VKA PRESENTATION - GOLD COAST INVESTMENT SHOWCASE
Released
Released
Announcement PDF
Large Scale Gold
Exploration at
Riverina East
25-26 June 2025
ASX:VKA
Disclaimer & Competent Persons Statements
Disclaimer
This presentation and any accompanying verbal presentation (together the Presentation) are confidential and have been prepared by Viking Mines Limited (Viking or the Company) and approved by the Board of the Company. The information
contained in the Presentation (Information) is summary only and should be read in conjunction with any other documents provided to you by the Company. The Information is current as at 20 June 2025 and the Company does not undertake to
provide any additional or update information, whether as a result of new information, future events or results or otherwise. By receiving the Presentation, you acknowledge and represent to the Company that you have read, understood and
accepted the terms of this disclaimer.
The Company has prepared the Presentation based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the currency, accuracy, reliability, completeness or fairness of the
information, opinions and conclusions contained in this Presentation. Viking, or related bodies corporate, shareholders or affiliates, nor any of their respective officers, directors, employees, affiliates, agents or advisers (Agents) guarantee or make
any representations or warranties, express or implied, as to or take responsibility for, the currency, accuracy, reliability, completeness or fairness of the information, opinions and conclusions contained in this Presentation. Viking does not represent
or warrant that this Presentation is complete or that it contains all material information about Viking or which a prospective investor or purchaser may require in evaluating a possible investment in Viking or acquisition of shares. To the maximum
extent permitted by law, Viking and its Agents expressly disclaim any and all liability, including, without limitation, any liability arising out of fault or negligence, for any loss arising from the use of information contained in this Presentation, or
otherwise arising in connection with it.
Any forward-looking statements in this Presentation, including projections, forecasts and estimates, are provided as a general guide only and should not be relied on as an indication or guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, contingencies and other important factors, many of which are outside the control of Viking and which are subject to change without notice and could cause the actual results, performance or
achievements of Viking to be materially different from the future results, performance or achievements expressed or implied by such statements. Past performance is not necessarily a guide to future performance and recipients of this Presentation
are cautioned not to place undue reliance on such forward-looking statements.
The information contained in this Presentation is for information purposes only, does not constitute investment or financial product advice (nor taxation, accounting or legal advice) and is not intended to be used as the basis for making an
investment decision. In providing this Presentation, Viking has not considered the objectives, financial position or needs of any particular recipients. Before making an investment decision prospective investors should consider the appropriateness
of the information in this Presentation having regard to their own objectives, financial situation and needs, and seek legal, taxation and financial advice appropriate to their jurisdiction and circumstances.
This Presentation is not a prospectus, product disclosure statement or other offer document under Australian law or any other law (and will not be lodged with the Australian Securities and Investments Commission or any other foreign regulator)
and is not, and does not constitute, an invitation or offer of securities for subscription, purchase or sale in any jurisdiction. In particular, this Presentation does not constitute an invitation or offer of securities for subscription, purchase or sale in the
United States or any other jurisdiction in which such an offer would be illegal. The securities referred to in this Presentation have not been, and will not be, registered under the U.S. Securities Act of 1933 as amended or the securities laws of any
state or other jurisdiction of the United States and may not be offered or sold, directly or indirectly in the United States. The information in this Presentation is strictly confidential. It may not be disclosed, reproduced, disseminated, quoted or
referred to, in whole or in part, without the express consent of Viking.
Competent Person’s Statements
Information in this release that relates to Exploration Results is based on information compiled by Mr. Julian Woodcock, who is a Member and of the Australian Institute of Mining and Metallurgy (MAusIMM CP) – 305446). Mr. Woodcock is a fulltime employee of Viking Mines Ltd. Mr. Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity being undertaken to qualify as a Competent Person as defined
in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original announcements.
The information in this announcement that relates to the Mineral Resource estimate and Pit Optimisation is derived from information compiled by Mr. Dean O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM,
#112948), and Competent Person for this style of mineralisation. Mr. O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC Mining, an independent mining and exploration consultancy. Mr. O’Keefe has sufficient experience
relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of Exploration
Results, Mineral Resources, and Ore Reserves (JORC Code). The Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original announcements.
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the information and supporting documentation prepared by Mr. Damian Connelly. Mr. Connelly is a full-time employee of
METS Engineering who are a Contractor to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr. Connelly has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration, and to the activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources and Ore Reserves. The
Company confirms that the form and context in which the Competent Person’s findings are presented have not been materially modified from the original announcements.
The information in this announcement that relates to the Underground Mining Study is derived from information compiled by Mr Ben Wilson, a Member of the Australasian Institute of Mining and Metallurgy (AusIMM, #222682), and Competent
Person for the application of mine design parameters to the Global MRE. Mr Wilson has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as
Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). Mr Wilson consents to the inclusion in the report of the matters based on the
results in the form and context in which they appear.
ASX:VKA
vikingmines.com
2
Company Overview
Corporate Snapshot
ASX Code
Share Price
VKA
$0.006
Board and Management
Shares on Issue
1.328B
(20 June 2025)
Market Cap
$8.0M
(Undiluted)
Top 20 (excl Dir)
50.75%
Cash
$3.4M
(as at 31 Mar 25)
Enterprise Value
$4.6M
Other Shareholders
37%
Directors
12.25%
Julian Woodcock
Dr Julian Stephens
Bevan Tarratt
Chairman
Managing Director
& CEO
Non-Executive
Director
Non-Executive
Director
Riverina East Gold Project
• Historic First Hit Gold Mine with high-grade global
Inferred MRE of 83.8kt at 7.0g/t Au for 19.0kozi
Share Price Chart
• Underground Mining Study completed
$0.016
40.0
$0.014
35.0
$0.012
30.0
$0.010
25.0
$0.008
20.0
$0.006
15.0
$0.004
10.0
$0.002
5.0
$-
-
• Significant regional exploration potential along
25km strike of prolific Zuleika Shear
Volume (m)
Price (A$/share)
Charles Thomas
Canegrass Battery Minerals Project
• Vanadium Magnetite deposit with nearby infrastructure
• Global Inferred MRE of 146Mt at 0.70% V2O5, 31.8% Fe
& 6.6% TiO2 (>0.5% V2O5 cut-off)ii
• Pit Optimisation Study completed
Narndee Project
• Early-stage Gold and Base Metals exploration in
the Murchison Region, WA
ASX:VKA
vikingmines.com
i. ASX Announcement 20 January 2025 - VIKING DEFINES HIGH-GRADE GOLD MINERAL RESOURCE AT FIRST HIT MINE
ii. ASX Announcement 20 November 2023 – VIKING RESOURCE UPDATE DELIVERS OVER 100% GROWTH AT CANEGRASS
3
RIVERINA EAST
GOLD PROJECT
1 Diamond drill core shown is from hole VDD008 at the Riverina East Project
Viking Mines Limited ASX Release 24 June 2021 VIKING RECEIVES FIRST DIAMOND RESULTS & SIGHTS VISIBLE GOLD
4
Riverina East Project Hunting Elephants in Elephant Country
Large land package in well-established gold province
Location
•
Centred around 100% owned historic First Hit Gold Mine
with a high-grade global MRE of 19koz at 7.0g/t Aui
•
Located 4km East of Ora Banda Mining’s (ASX:OBM)
Riverina Gold Mine & 40km from the Davyhurst Mill
Scale
•
480km2 land position
•
25km of prospective strike of the Zuleika Shear
•
No bedrock drilling and lack of prior exploration activity
ASX:VKA
vikingmines.com
i.
ASX Announcement 20 January 2025 – Viking Defines High-Grade Gold Resource at First Hit Mine
5
Riverina East Project First Hit Mine
Historically Produced ~30koz Au at ~7.7g/t Aui, with 19koz at 7.0g/t Auii remaining
• Closed in 2002 when the gold price was <US$325/oz (now 10x)
• Granted Mining Lease & significant infrastructure in place, with decline
down to ~220m below surface (~$15M value)
• Substantial high-grade unmined interceptsiii including;
• 4.9m @ 64.8 g/t Au from 62.1m (FHU045)
• 3m @ 77.6 g/t Au from 224.0m (BFH030)
• 4m @ 26.1 g/t Au from 58.0m (BFH005)
• Mineralisation remains open down plunge
• Underground Mining Studyiv delivered Inferred Resource of 53.1kt at
7.2g/t Au for 12.4koz constrained within a mine design (>1.3g/t Au
stoping cut-off grade)
Cautionary Statement: The Underground Mining Study referred to in this report is
based on low-level technical and economic assessments and is insufficient to support
estimation of Ore Reserves or to provide assurance of an economic development
case at this stage, or to provide certainty that the conclusions of the Underground
Mining Study will be realised. For avoidance of doubt, the stated MRE determined by
the UMS is the in situ Mineral Resource and this announcement does not contain any
forecast financial information and does not include a Production Target.
ASX:VKA
vikingmines.com
i. Barra Resources Limited (2002), First Hit Mining Report December 2002 (Final Report) M30/99; Report No. BRLP 00107. Submitted to DMIRS
ii. VKA ASX Announcement 20 January 2025 - VIKING DEFINES HIGH_GRADE GOLD RESOURCE AT FIRST HIT MINE
iii. VKA ASX Announcement 26 November 2020 – Acquisition of high-grade gold projects in Western Australia
iv. VKA ASX Announcement 10 June 2025 – VIKING DELIVERS 12KOZ IN FIRST HIT UNDERGROUND MINING STUDY
6
0.0
Narrow Vein High-grade
Visible Gold
0.0
0.5
mm
0.0
0.0
0.5
mm
0
0.5
mm
0.5
mm
1.0
HISTORIC
DRILLHOLEi
FDH001 –
DRILLED IN 2001
1.0
1.0
0.0
1.0
NQ Diameter Core
5
10
cm
ASX: VKA | vikingmines.com
0.0
0.0
0.5
mm
1.0
0.5
mm
0.5
mm
1.0
1.0
The weighted intercept value in the First Hit database for hole FDH001 is 0.5m at 103.5g/t Au from 59.7m to 60.2m.
i. Viking Mines Limited ASX Release 15 February 2021 VIKING MINES INVESTOR PRESENTATION ON FIRST HIT PROJECT
7
OBM Riverina Underground Mine Case Study
Exploration analogue for Viking’s Zuleika Shear regional targets
1.6m at 25.2g/t Au
Ore Drive
ASX:VKA
vikingmines.com
UG Main Lode - Long Section
i. Riverina long section and photos from Ora Banda Mining’s (ASX: OBM) Corporate Presentation - Euroz Hartleys Conference, released to ASX on 7 March 2025
8
Riverina East Project High Priority Targets
First Hit
30koz mined,
19koz
Inferred MRE
Target
25km strike of Zuleika shear untested by bedrock drilling
OPPORTUNITY
•
Greenfields ground – no bedrock drill testing for >23km before Viking
commenced activity in November 2024
•
Same stratigraphic position as the >1.2Moz Au Central Davyhurst
Camp (ASX:OBM) 40km south
•
Immediately adjacent to the >1.3Moz Riverina-Mulline Camp (ASX:OBM)
Riverina
(ASX:OBM)
Long
Section to
scale
Central Duplex
Target
Southern
Duplex Target
EXPLORATION STRATEGY
•
•
•
Targeting narrow vein high grade deposits typical of this setting
Heel to toe drill traverses provide full coverage of the geology
1-5 gram metre intercepts define mineralised pathways for follow up
ACTIVITY
Systematic phased exploration underway with ~13,400m RC Drilling
completed from ~20,000m budgeted programmei
•
•
•
•
Early-stage success with discovery of new gold structuresii
Geochemistry proving effective
Southern
Structural Target
Shear
•
RiverinaMulline
Camp
>1.3Moz
More than half the strike length yet to see first pass regional drilling
Phase 3 drilling commencing early July following up high-grade intercepts
ASX:VKA
vikingmines.com
i. Viking Mines (ASX:VKA) ASX Announcement 18 November 2024 – Viking Expands First Hit Gold Project Drilling Programme
ii. Viking Mines (ASX:VKA) ASX Announcement 25 February 2025 – Viking hits gold in 2nd Regional Drill Traverse, 1.7km south
9
Riverina East Project Bifrost Target
TRAVERSE 4
0.8km
Discovery Success With the Drill Bit
TRAVERSE 1
VKRC0068
17m at 1.1g/t Au incl.
1m at 1.6g/t Au
2m at 3.1g/t Au
3m at 1.3g/t Au
RESULTS
•
Confirms gold pathways in this genuine unexplored greenstone
•
High-grade narrow vein discovered in VKRC0180:
•
•
•
•
2m at 23.6g/t Aui (visible gold)
•
Analogous to the high-grade Riverina & First Hit mines
Wide spaced drilling 1.7km apart:
•
17m at 1.1g/t Au with peak values up to 3.18g/t Auii
•
5m @ 1.0g/t Au and 3m @ 1.3g/t Auiii
VKRC0117
1m at
2.3g/t Au
1.7km
ASX:VKA
i. Viking Mines (ASX:VKA) ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
vikingmines.com ii. Viking Mines (ASX:VKA) ASX Announcement 18 February 2025 – Viking Confirms Gold Discovery at Northern Duplex Greenfields Target
iii. Viking Mines (ASX:VKA) ASX Announcement 25 February 2025 – Viking hits gold in 2nd regional drill traverse, 1.7km south
VKRC0180
2m at 23.6g/t Au
1m at 3.2g/t Au
1m at 1.5g/t Au
TRAVERSE 2
VKRC0178
1m at
3.3g/t Au
1.1km
Favourable dolerite host rock intersected
Follow up drilling commencing early July to test for extensions to
high-grade intercept of 2m at 23g/t Aui (VKRC0180)
VKRC0083
27m at 0.4g/t Au incl.
1m at 2.9g/t Au
1m at 1.1g/t Au
1m at 1.5g/t Au
VKRC0103
23m at 0.4g/t Au incl.
5m at 1.0g/t Au
3m at 1.3g/t Au
TRAVERSE 3
10
Bifrost - Traverse 2
Interpreted N-S
striking structure
trending through mag
low target and high
grade result in
VKRC0180
VKRC0117
1m at 2.3g/t
Au from 98m
VKRC0180
1m at 1.5g/t from 108m
1m at 3.2g/ Au from 112m
2m at 23.6g/t Au from124m
VKRC0103
23m at 0.4g/t Au from 97m incl.
5m at 1.0g/t from 102m
3m at 1.3g/t from 115m
VKRC0188
8m at 167ppb
from 36m
VKRC0178
1m at 3.3g/t
Au from 51m
VKRC0192
24m at 169ppb
from 28m
•
Drilling identified North/South Structures
•
High-grade gold encountered supports exploration
target model
•
Dolerite hosted mineralisation, visible gold and extent
of broad gold anomaly highlight significant potential
of discovery
Bifrost Prospect – Traverse 2i
VKRC0195
4m at 0.5g/t Au
from 36m
Interpreted N-S
striking structure
trending through
mag low target
VKRC0125
4m at 0.6g/t
Au from 44m
ASX:VKA
vikingmines.com
VKRC0121
1m at 1.7g/t
Au from 91m
i. VKA ASX Announcement 2 May 2025 – VIKING INTERSECTS HIGH GRADE GOLD WITH VISIBLE GOLD IN RIVERINA EAST DRILLING
11
Riverina East Project Bifrost Target Traverse 2i
High grade veins in good host rocks with grade increasing with depth
ASX:VKA
vikingmines.com
i. Viking Mines (ASX:VKA) ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
12
Riverina East Project Central Duplex Target
3.2km
Bifrost
Target
Central Duplex Target returning strong gold anomalies
RESULTSi
•
260m wide, strongly anomalous zone indicative of substantial
mineralised fluid flow
•
•
Peak grades up to 1.5g/t Au (VKRC0155)
Structures identified, further follow up work required
ASX:VKA
vikingmines.com
i. Viking Mines (ASX:VKA) ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
13
Riverina East Project It’s all about the scale
KEY TAKEAWAYS
•
Greenfields exploration next to multimillion
ounce high-grade camps
•
The scale is huge but being systematically
worked
•
Geochemistry delivering large gold
anomalies and pathfinder elements
(As, Bi, Te, Sb, W)
•
Wide spaced drilling is delivering success
•
Targeting high-grade narrow veins (<2m)
and finding them, VKRC0180 2m at
23.6g/t Aui
•
Broad zones of strong gold anomalism
confirm mineralising fluid pathways
•
Ora Banda Mining (~$1.8B market cap)
neighbour with mill 40km to South
ASX:VKA
vikingmines.com
i. Viking Mines (ASX:VKA) ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
14
Viking Mines Advancing Projects to Add Value
Key Workstreams
RIVERINA EAST GOLD PROJECT
Ongoing aggressive exploration programme testing
high-priority targets along 25km strike length of
greenfields tenure
Investment Case
• Western Australian portfolio of Gold and Critical Mineral Vanadium
projects near existing operations and infrastructure
• Large 480km2, highly prospective and untested land package on
the prolific Zuleika Shear – host to multi-million ounce endowment
Highly prospective tenure along 25km strike length of
prolific Zuleika Shear
• Aggressive exploration programme delivering results with high
Fully funded Phase 3 follow up drilling to commence
in early July
• Exploration strategy confirms gold in a greenfields area with no
Pursuing monetisation opportunities for the First Hit
Mine MRE
• Historic Gold Mine on granted mining lease with high-grade
CANEGRASS BATTERY MINERALS PROJECT
• Canegrass Vanadium Project with high-grade pit constrained MRE
V2O5 purification and electrolyte production
testwork
grade narrow veins discovered - assays up to 43.6g/t Aui
bedrock RC drilling for >23km
12.4koz Au Inferred Resource
of 61Mt @ 0.81% V2O5 & 35.9% Fe iii
• Fully funded work programmes with $3.4M (end Mar Q FY25)
Mining lease application
ASX:VKA
vikingmines.com
i. VKA ASX Announcement 2 May 2025 – VKA Intersects High Grade Visible Gold in Riverina East
ii. VKA ASX Announcement 10 June 2025 - VIKING DELIVERS 12KOZ IN FIRST HIT UNDERGROUND MINING STUDY
iii. ASX Announcement 18 March 2024 – VKA DELIVERS SUCCESSFUL PIT OPTIMISATION 61MT AT 0.81% V2O5
15
Supplementary
Information:
Canegrass Battery
Minerals Project
An advanced Vanadium Project
providing substantial opportunity
in the growing long duration
energy storage sector
Vanadium Critical, Industrial and Battery Mineral
Established Critical Mineral with Massive Growth Potential
Market Supply i
Significant advantages
over Li-Ion batteries
Total global supply ~120Kt vanadium pa
61%
China
Russia
17%
South Africa
Brazil
8%
USA
Forecasted Demand i
Supply deficit predicted to grow from 2024 onwards
5% 3% 6%
Other
2.6x 2023
levels
Source: Energy & Capital
No
Degradation
ASX:VKA
vikingmines.com
i)
US based vanadium specialist: TTP Squared, Inc
Low $/kWh
over battery life
Nonflammable
Fully
Recyclable
Simple Capacity
Expansion
17
Canegrass Battery Minerals Project
• Significant Vanadium Resource, 100% owned
following recent Share Sale Agreement with
Red Hawk Mining (ASK:RHK)ii
• Located in Murchison Region with extensive
infrastructure within 20km (including
Windimurra Mine on care and maintenance)
• Global Inferred Mineral Resource Estimate
(MRE) of 146Mt at 0.70% V2O5, 31.8% Fe &
6.6% TiO2 (>0.5% V O cut-off)
2
iii
5
• Pit Constrained MRE 61Mt @ 0.81% V2O5 &
35.9% Fe (>0.7% V O cut-off)
2
5
iv
• Substantial value of the Project not reflected in
VKA Market Cap (EV of $7.77M)
ASX:VKA
vikingmines.com
i)
ii)
iii)
iv)
Refer to Appendix 1 for Mineral Resource Estimate sources
Viking Mines (ASX:VKA) ASX Announcement 5 September 2024 – VIKING MOVES TO 100% OWNERSHIP OF CANEGRASS PROJECT
Viking Mines (ASX:VKA) ASX Announcement 20 November 2023 - VIKING DELIVERS >100% GROWTH AT CANEGRASS WITH 2.2 B LBS OF VANADIUM PENTOXIDE.
Viking Mines (ASX:VKA) ASX Announcement 18 March 2024: VKA DELIVERS SUCCESSFUL PIT OPTIMISATION 61MT AT 0.81% V2O5
18
Flow Sheet Optimisation Underwayi,ii,iii
Value Adding Testwork to Unlock the Project Value
•
•
Flowsheet pathway established for Vanadium Production
High quality magnetic concentrate produced;
•
•
•
•
Mining
Crush/grind
Magnetic
Separation
Tail
Concentrate
Iron (Fe)
Residue
Roasting
Sulphide
Flotation
Purification
Sulphide
Concentrate
53% mass pull from ore to concentrate
1.43% V2O5, 59% Fe & 11.7% TiO2 from Low Intensity
Magnetic Separation (LIMS)
Roasting liberates Vanadium ahead of purification;
•
V2O5 recoveries up to 93.2% from magnetic
concentrate roasting
•
86.7% V2O5 total recovery from ore feed to Vanadium
Solution
V2O5 Flake
Vanadium Pentoxide (V2O5) Flake produced
•
•
Final purification step testwork ongoing
Targeting high purity V2O5 and electrolyte products
which attract premium pricing
ASX:VKA
vikingmines.com
i.
ii.
iii.
Magnetic
Concentration Using
LIMS
Magnetic
Concentrate
Roasted
Concentrate
Viking Mines (ASX:VKA) ASX Announcement 20 May 2024: VIKING PRODUCES VANADIUM PENTOXIDE FLAKE FROM CANEGRASS
Viking Mines (ASX:VKA) ASX Announcement 6 March 2024: VKA ACHIEVES 1.43% V2O5 & 59% FE IN HIGH QUALITY CONCENTRATE
Viking Mines (ASX:VKA) ASX Announcement 11 March 2024: VIKING ACHIEVES ROASTING SUCCESS AND 93.2% V2O5 RECOVERY
Vanadium in
Solution
Vanadium
Pentoxide
(V2O5) Flake
19
Appendix 1 – Vanadium Company Snapshot
VIKING MINES
(ASX:VKA)
COMPANY
Canegrass
PROJECT
Inferred:
146Mt @ 0.70% V2O5
TOTAL:
146Mt @ 0.70% V2O5
(Source: VKA 20 November 2023)
POS MRE:
61Mt @ 0.81% V2O5 &
35.9% Fe
(Source: VKA 18 March 2024)
ORE
RESERVES
PROJECT
STATUS
VENUS METALS
(ASX: VMC)
SUREFIRE RESOURCES
(ASX:SRN)
NEOMETALS
(ASX:NMT)
ATLANTIC PTY LTD
(PRIVATE)
Youanmi
Victory Bore and
Unaly Hill
Barrambie
Windimurra
395.4Mt @ 0.77% V2O5
135Mt @ 0.34% V2O5
465Mt @ 0.30% V2O5
280Mt @ 0.44% V2O5
209.7Mt @ 0.50% V2O5
Measured:
30.6Mt @ 1.13% V2O5
Indicated:
136.6Mt @ 0.85% V2O5
Inferred:
228.2 @ 0.66% V2O5
TOTAL:
395.4 @ 0.77 V2O5
Measured:
31.55Mt @ 0.33% V2O5
Indicated:
54.37Mt @ 0.33% V2O5
Inferred:
48.82Mt @ 0.36% V2O5
TOTAL:
134.73Mt @ 0.34% V2O5
Measured:
25.3Mt @ 0.35% V2O5
Indicated:
113.2Mt @ 0.32% V2O5
Inferred:
326.1Mt @ 0.28% V2O5
TOTAL:
465Mt @ 0.30% V2O5
Indicated:
187Mt @ 0.46% V2O5
Inferred:
93Mt @ 0.40% V2O5
TOTAL:
280.1Mt @ 0.44% V2O5
Measured:
34.6Mt @ 0.49% V2O5
Indicated:
123.5Mt @ 0.50% V2O5
Inferred:
51.6Mt @ 0.50% V2O5
TOTAL:
209.7Mt @ 0.50% V2O5
(Source: AVL 7 May 2024)
(Source: VMC 18 March 2019)
(Source: SRN 5 December 2023)
(Source: NMT May 16, 2023)
n/a
Probable:
93Mt @ 0.35% V2O5
TOTAL:
93Mt @ 0.35% V2O5
Murchison
Technology Metals
Project
Australian Vanadium
Project
(Formerly ASX:TMT)
146Mt @ 0.70%
V2O5
MINERAL
RESOURCES
AUSTRALIAN VANADIUM
(ASX:AVL)
n/a
Pit Optimisation Study
(Advancing to Scoping
Study)
ASX:VKA
vikingmines.com
Proved:
1.12Mt @ 0.95% V2O5
Probable:
43.36Mt @ 0.89% V2O5
TOTAL:
44.48Mt @ 0.89%
Proved:
10.5Mt @ 1.11% V2O5
Probable:
20.4Mt @ 1.07% V2O5
TOTAL:
30.9Mt @ 1.09% V2O5
(Source:
https://www.tmtlimited.com.au/m
urchison-technology-metalsproject/mineral-resources-orereserves/)
(Source:
https://www.australianvanadium.c
om.au/our-assets/the-australianvanadium-project/)
DFS
Complete
BFS
Complete
Exploration
Probable:
27.6Mt @ 0.57% V2O5
TOTAL:
27.6Mt @ 0.57% V2O5
(Source:
https://atlanticptyltd.com.au/proje
cts/windimurra/geology-reservesresources )
Probable:
87.5Mt @ 0.49% V2O5
TOTAL:
87.5Mt @ 0.49% V2O5
(Source:
https://www.surefireresources.co
m.au/project/vanadiumresources/)
(Source:
https://wcsecure.weblink.com.au/
pdf/NMT/02666246.pdf)
(Source:
https://atlanticptyltd.com.au/proje
cts/windimurra/geology-reservesresources)
PFS
Complete
PFS
Complete
DFS
Complete
20
Appendix 2 – Canegrass Mineral Resource Estimate
Global MRE i
Cut-Off
V2O5%
Model
Deposit
From
November 2023 Model
Fold
Nose
Kinks
South
Kinks
Combined
To
JORC
(2012)
Classification
Volume
Density
Tonnes
Tonnage
(Mt)
V2O5
%
Fe
%
Fe2O3
%
TiO2
%
Cu
%
Ni
%
Co
%
Al2O3
%
SiO2
%
P
%
P2O5
%
LOI
%
V2O5
T
V2O5
BLbs
Mt
Fe
Mt
TiO2
Cu
T
Ni
T
Co
T
0.00 0.50
Inferred
5,888,852
3.3
19,650,571
19.7
0.44
21.8
31.2
4.1
0.056 0.046 0.012
15.8
31.9
0.005
0.01
1.4
86,017
0.19
4.3
0.8
11,063
9,122
2,296
0.50 0.80
Inferred
16,751,576
3.6
60,641,026
60.6
0.65
30.3
43.3
6.2
0.057 0.059 0.015
13.1
23.2
0.004
0.01
1.8
396,405
0.87
18.4
3.8
34,427
35,965
8,989
3.9
14,468,533
14.5
0.87
37.5
53.6
8.0
0.070 0.071 0.018
9.9
16.5
0.004
0.01
1.3
125,508
0.28
5.4
1.2
10,102
10,343
2,675
75,109,560
75.1
0.69
31.7
45.3
6.5
0.059 0.062 0.016
12.5
21.9
0.004
0.01
1.7
521,913
1.15
23.8
4.9
44,530
46,308
11,664
0.80
Inferred
3,710,784
>0.5
Inferred
20,462,360
0.00 0.50
Inferred
2,115,784
3.7
7,800,150
7.8
0.42
21.2
30.3
4.4
0.044 0.041 0.011
18.0
31.4
0.007
0.02
3.7
32,893
0.07
1.7
0.3
3,417
3,214
835
0.50 0.80
Inferred
5,121,216
3.8
19,611,721
19.6
0.65
30.1
43.1
6.1
0.071 0.066 0.016
11.8
22.4
0.003
0.01
2.5
128,032
0.28
5.9
1.2
13,877
12,983
3,090
0.80
Inferred
2,460,284
3.9
9,573,436
9.6
0.88
36.8
52.7
8.0
0.076 0.071 0.019
8.6
16.3
0.003
0.01
1.7
84,614
0.19
3.5
0.8
7,285
6,814
1,783
>0.5
Inferred
7,581,500
29,185,158
29.2
0.73
32.3
46.2
6.7
0.073 0.068 0.017
10.7
20.4
0.003
0.01
2.3
212,647
0.47
9.4
2.0
21,162
19,797
4,873
0.00 0.50
Inferred
937,416
3.6
3,336,852
3.3
0.47
22.9
32.8
5.0
0.051 0.037 0.012
16.7
30.1
0.010
0.02
0.7
15,734
0.03
0.8
0.2
1,688
1,251
403
0.50 0.80
Inferred
10,182,016
3.7
38,032,009
38.0
0.66
31.2
44.7
6.4
0.074 0.057 0.016
11.3
22.8
0.009
0.02
1.3
251,368
0.55
11.9
2.4
28,057
21,671
6,148
0.80
Inferred
883,732
3.9
3,452,161
3.5
0.84
38.2
54.6
8.1
0.080 0.069 0.020
7.6
16.8
0.004
0.01
1.0
28,830
0.06
1.3
0.3
2,755
2,396
674
>0.5
Inferred
11,065,748
41,484,170
41.5
0.68
31.8
45.5
6.6
0.074 0.058 0.016
11.0
22.3
0.008
0.02
1.3
280,198
0.62
13.2
2.7
30,812
24,067
6,822
0.00 0.50
Inferred
8,942,052
3.4
30,787,573
30.8
0.44
21.8
31.1
4.3
0.053 0.044 0.011
16.4
31.6
0.006
0.01
1.9
134,643
0.30
6.7
1.3
16,168
13,586
3,534
0.50 0.80
Inferred
32,054,808
3.7
118,284,756
118.3
0.66
30.6
43.7
6.3
0.065 0.060 0.015
12.3
22.9
0.006
0.01
1.8
775,805
1.71
36.1
7.4
76,361
70,619
18,227
3.9
27,494,131
27.5
0.87
37.3
53.4
8.0
0.073 0.071 0.019
9.1
16.5
0.003
0.01
1.4
238,953
0.53
10.3
2.2
20,142
19,553
5,132
145,778,887
145.8
0.70
31.8
45.5
6.6
0.066 0.062 0.016
11.7
21.7
0.005
0.01
1.7
1,014,758
2.237
46.4
9.6
96,503
90,172
23,359
0.80
Inferred
7,054,800
>0.5
Inferred
39,109,608
Pit Optimisation Study ii
Deposit
Cut-off %
V2O5
JORC (2012)
Classification
Tonnage
(Mt)
V2O5
%
Fe
%
Cu
%
Ni
%
Co
%
TiO2
%
Fold Nose
0.7
Inferred
39.0
0.81
36.0
0.068
0.070
0.018
7.6
Kinks
0.7
Inferred
15.9
0.77
35.5
0.080
0.080
0.018
7.4
Kinks South
0.7
Inferred
6.3
0.85
36.7
0.074
0.074
0.018
7.8
Total
0.7
Inferred
61.2
0.81
35.9
0.071
0.069
0.018
7.6
ASX:VKA
vikingmines.com
i)
ii)
Viking Mines (ASX:VKA) ASX Announcement 20 November 2023 - VIKING DELIVERS >100% GROWTH AT CANEGRASS WITH 2.2 B LBS OF VANADIUM PENTOXIDE
Viking Mines (ASX:VKA) ASX Announcement 18 March 2024: VKA DELIVERS SUCCESSFUL PIT OPTIMISATION 61MT AT 0.81% V2O5
21
For more information
please contact:
Julian Woodcock
Managing Director & CEO
P +61 8 6245 0870
Share your feedback
Discover