CONCEPTUAL PROCESS ESTABLISHED FOR THE LINKA
TUNGSTEN PROJECT
• Conceptual process flow diagram finalised with Mineral Technologies, successfully
incorporating all baseline metallurgical findings to date.
• Modular design enables the future integration of advanced WHIMS or Falcon recovery
stages, subject to further testwork.
• Preliminary equipment sizing underway to inform indicative order-of-magnitude cost
considerations.
• Conceptual processing rate of 43 (tonnes per hour) adopted for evaluation purposes.
• Comminution testwork (rock-breakage and energy testing) to support preliminary
inputs into power and water requirements.
• Assessment of equipment procurement strategies underway to support
development planning.
Viking Mines Limited (ASX: VKA) (OTC:VKALF) ("Viking" or "the Company") is pleased to
update the market on the progress of the Linka Tungsten Project (“Linka” or “the Project”)
processing concept study being conducted by Mineral Technologies.
Following the successful advancement of baseline metallurgical testwork delivering a saleable
gravity concentrate1
at 63.6% WO3, Mineral Technologies have established a process flowsheet
to advance the conceptual processing study. This marks a key milestone in the project’s "Rapid-
Start" development strategy, shifting the focus from laboratory validation to mechanical
engineering, financial modelling and CAPEX estimates.
Viking Mines Managing Director & CEO Julian Woodcock said:
“Defining conceptual processing steps for Linka is a significant step in the Company’s strategy to
advance engineering and processing in parallel with exploration development. Mineral
Technologies have designed a process flow that is both robust and flexible, allowing us to maintain
a capital-efficient pathway to potential future development while keeping the ability to add
additional recovery stages later. Our focus is now on specifying equipment and completing
desktop engineering to develop preliminary, high level cost estimates.”
PROCESS FLOWSHEET AND MODULAR OPTIONALITY
The conceptual process flow diagram is aligned with metallurgical results to date, which
demonstrated the potential to produce a high-grade concentrate under laboratory conditions
through gravity separation. The process also effectively isolates garnet rich middlings within the
gravity process. A core strength of the Mineral Technologies design is its modularity; the plant is
being designed to allow for the future addition of extra processing stages, such as Wet High-
Intensity Magnetic Separation (WHIMS) or a Falcon Concentrator, without requiring a
fundamental redesign of the primary circuit.
1
ASX Announcement 31st
March 2026 – Vikings Linka Project achieves 63.6%WO3 concentrate.
2
ASX:VKA | vikingmines.com
This "future-proof" approach ensures that if subsequent metallurgical testing identifies
opportunities for even higher recoveries, the conceptual design allows for potential future
modification, subject to further study.
PROCESSING RATE ASSUMPTIONS
The study considered a nominal processing rate of approximately 43 tonnes per hour for
conceptual evaluation purposes only.
This processing rate is used solely to support technical assessment of the flowsheet and
associated equipment configuration. It does not represent a production target or forecast and
remains subject to further technical and economic evaluation.
Figure 1; Block flow diagram illustrating the conceptual flowsheet design for the Linka Project conceptual processing study.
3
ASX:VKA | vikingmines.com
FINANCIAL AND ENGINEERING INPUTS
Mineral Technologies has commenced the specification and sizing of mechanical equipment. This
preliminary engineering work is expected to inform indicative, order-of-magnitude capital cost
estimates.
To support the OPEX modelling, the Company will integrate data from comminution testwork
which is due to commence this month using a newly collected metallurgical sample. This testwork
is expected to provide preliminary inputs into estimates of power and water consumption, as well
as reagent and consumable rates established from the ongoing metallurgical testwork
programme.
The Company is also assessing the commercial viability of a "Purchase vs Hire" strategy for specific
modules, such as the crushing circuit. This assessment aims to minimise upfront capital
expenditure and reduce potential development lead times.
ONGOING WORK AND NEXT STEPS
Viking continues to fast track the Linka Tungsten Project through multiple workstreams and are
targeting drilling commencing in the June quarter. Immediate near-term activity includes:
• Evaluation of historical tailings dam and stockpiles as potential supplemental feedstocks.
• Phase 2 field programme, including surface geological mapping to assess targets generated
from gravity and magnetic geophysics surveys and historical trench sampling.
• Completion and reporting of the 3D geological model used to plan drilling and for potential
use in determining a JORC (2012) exploration target.
• Lodging a Notice of Intent for maiden drilling programme at the Linka Project with the Bureau
of Land Management.
• Securing a drilling contractor with targeted drilling later in the June quarter.
• Ongoing metallurgical testwork, with cleaner flotation testwork results expected late
April/early May.
END
This announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Michaela Stanton-Cook - Company Secretary
Viking Mines Limited
+61 8 6245 0870
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Viking Mines
Limited’s planned exploration programme and other statements that are not historical facts. When used in this document, the words such as "could,"
"plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking statements. Although Viking Mines Limited
believes that its expectations reflected in these forward-looking statements are reasonable, such statements involve risks and uncertainties and no
assurance can be given that actual results will be consistent with these forward-looking statements.
Share your feedback
Discover