 – Viking Hits Bonanza Gold Up To 36G/T Au 1.5km From First Hit
ASX Announcement 22 December 2021 – Viking Receives High Grade Results 720m North of First Hit
3
ASX Announcement 19 April 2022 – Viking Receives Final Assays For First Hit RC Drill Program
1
2
ASX:VKA | vikingmines.com
2
Figure 1; Map showing location of First Hit near mine drill targets and drill results being followed up in Phase 1 drill
programme.
ASX:VKA | vikingmines.com
3
ZULEIKA SHEAR – A MAJOR GOLD HOSTING STRUCTURE
The Zuleika Shear is host to multiple major gold deposits in several Moz+ camps, occurring
over a >250km strike length and is home to many major mining Companies, including 4;
• St Ives Camp (Gold Fields Ltd)
• Kundana Camp (Evolution Mining Ltd) >4Moz
• Bullant Deposit (Norton Gold Fields) >0.8Moz
• Central Davyhurst Camp (Ora Banda Mining) >1.2Moz
• Riverina-Mulline Camp (Ora Banda Mining) >1.3Moz
• Bottle Creek (Alt Aurenne) ~0.5Moz
• Mt Ida (Delta Lithium) >1Moz
The First Hit Gold Project encompasses a substantial 25km strike length of the Zuleika Shear
and lies in the northern part of this prolific gold district, immediately adjacent to the active >1.3
Moz Riverina-Mulline Gold Camp owned by Ora Banda Mining (ASX:OBM) and 60km south of
Delta Lithium’s Mt Ida Project (ASX:DLI).
This extensive zone of the Zuleika Shear has seen little exploration or bedrock drill testing due to
fragmented ownership over the past 25+ years and prior focus of activity on the outcropping
deposits at the neighbouring Riverina-Mulline Gold Camp.
ZULEIKA SHEAR – HIGH PRIORITY TARGETS
Vikings assessment of available geological data and exploration targeting has confirmed that
there is a substantial greenfields exploration opportunity.
The Company has identified multiple high priority targets using the following criteria:
•
Limited drill testing and tenor of historical drilling results (southern limit of the lease)
confirming presence of gold pathways
•
Structural setting & complexity (magnetic interpretation)
•
Geochemical anomalies >10ppb which is characteristic of the soils anomaly signature for
narrow vein high-grade gold deposits in this area
Historical Drill Testing
Viking has compiled an extensive database of historical drilling locations. The compiled database
indicates that the majority of the 25km strike has had no bedrock drill testing (Figure 2).
The southern 3km of the tenure has seen some localised areas of angled drill testing a 1.4km
14ppb gold in soil anomaly (Figure 3). Drilling has been effective (where completed) at testing
the bedrock and has in turn returned positive results confirming presence of high-grade gold
mineralisation 2km from the southern tenement boundary.
Highlights include 5:
• RSR65 – 4m at 5.1g/t Au from 12-16m (drilled in 1986)
• RSR231 – 8m at 1.45g/t Au from 32m (drilled in 1987)
• RSRC9 – 4m at 4.88g/t Au from 38m (drilled in 1988)
These results warrant further follow up and will form part of the planned expanded drill program.
4
5
See Appendix 1 for source data
ASX Announcement 25 March 2022 - VIKING FINDS 4M AT 5.1G/T AU IN HISTORIC DATA ON NEW TENURE
ASX:VKA | vikingmines.com
4
Figure 2; Map showing the 25km strike length of the Zuleika Shear controlled by Viking and the limited extent of historical
drilling and bedrock drill testing completed over the structurally complex geological targets for gold mineralisation.
Background image is 1VDP-RTP magnetics.
ASX:VKA | vikingmines.com
5
Figure 3; Map showing the Southern Structural target areas as part of Viking tenement E30/529 with 14ppb and
20ppb auger anomaly outlines, drillhole collar locations and gold intercepts highlighted. Note high grade 32.5g/t Au
rock chip from prospectors shaft in the south. All data has been sourced from historical WAMEX reports.
ASX:VKA | vikingmines.com
6
Structural Setting & Complexity
Within the Company’s tenure is evidence of multiple structures associated with the regional
Zuleika Shear, determined via the interpretation of the magnetic geophysics.
The magnetic response of the rock units throughout the area is mapped, which in turn has
revealed three major zones of structural thickening that has occurred, where the rocks have been
thrusted to form duplexes.
These are called the Northern, Central and Southern Duplex’s respectively (Figure 2). A fourth
area of faulting causing thickening of the ultramafic unit is apparent at the southern end of the
tenure and coincides with the 14ppm anomaly which has seen limited drill testing (discussed
above in the historical drilling section - Figure 3) which has returned significant gold grades.
These faults have the potential to host gold mineralisation by providing a pathway for the
mineralising fluids and present high priority exploration targets.
Geochemical Anomalies
In addition to the favourable structural setting, there are geochemical anomalies which have been
obtained in both historical soils sampling programs and an extensive auger sampling program
completed by Viking.
The geochemical response has been determined significant based on the work completed at First
Hit, where it is known that >10m from high grade gold veins, the residual low-grade halo is
measured at ~10ppb (0.01ppm) and decreases with distance 6. As such the Company considers
any gold anomalies in geochemistry >10ppb to be of interest and have the potential to be
proximal to gold mineralisation.
Along the full 25km target area there are multiple >10ppb gold anomalies extending across
multiple sample lines (ranging from 0.8km to 6km in length) within Vikings 400m x 100m auger
sampling program (Figure 4 & Figure 5). These anomalies are coincident with the mapped
location of the major structures identified in the geophysics interpretation and provide further
support to the potential for hosting gold mineralisation.
In the northern half of the tenure which encompasses the Northern and Central Duplex target
areas the >10ppm anomalies align with the visible magnetic lows (dark areas - Figure 4). The
anomalies are further supported by rock chips obtained from field mapping returning up to 0.5g/t
in silicified ultramafics.
In the southern half of the tenure which encompasses the Southern Structural target and historical
RC and RAB drilling (Figure 3), there are multiple >10ppb anomalies which follow the strike
orientation of the interpreted Zuleika Shear (Figure 5). These anomalies when reviewed in context
of the limited bedrock testing of the Southern Structural target which returned significant gold
intercepts (as reported above) present further priority targets for follow up drill testing.
6
ASX Announcement 30 August 2021 – VIKING DD RESULTS UP TO 71G/T AU & NEW TARGET DEFINED
ASX:VKA | vikingmines.com
7
Figure 4; Map of Northern and Central Duplex targets showing >10ppb auger geochemistry anomalies coincident with
structures mapped in the magnetic geophysics (base map RTP 1VD).
ASX:VKA | vikingmines.com
8
Figure 5; Map of Southern structural target area showing >10ppb auger geochemistry anomalies coincident with structures
mapped in the magnetic geophysics (base map RTP 1VD) and associated with the Zuleika Shear eastern margin.
ASX:VKA | vikingmines.com
9
REGIONAL EXPLORATION & DRILLING STRATEGY
Due to the large area being assessed in the Zuleika Shear greenfields target area coupled with
the presence of shallow cover over much of the tenure, a multi-phase strategy needs to be
adopted to test the drill targets.
Phase 1 Reverse Circulation Drilling
Strategy: Conduct a heel to toe drill fence across the Northern Duplex (Figure 7) to obtain
bedrock data and identify the mineralised structural pathways via gold analysis.
Whilst targeting high grade narrow vein gold, results within 100m of a significant deposit can
return single digit single intercepts over narrow widths which are significant in context of the
exploration target. This is well illustrated by Ora Banda Mining’s Riverina deposit long section.
The Riverina Main Lode East is made up of 4 main shoots in long section, with several coalescing
with depth. Immediately adjacent to these shoots are continual 1-5 gram-metre intercepts (Figure
6).
Applying this analogue to Vikings exploration area means, that on testing across the structural
duplexes with supporting geochemical anomalism, any result in the 1-5gm range with associated
faulting, veining, and/or foliation represents a mineralised pathway/structure.
The first stage regional focused drilling program will utilise ~4,400m of drilling in 3 heel to toe
drill fences to identify these structures over a ~2.8km strike length at the North Duplex target
(Figure 7). For reference to scale, the entire Riverina deposit would fit between the spacing of the
drill fences and hence the importance to follow up any results indicating mineralised pathways in
subsequent phases of drilling. This is illustrated on Figure 7 with the long section below (Figure
6) included on the map to scale.
Figure 6; Modified long section of the Riverina Main Lode East deposit as reported by Ora Banda Mining (ASX:OBM) on 3 August
2024. Note the multiple occurrences of 1-5 gram metre intercepts immediately adjacent to and within the deposit highlighting the
significance of low grade intercepts when targeting narrow vein high-grade deposits.
ASX:VKA | vikingmines.com
10
Phase 2
Once mineralised pathways have been determined via stage 1 drilling, the second phase of
drilling will be to test the mineralised structures identified along strike (North and South) with 200300m spaced drill fences to assess areas where the structures have thickened and produced
higher grades.
These drill fences will be shorter in length as the focus areas has been narrowed to the width of
the mineralised structural pathways.
In parallel to following up the Northern Duplex target, the phase 2 drilling will see first pass drill
fences being completed across the Central Duplex, further generating more follow up targets.
Program Execution & Timing
The priority drill targets will be tested sequentially, with the First Hit near mine drill targets and
the Northern Duplex currently being tested by the Phase 1 drilling underway. It is expected that
Phase 1 will be completed mid-December.
Assay results are expected in February, enabling the Phase 2 drilling to commence late February.
The Phase 2 drilling is envisaged to both follow up results from the northern duplex and also
conduct heel to toe first pass traverses across the central duplex and first pass testing of the
Southern Structural Target.
In the event of a discovery of substantial mineralisation, the Company will reassess the timing and
priorities of the follow up drilling and seek to mobilise additional resources to advance the targets
more rapidly.
FIRST HIT RESOURCE EXPANSION POTENTIAL ASSESSMENT BY MEC MINING
The mineral resource assessment being undertaken by MEC Mining is underway with focus on
reviewing the following aspects of the First Hit Deposit:
1.
2.
3.
4.
Geological model of mineralisation
Pegmatite model which locally stopes out mineralisation
Extent of historical mine workings
Potential for remaining unmined mineralisation
Assessing these factors will inform the Company if there is potential for remaining unmined
mineralisation that has the potential to be economic in the current high gold price climate. The
Company will update shareholders on the First Hit Gold Mine mineral resources opportunity as
information comes available.
Given the high-gold price environment, the Company is cautiously optimistic of a positive
outcome of the study and the opportunity to define JORC (2012) classified resources on the
Project.
ASX:VKA | vikingmines.com
11
Figure 7; Map showing location of Viking Phase 1 RC drill collars testing the Northern Duplex Target and follow up drilling a
the First Hit near mine targets. Note the Riverina long section (Figure 6) illustrated at the map scale to demonstrate the large
area being tested and potential to host susbstantial gold deposits.
ASX:VKA | vikingmines.com
12
NEXT STEPS
The Company continues to advance exploration activities with the objective of the discovery of
new gold deposits on the highly prospective tenure at the First Hit Project. The following next
steps are underway.
•
Completion of Phase 1 drill programme by the end of the December quarter
•
Submit all samples for analysis with results expected late January/Early February 2025
•
Continue to develop targets and drill planning for the Phase 2 drilling envisaged to
commence in February 2025
•
Complete the resource assessment of the First Hit Gold Mine and establish a JORC (2012)
Resource
We look forward to providing updates to market as advancement are made with the Project.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements
concerning Viking Mines Limited’s planned exploration program and other statements that are not historical facts. When used
in this document, the words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar
expressions are forward-looking statements. Although Viking Mines Limited believes that its expectations reflected in these
forward-looking statements are reasonable, such statements involve risks and uncertainties and no assurance can be given that
actual results will be consistent with these forward-looking statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is
a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time
employee of Viking Mines Ltd. Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock
consents to the disclosure of the information in this report in the form and context in which it appears.
ASX:VKA | vikingmines.com
13
FIRST HIT PROJECT, WESTERN AUSTRALIA
The First Hit Project is centred around the historic high-grade First Hit gold mine situated along
the prospective Ida and Zuleika Shear zones in the Eastern Goldfields of Western Australia. The
Project incorporates 479.9km2 of tenements with 7 active Mining and Prospecting licences, 5
Exploration licences, and 3 Exploration licences under application. At the core of this landholding
is a 6.4km2 group of contiguous tenements which host the historic First Hit gold mine.
Prior to closure of the First Hit gold mine by Barra Resources in 2002 and at a time of depressed
gold prices of US$320/oz, the First Hit mine produced ~30koz ounces of gold at an average grade
of ~7.7g/t Au. The Company is focused on delivering exploration programmes to test near mine
extensions and regional targets around the First Hit Project with the objective of defining fertile
structures and discovering gold ounces.
The Project area is well serviced by infrastructure and is located 50km west of the sealed
Goldfields highway and the township of Menzies. The nearest operating Gold Processing Plant is
the Davyhurst Mill 40km to the south, owned and operated by Ora Banda Mining (ASX:OBM). The
nearest operating gold mine is the Riverina open pit, located 8km south of the First Hit gold mine,
owned by OBM.
*See Appendix 1 for data source references
ASX:VKA | vikingmines.com
14
APPENDIX 1 – DATA SOURCES FOR MINERAL RESOURCE ESTIMATES AND MINE
PRODUCTION REFERENCED ON MAP IN FIGURE 1.
Riverina-Mulline Camp
Historical production: 305koz Au5
Measured, Indicated & Inferred Mineral Resource: 854koz Au6
OBM Production (FY21-23): 170koz Au7,8,9
TOTAL: 1,333koz
Central Davyhurst Camp
Historical production: 811koz Au1
2024 Indicated & Inferred Mineral Resource: 396koz Au2
TOTAL: 1,207koz Au
Bullant
Historic Production: 354koz Au3
Measured, Indicated & Inferred Mineral Resource: 462koz Au4
TOTAL: 816koz
Kundana Camp
Historic Production to June 2020: 2.75Moz Au10
FY21 to FY24 Production: 291,853oz Au11,12,13,14
Current Ore Reserves: 464koz Au15
Frogs Leg Mineral Resources: 770koz Au16
TOTAL 4.28Moz
Mt Ida
Historical production: 290koz Au19
2024 Indicated & Inferred Mineral Resource: 752koz Au20
TOTAL: 1,042koz Au
Bottle Creek
Historic Production: 90koz Au17
Alt Resources Quarterly Report 30 June 2020 - JORC Resource & Reserve Table: 370koz Au17
TOTAL 460koz
Map Source References
1) https://orabandamining.com.au/projects/davyhurst/
2) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
3) https://www.miningnews.net/precious-metals/news/1233885/bullant-gold-packs-bite
4) https://nortongoldfields.com.au/bullant/
5) https://orabandamining.com.au/projects/davyhurst/
6) https://orabandamining.com.au/download/annual-mineral-resource-and-ore-reservestatement/?wpdmdl=12926&refresh=6736d249d1fcd1731646025
7) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2021/?wpdmdl=7200&refresh=6736e1d72a3a51731650007
8) https://orabandamining.com.au/download/annual-report-for-the-year-ended-30-june2022/?wpdmdl=8803&refresh=6736e1d71beab1731650007
9) https://orabandamining.com.au/download/annual-report-2023/?wpdmdl=11152&refresh=6736e1d703e691731650007
10) https://randmining.com.au/projects/east-kundana-joint-venture/
11) https://app.sharelinktechnologies.com/announcement/asx/44dffa9bc8eaaa574af7cfda9564c595
12) https://app.sharelinktechnologies.com/announcement/asx/690381347ddb79dc8261b0f775636da7
13) https://app.sharelinktechnologies.com/announcement/asx/b13d0741e08843fb98f0e8c8be20eaaa
14) https://app.sharelinktechnologies.com/announcement/asx/00592059cc0f5c205e3eb6cfa25f3e4d
15) https://evolutionmining.com.au/storage/2024/02/2680687-Annual-Mineral-Resources-and-Ore-Reserves-Statement.pdf
16) https://evolutionmining.com.au/storage/2015/08/01647903.pdf
17) https://www.asx.com.au/asxpdf/20171108/pdf/43p1pnwsv6kd3g.pdf
18) https://www.asx.com.au/asxpdf/20200814/pdf/44lj6rj9wqk8r0.pdf
19) https://en.wikipedia.org/wiki/Mount_Ida_Gold_Mine
20) https://deltalithium.com.au/our-projects/mt-ida-lithium-gold/
ASX:VKA | vikingmines.com
15
APPENDIX 2 – AUGER AND SOIL SAMPLE ASSAY TABLE
Sample ID
East (m)
MGA94
North (m)
MGA94
Sample Sample
Type Depth (m)
Au ppb
Sample ID
East (m)
MGA94
North (m)
MGA94
Sample Sample
Type Depth (m)
Au ppb
Sample ID
East (m)
MGA94
North (m)
MGA94
Sample Sample
Type Depth (m)
Au ppb
CN18001
268620
6700904
Auger
3.0
27
CN18101
268319
6696906
Auger
1.5
4
CN18201
269825
6698303
Auger
2.5
1
CN18002
268820
6700910
Auger
3.0
8
CN18102
268416
6696904
Auger
2.5
2
CN18202
269624
6698306
Auger
1.5
13
CN18003
269022
6700903
Auger
3.0
6
CN18103
268515
6696902
Auger
2.5
1
CN18203
269420
6698304
Auger
2.5
1
CN18004
269223
6700907
Auger
3.0
11
CN18104
268616
6696907
Auger
2.5
3
CN18204
269222
6698302
Auger
2.5
1
CN18005
269421
6700906
Auger
1.5
42
CN18105
268718
6696903
Auger
0.0
1
CN18205
269127
6698300
Auger
1.5
2
CN18006
269624
6700910
Auger
3.0
7
CN18106
268815
6696910
Auger
3.0
3
CN18206
269023
6698304
Auger
0.5
2
CN18007
269618
6700705
Auger
3.0
7
CN18107
268924
6696910
Auger
1.0
11
CN18207
268928
6698302
Auger
2.5
8
CN18008
269422
6700704
Auger
3.0
8
CN18108
269017
6696908
Auger
1.5
5
CN18208
268824
6698304
Auger
3.0
24
CN18009
269224
6700705
Auger
3.0
3
CN18109
269119
6696903
3
CN18209
268719
1.5
27
CN18010
269025
6700701
Auger
3.0
5
CN18110
269221
6696906
Auger
1.5
5
CN18210
268626
6698307
Auger
1.5
10
CN18011
268824
6700706
Auger
3.0
12
CN18111
269322
6696910
Auger
2.5
4
CN18211
268517
6698305
Auger
2.0
2
CN18012
268627
6700703
Auger
2.5
6
CN18112
269421
6696907
Auger
1.0
3
CN18212
268417
6698299
Auger
1.5
2
CN18013
268630
6700509
Auger
3.0
5
CN18113
269524
6696907
Auger
1.0
5
CN18213
268319
6698307
Auger
1.5
2
CN18014
268826
6700510
Auger
3.0
8
CN18114
269619
6696905
Auger
1.0
28
CN18214
268228
6698300
Auger
1.5
4
CN18015
269012
6700509
Auger
3.0
10
CN18115
269718
6696906
Auger
2.0
11
CN18215
268222
6698101
Auger
1.5
12
CN18016
269221
6700505
Auger
3.0
7
CN18116
269817
6696909
Auger
2.5
5
CN18216
268318
6698104
Auger
1.5
1
CN18017
269420
6700510
Auger
3.0
8
CN18117
269922
6696903
Auger
1.0
5
CN18217
268419
6698104
Auger
2.0
15
CN18018
Auger
1.5
6698307
Auger
269622
6700508
Auger
1.0
42
CN18118
270024
6696905
Auger
0.5
5
268516
6698104
Auger
1.0
CN18019
269618
6700304
Auger
0.5
20
CN18119
270225
6696905
Auger
3.0
7
CN18219
268619
6698102
Auger
2.5
15
CN18020
269420
6700302
Auger
3.0
8
CN18120
270420
6696906
Auger
0.5
2
CN18220
268720
6698102
Auger
2.0
26
CN18021
CN18218
6
269227
6700310
Auger
3.0
7
CN18121
270611
6696903
Auger
0.5
6
CN18221
268815
6698109
Auger
1.5
25
CN18022
269018
6700306
Auger
3.0
20
CN18122
270825
6696910
Auger
0.5
14
CN18222
268918
6698109
Auger
1.5
24
CN18023
268822
6700308
Auger
3.0
13
CN18123
271025
6696911
Auger
0.5
2
CN18223
269022
6698107
Auger
2.0
8
CN18024
268817
6700110
Auger
1.0
10
CN18124
271020
6697301
Auger
0.5
8
CN18224
269117
6698104
Auger
1.5
5
CN18025
269025
6700124
Auger
1.0
24
CN18125
270823
6697307
Auger
0.5
6
CN18225
269219
6698105
Auger
2.0
6
CN18026
269225
6700109
Auger
2.5
17
CN18126
270621
6697302
Auger
1.0
4
CN18226
269417
6698107
Auger
2.5
9
CN18027
269421
6700106
Auger
3.0
21
CN18127
270424
6697300
Auger
0.5
4
CN18227
269619
6698102
Auger
1.0
13
CN18028
269625
6700105
Auger
3.0
14
CN18128
270225
6697305
Auger
1.5
7
CN18228
269817
6698099
Auger
0.5
4
CN18029
268221
6695510
Auger
0.5
36
CN18129
270026
6697509
Auger
1.5
3
CN18229
270015
6698108
Auger
1.0
3
CN18030
268315
6695506
Auger
0.5
26
CN18130
269822
6697497
Auger
2.0
8
CN18230
270228
6698106
Auger
0.5
2
CN18031
268421
6695498
Auger
3.0
16
CN18131
268215
6697101
Auger
0.5
3
CN18231
270416
6698096
Auger
0.5
6
CN18032
268616
6695713
Auger
3.0
3
CN18132
268321
6697105
Auger
2.5
4
CN18232
270624
6698102
Auger
0.5
7
CN18033
268521
6695700
Auger
0.5
15
CN18133
268419
6697105
Auger
2.0
3
CN18233
270822
6698097
Auger
1.0
1
CN18034
268427
6695698
Auger
1.0
25
CN18134
268517
6697108
Auger
2.5
3
CN18234
271021
6698106
Auger
0.5
4
CN18035
268322
6695709
Auger
0.5
10
CN18135
268616
6697102
Auger
2.5
2
CN18235
271018
6698504
Auger
0.5
5
CN18036
268221
6695703
Auger
0.5
6
CN18136
268715
6697110
Auger
0.5
8
CN18236
270825
6698509
Auger
1.0
3
CN18037
268217
6695905
Auger
3.0
3
CN18137
268819
6697102
Auger
2.0
25
CN18237
270623
6698506
Auger
0.5
1
CN18038
268318
6695905
Auger
3.0
15
CN18138
268922
6697099
Auger
2.0
6
CN18238
270419
6698504
Auger
0.5
8
CN18039
268415
6695904
Auger
3.0
8
CN18139
269019
6697102
Auger
1.0
5
CN18239
270220
6698502
Auger
0.5
4
CN18040
268524
6695900
Auger
1.0
5
CN18140
269120
6697104
Auger
1.0
0
CN18240
270024
6698510
Auger
0.5
2
CN18041
268617
6695904
Auger
1.0
11
CN18141
269219
6697103
Auger
1.5
3
CN18241
269828
6698497
Auger
3.0
10
1.5
17
CN18042
268715
6695910
Auger
3.0
10
CN18142
CN18242
269622
CN18043
269224
6696105
Auger
0.5
6
CN18143
269019
6697300
Auger
1.5
7
CN18243
269423
6698508
Auger
2.0
1
CN18044
269118
6696095
Auger
1.0
15
CN18144
268924
269120
6697304
6697304
Auger
Auger
2.0
1.5
5
4
CN18244
269221
6698505
6698496
Auger
2.5
4
CN18045
269027
6696098
Auger
1.0
11
CN18145
268826
6697303
Auger
1.5
21
CN18245
269123
6698505
Auger
2.0
CN18046
268923
6696102
Auger
2.5
5
CN18146
268720
6697296
Auger
0.5
25
CN18246
269021
6698497
Auger
2.5
1
CN18047
268828
6696109
Auger
3.0
6
CN18147
268628
6697297
Auger
1.5
64
CN18247
268927
6698498
Auger
1.5
5
CN18048
268725
6696099
Auger
0.5
8
CN18148
268524
6697296
Auger
2.0
8
CN18248
268822
6698494
Auger
2.0
9
CN18049
268625
6696097
Auger
3.0
1
CN18149
268429
6697300
Auger
2.0
7
CN18249
268722
6698499
Auger
2.5
38
CN18050
268525
6696101
Auger
3.0
2
CN18150
268321
6697304
Auger
2.5
1
CN18250
268617
6698499
Auger
2.0
26
CN18051
268422
6696105
Auger
3.0
1
CN18151
268225
6697302
Auger
2.0
7
CN18251
268520
6698499
Auger
1.5
18
CN18052
268324
6696102
Auger
2.0
2
CN18152
268221
6697504
Auger
0.5
2
CN18252
268421
6698499
Auger
2.0
3
CN18053
268223
6696099
Auger
2.5
4
CN18153
268321
6697499
Auger
1.5
5
CN18253
268325
6698509
Auger
Share your feedback