Riverina East Project (formerly First Hit Project)
•
High-grade Inferred Mineral Resource Estimate (MRE) of 83.8k tonnes at 7.0g/t
Au for 19.0k ounces (JORC 2012) for the historical First Hit Gold Mine.
•
Phase 1 regional ~7,400m RC drill programme completed at the Bifrost Target
confirming gold across two drill traverses 1.7km apart, highlights include:
o
o
o
•
•
Drilling on the first drill traverse returned significant intercepts in VKRC0068
containing multiple >1g/t Au zones with;
▪
17m at 1.1g/t Au from 28m including;
▪
1m at 1.6g/t Au from 28m; and
▪
2m at 3.1g/t Au from 34m; and
▪
3m at 1.3g/t Au from 38m
And VKRC0083 of 27m at 0.4g/t Au from 69m containing multiple >1g/t Au
intercepts including;
▪
1m at 2.9g/t Au from 76m;
▪
1m at 1.1g/t Au from 81m; and
▪
1m at 1.5g/t Au from 91m.
Drilling on the second drill traverse returned two >1g/t Au zones in VKRC0103,
within a broader mineralised zone of 23m at 0.4g/t Au from 97m, including;
▪
5m at 1.0g/t Au from 102m
▪
3m at 1.3g/t Au from 115m
Infill shallow auger drilling at Bifrost completed and delivered;
o
>400m long >40ppb gold anomaly centred around VKRC0083 (27m at 0.4g/t Au)
and VKRC0068 (17m at 1.1g/t Au).
o
>300m long gold anomaly >40ppb anomaly located ~100m SSE of VKRC0103
(23m at 0.4g/t Au including 5m at 1.0g/t Au and 3m at 1.3g/t Au).
~6,000m phase 2 regional RC drill program completed (assays pending), with first
drilling at the Central Duplex Target and follow up drilling at the Bifrost target.
Generative Gold Exploration
•
Auger sampling completed over at the Narndee Project and Canegrass Project, with
results pending for 665 samples collected for gold and multi-element analysis.
Corporate
•
Strong cash position of $3.4M as of 31 March 2025
ASX:VKA
vikingmines.com
15-17 Old Aberdeen Place
West Perth, WA, 6005
P +61 8 6245 0870
F +61 8 9322 5230
contact@vikingmines.com
1
Viking Mines Limited (ASX:VKA) (“Viking” or “the Company”) is pleased to present its
quarterly activities report for the period ended 31 March 2025 (“March quarter”). Key activities
during the reporting period were driven by the strategic review of the Company’s gold assets
and primarily focused on the Riverina East Project (“Riverina East”) testing high priority Zuleika
Shear targets in the Eastern Goldfields, Western Australia.
Commenting on the quarterly activities, Viking Mines Managing Director & CEO Julian
Woodcock said:
“It’s been a highly active period in the field for Viking, as we focus on the greenfield exploration
potential of our Riverina East Project and the significant opportunity to discover substantial highgrade gold deposits in a well-endowed gold district, adjacent to nearby operations and
infrastructure.
“Results from the phase 1 drill programme are highly encouraging and confirm the presence of
gold across two wide spaced drill traverses 1.7km apart at the Bifrost Target. Viking has moved
quickly to follow up on this early success and also test other regional targets along the ~25km
strike of the Zuleika Shear controlled by the Company.
“Viking remains well-funded for our ongoing work plans and the recent drill for equity
agreement with Topdrill provides further runway to test the full potential of our significant
Zuleika Shear tenure.
“With the phase two drill programme now completed, we look forward to updating
shareholders with drill results in the weeks ahead and continuing to advance these regional
greenfield targets.”
Riverina
East
Project
Riverina East
Project
Figure 1: Map showing the location of Vikings extensive 100% controlled tenure and the position
of the Zuleika Shear and the regional associated gold deposits.1
1
See Appendix 2 for data source references
ASX:VKA | vikingmines.com
2
RIVERINA EAST PROJECT
First Hit Mine
The First Hit Gold Mine closed in 2003 after producing ~30koz at a mined grade of 7.8g/t Au.
Historical production records show a positive reconciliation from the calculated mined grade
compared to the mill production records.
Mining was undertaken using sub-level open stoping and focussed on the high-grade
components of the vein system, leaving lower grade material behind. The high-grade nature
of the deposit is reflected in the underground face sampling database as shown in Figure 2.
Figure 2: Long section looking to the west showing face samples on each of the mined levels, the decline access in
the footwall to the mineralisation and selected high-grade face sample results.
Drilling completed by Viking in 20212 demonstrated the deposit remains open at depth with
two drillholes testing below the historical workings returning;
•
VDD015: 7.06m at 5.93g/t Au from 296.94m, incl.
•
•
0.5m at 71.64g/t Au from 302.8m.
VDD013: 5.0m at 3.67g/t Au from 323m, incl.
•
1.0m at 11.16g/t Au from 325m.
Additionally, holes drilled closer to surface and within the area of old workings demonstrated
remaining high-grade mineralisation which is unmined including;
•
VDD012: 1.0m at 47.05g/t Au from 173m.3
2
ASX Announcement 30 August 2021 – Viking DD Results up to 71g/t Au & New Target Identified
3
ASX Announcement 24 June 2021 – Viking Receives First Diamond Results & Sights Visible Gold
ASX:VKA | vikingmines.com
3
Mineral Resource Estimate by MEC Mining4
Viking engaged MEC Mining, a leading global technical consulting firm dedicated to servicing
the mining industry, to undertake a mineral resource assessment of its 100%-owned First Hit
Gold Mine (“First Hit”), located 45 km west of Menzies and 2 hours north of Kalgoorlie in the
Eastern Goldfields region of Western Australia.
The mineral resource assessment undertaken by MEC Mining focussed on reviewing the
following aspects of the First Hit Deposit:
1.
2.
3.
4.
Geological model of mineralisation
Pegmatite model which stopes out mineralisation
Extent of historical mine workings
Potential for remaining unmined mineralisation
This assessment was aimed at informing the Company of whether there is potential for
remaining unmined mineralisation that has the potential to be economic in the current high
gold price climate.
The Company announced the definition of an Inferred Mineral Resource of 83.8kt @ 7.0g/t
Au for 19,000 ounces for the historical First Hit Mine. The existing decline at First Hit extends
to 220m below surface, providing an opportunity to access the mineralisation, subject to
dewatering.
MRE Next Steps
Following the establishment of a JORC MRE for the First Hit deposit, the Company can
commence further assessments to determine potential strategies to extract value from the
mineral resource for the benefit of Viking shareholders.
Key next steps include:
4
•
Assessing the opportunities at depth with the intention of defining a JORC (2012)
Exploration Target for down dip extensions of the orebody.
•
Determine de-watering and rehabilitation costs to gain access to the underground
workings.
•
Determine high level estimates of underground mining and operating costs.
•
Review options to undertake a Minable Shape Optimiser (“MSO”) evaluation on the
MRE to determine which portions of the mineral resource could be mined economically
using underground mining methods.
•
Complete Phase 1 regional exploration programme targeting new discoveries over
greenfield targets on existing tenements.
ASX Announcement 20 January 2025 – Viking Defines High-Grade Gold Mineral Resource at First Hit Mine
ASX:VKA | vikingmines.com
4
Figure 3: Long section view looking west showing the undepleted January 2025 MRE for the First Hit Deposit.
Figure 4: Long section looking west showing January 2025 MRE and historical underground workings at the First Hit
Deposit.
ASX:VKA | vikingmines.com
5
Figure 5: Long section looking west showing the depleted January 2025 MRE of 83.8Kt at 7.0g/t Au for 19.0Koz Au.
Phase 1 Drill Programme
Viking engaged Topdrill to undertake Reverse Circulation (“RC”) drilling at Riverina East to test
priority targets within Viking’s ~25km strike of the Zuleika Shear. The initial 5,000m phase 1
drill program was expanded to ~7,400m and forms part of an expanded Riverina East drilling
programme of up to ~20,000 metres of RC drilling.
Bifrost Target (formerly Northern Duplex Target) 5,6,7
Assays for the first drill traverse completed in the December quarter over the Bifrost Target
confirm the discovery of gold mineralisation across two separate structural positions, with the
most significant returning 27m at 0.4g/t Au and containing individual 1m intercepts up to
2.9g/t Au. Prior to the Company’s Phase 1 RC drilling there has been no bedrock drill testing
on Viking’s 100% controlled tenure for more than 20km to the South and 3km to the North.
5
ASX Announcement 3 February 2025 – Viking Discovers Gold at Northern Duplex Greenfields Target
6
ASX Announcement 18 February 2025 – Viking Confirms Gold Discovery at Northern Duplex Greenfields Target
7
ASX Announcement 25 February 2025 – Viking Hits Gold in 2nd Regional Traverse, 1.7km South
ASX:VKA | vikingmines.com
6
Bifrost – Traverse 1:
Several zones of anomalous gold have been intersected. The strongest is a broad intercept in
VKRC0083 of 27m at 0.4g/t Au (>0.1g/t cut-off) from 69m. Within this zone there are
multiple intercepts reporting >1g/t (Figure 6 & Figure 7):
•
1m at 2.9g/t Au from 76m
•
1m at 1.1g/t Au from 81m
•
1m at 1.5g/t Au from 91m
Two additional continuous ppb level anomalous zones have been intersected in the same
traverse.
•
VKRC0084 returned 20m at 78ppb from 20m and is located in the adjoining hole to the
west of the larger intercept in VKRC0083 reported above.
•
VKRC0085 returned 28m at 38ppb from 76m.
Although these additional intercepts are of a lower tenor than seen in VKRC0083, the
anomalies confirm additional structural positions which have seen gold-related alteration and
mineralisation and provide additional target horizons.
Other narrow (<8m) ppb level intercepts have also been encountered in several other holes
indicating discrete structural zones which warrant further interpretation and understanding as
to the relevance in the mineralising system.
Figure 6: Chip samples from VKRC0083 and analysis results reported as g/t gold. 27m at 0.4g/t Au from 69m with
higher grade intercepts up to 2.9g/t as annotated.
ASX:VKA | vikingmines.com
7
Figure 7: Cross section through drill traverse 1 at the Bifrost Target.
Assay results were also received for VKRC0068, a scissor hole drilled at the Bifrost Target on
the first drill traverse, following up on the intercept in hole VKRC0083 of 27m at 0.4g/t Au
(>0.1g/t cut-off) from 69m. This hole was planned late in the programme based on visual
alteration identified in VKRC0083 and designed to test the orientation and continuity of the
observed zone.
VKRC0068 returned a significant intercept of 17m at 1.1g/t Au from 28m containing
multiple +1g/t Au intercepts including (Figure 7 & Figure 8);
•
•
•
1m at 1.6g/t Au from 28m;
2m at 3.1g/t Au from 34m; and
3m at 1.3g/t Au from 38m.
This drillhole confirms the presence of a steep dipping gold hosting structure which is open
along strike with no constraining drillholes. The true extent of the zone cannot be determined,
with the next drill traverses located 0.8km North and 1.7km South.
Figure 8: Chip samples from VKRC0068 and analysis results reported as g/t gold. 17m at 1.1g/t Au from 28m with
higher grade intercepts up to 3.2g/t as annotated.
ASX:VKA | vikingmines.com
8
Bifrost – Traverse 2:
Assay results received for the 17 holes drilled along the 2nd drill traverse at Bifrost (Figure 9)
returned multiple anomalous zones (>40ppb), with the most significant being VKRC0103
which returned 23m at 0.4g/t Au from 97m, and contains two contiguous intercepts >0.5g/t
Au cut-off grade (Figure 9 & Figure 10) of;
•
5m at 1.0g/t Au from 102m
•
3m at 1.3g/t Au from 115m
Hole VKRC0103 confirms the presence of a steep dipping gold hosting structure which is open
along strike with no constraining drillholes. The strike extent of the mineralised zone cannot
yet be determined, with the adjoining drill traverses located 1.7km North (which intersected
17m at 1.1g/t Au from 28m in hole VKRC0068 and 27m at 0.4g/t from 69m in hole VKRC0083)
and 1.1km South (Figure 11).
The Company has reviewed the results in context of the magnetic geophysics dataset and
auger geochemistry gold and multi-element anomalies. This review has identified that the
results are coincident with the western margin of a ~1.3km long NNW-SSE striking magnetic
low and high gold in auger sample results of 0.5g/t.
The Company has confirmed from logging of drillholes distinct rock units correlate with the
lower magnetic signature with visual characteristics indicating a porphyritic dolerite unit.
This may be significant as the unit is more brittle than the adjoining ultramafic sequence which
provides a rheological contrast which maybe a more suitable host to form gold deposits. There
are many examples of significant gold deposits being hosted in dolerites in the Eastern
Goldfields, such as the Argo deposit at St Ives (Gold Fields Ltd).
Figure 9: Cross section through drill traverse #2 at the Bifrost Target with multiple >40ppb zones highlighted.
ASX:VKA | vikingmines.com
9
Figure 10: Chip samples from VKRC0103 and analysis results reported as g/t gold. Broad >50ppb zone of 23m at
0.4g/t Au from 97m with higher grade intercepts of 5m at 1.0g/t Au from 102m and 3m at 1.3g/t Au from 115m with
max grades up to 1.95g/t as annotated.
Bifrost Traverse 3 & 4
Assay results were received for the northern and southern drill traverses (3 & 4) (Figure 11) at
Bifrost. Several broad ppb level zones have been identified in the drilling as well as individual
ppm (g/t) results up to 1.7g/t Au (VKRC0121 from 91m).
Although the tenor of results is lower than that seen in the central two traverses (1 & 2), the
results confirm the presence of regional gold pathways. Given the wide spaced nature of the
drilling, the results have identified further target horizons requiring follow up along strike.
Phase 1 drilling summary
The Company has completed a review of all the RC chips from the Phase 1 programme and
has selected ~200 samples for additional geochemical analysis with the objective of identifying
which of the elevated gold zones contain other pathfinder mineralisation. These results will be
used to inform future sampling and drill planning to assist vectoring towards prospective
structures.
The primary objective of the Phase 1 drill programme was to identify gold bearing pathways
along any of the multiple structural positions interpreted from the airborne magnetics. This
objective has been successfully achieved with highly positive results and the
identification of a new mineralised gold bearing system. This drilling has provided priority
targets for further follow up exploration.
The Company cannot emphasise enough the scale of the Bifrost area being tested (>3.6km)
and the significance of the success of encountering gold at both ppm and ppb levels. With an
aggressive, systematic and effective follow up exploration programme underway we are
focussed on the discovery of new gold deposits.
ASX:VKA | vikingmines.com
10
Figure 11: Map showing the 4 drill traverses at the Bifrost Target with significant results annotated. Note the
substantial distances between the drill traverses. The mineralised zones intercepted in holes VKRC0103, VKRC0083
and VKRC0068 coincide with the first magnetic low horizon west of the Zuleika Shear.
ASX:VKA | vikingmines.com
11
Figure 12: Map showing the 25km strike length of the Zuleika Shear controlled by Viking, the location of known gold
deposits, and the structurally complex geological targets being tested for gold mineralisation. Background image is
1VD-RTP magnetics.
ASX:VKA | vikingmines.com
12
Auger Drilling Results – Bifrost Target8,9
The Company completed an infill auger drilling programme at Bifrost to reduce the sample
spacing from the broad 100m x 400m grid to a 20m x 100m grid. The purpose of this infill
auger sampling was to better define the target anomalies/zones identified in the RC drill
traverses at Bifrost.
During the reporting period, assay results and interpretation were announced for the first 220
samples collected as part of a larger 575 sample infill auger programme completed across
prospective targets defined at Bifrost from Phase 1 drilling. Assays and interpretation of the
remaining 355 samples were announced after the reporting period on 2 April 2025.
The assay results from the initial 220 samples confirmed a large >400m long >40ppb gold
anomaly (Figure 13) which overlaps with a >400m long >30ppm Arsenic anomaly (Figure 14).
Arsenic has been directly associated with the gold intercepts in bedrock drilling via
multielement analysis and is a positive indicator for potential high-grade mineralisation.
Assay results from the remaining 355 samples confirmed a second >300m long gold anomaly
>40ppb, within a larger >700m 20ppb gold anomaly. The anomaly occurs 100m SSE of
drillhole VKRC0103, which returned 23m at 0.4g/t Au, including 5m at 1.0g/t Au and 3m at
1.3g/t Au, with individual 1m samples returning up to 2.0g/t Au. The second anomaly has weak
pathfinder elements associated with the gold of silver, mercury and selenium.
The combination of the gold and pathfinder elements have been used to design the follow up
drill programmes to test both geochemical targets. Drilling was completed as part of the phase
2 drill programme with assays pending and due in the June quarter.
Phase 2 Drill Programme9,10
Viking planned and completed the Phase 2 drill programme within the March quarter, with 50
holes for 5,956m drilled (including one re-entry of VKRC0102). This brings the total activity for
Riverina East to ~13,500m RC drilling in this poorly explored, highly prospective area.
The Phase 2 programme initially commenced on the Central Duplex Target (Figure 12), which
is defined by complex structures observed in the magnetic geophysics and combined with a
large >6km >10ppb near surface gold in auger anomaly.
A substantial arsenic anomaly also flanks the gold anomaly. Based on knowledge gained from
the Phase 1 drill programme at Bifrost and the identified association of arsenic with
mineralisation, the Company interprets this as an further indicator to the potential of this target.
The second part of the Phase 2 drill programme targeted follow up drilling around the results
from the phase 1 drill programme and infill auger drilling results at the Bifrost Target.
All assay results from the Phase 2 programme are pending and expected early May.
8
ASX Announcement 27 March 2025 – Viking Bifrost Auger Results Define Large 400m Gold Target
9
ASX Announcement 2 April 2025 – VKA Bifrost Auger Results Define Second Surface Gold Target
10
ASX Announcement 12 March 2025 – Viking Commences ~6,000M RC Drilling Programme at First Hit
ASX:VKA | vikingmines.com
13
Figure 13: Bifrost target, northern infill auger programme results showing ppb gold contours. Note high >40ppb core
which correlates with results from VKRC0068 and VKRC0083. Blue triangles are planned step out drillholes due to be
completed by early April 2025. Background image is RTP magnetics.
ASX:VKA | vikingmines.com
14
Figure 14: Bifrost target, northern infill auger programme results showing ppm arsenic contours. Note high >100ppm
core with southern edge correlating with results from VKRC0068 and VKRC0083. Blue triangles are planned step out
drillholes due to be completed by early April 2025. Background image is RTP magnetics.
ASX:VKA | vikingmines.com
15
Figure 15: Bifrost target, southern infill auger programme results showing ppb gold contours. Note high >40ppb core
which correlates 100m to the SSE from VKRC0102. Blue triangles are drillholes completed to test the target.
Background image is RTP TDR magnetics.
ASX:VKA | vikingmines.com
16
Figure 16: Map showing the Bifrost Target Area with all auger soil sampling results and phase 2 drilling locations.
Background image is RTP TDR magnetics.
ASX:VKA | vikingmines.com
17
GENERATIVE GOLD EXPLORATION
Viking announced the completion of an auger soil sampling programme at the Canegrass and
Narndee Projects in the Murchison region of Western Australia. The program consisted of 415
auger holes completed on a 400m x 50m grid over ~7km strike at Narndee and a further 250
holes on a 200m x 50m grid over ~1.8km strike at Canegrass.
The areas assessed were targeted due to the presence of regional structures, lack of prior
sampling for gold and, at Narndee, the presence of gold discovered by prospectors11 since
Viking has held the tenure. The Company has no additional information on the nuggets
collected other than the location, quantity and weight as reported by the prospectors to the
Department of Energy, Mines, Industry Regulation and Safety who subsequently report this
information to Viking Mines.
The Company anticipates results soon with planning for the next phase of exploration
dependent on results.
Figure 17: Narndee Project – Viking auger sampling Locations and reported prospector finds with GSWA geology
map background Coolamaninu Sheet 2540. Note regional mapped structure (black dashed line) aligning with
prospector gold finds and target of auger sampling programme.
11
Pursuant to a Section 40E permit of the Mining Act 1978 (WA).
ASX:VKA | vikingmines.com
18
CANEGRASS BATTERY MINERALS PROJECT
No fieldwork was carried out on the project in the reporting period.
CORPORATE
Dr Julian Stephens was appointed to the Board of Directors, as Non-Executive Director,
effective 11 March 2025.12 Mr Michael Cox stepped down as a Non-Executive Director,
effective 31 March 2025.
The Company held a General Meeting of Shareholders on 12 February 2025, where all
resolutions were passed.
The Company has a strong cash position of $3.4M as of 31 March 2025.
The Company’s cash position realised a net decrease of $1.4M over the December 2024
quarter Appendix 5B cashflow report.
As set out in section 6 of the attached Appendix 5B, the Company made payments to related
parties of the entity of $150k in the quarter ending 31 March 2025. This amount comprised
Director fees for the relevant period.
The Company advises that in accordance with the requirements of ASX Listing Rule 5.3, the
Company’s expenditure for the quarter predominantly related to:
• $1,108k: Exploration expenditure on the Company’s Projects, primarily relating to
costs associated with the commencement of the Fist Hit drilling programme,
consulting fees associated with the First Hit MRE and metallurgical testwork at
Canegrass.
• $192k: General corporate and administration costs, including half year audit fees,
ASX listing fees and annual software costs.
• $148k: Director fees and staff costs.
• $89k gain was made due to bank interest, GST rebates and tax incentives.
Other than as set out in this report, the Company undertook no other substantive exploration,
mining production and development activities during the quarter.
JUNE QUARTER PLANNED ACTIVITIES
The Company continues to primarily focus on progressing exploration activities across Riverina
East Project while also appropriately advancing the Canegrass and Narndee Projects.
• Obtain all assay results from the Phase 2 Drilling at Riverina East.
• Complete data review and interpretation of results and plan Phase 3 exploration
activities.
• Complete First Hit UG Mining Assessment.
12
ASX Announcement 12 March 2025 – Viking Board Changes
ASX:VKA | vikingmines.com
19
CORPORATE OPPORTUNITIES
The Company continues to review and conduct due diligence on a vast array of mineral
acquisition opportunities, to complement the Company’s existing project portfolio, with the
objective of acquiring mature exploration assets with the potential to deliver long-term
shareholder returns. Should any of these acquisition opportunities progress the Company will
provide an update to the market.
-ENDThis announcement has been authorised for release by the Board of the Company.
Julian Woodcock
Managing Director and CEO
Viking Mines Limited
For further information, please contact:
Viking Mines Limited
Michaela Stanton-Cook - Company Secretary
contact@vikingmines.com
Forward-Looking Statements
This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning
Viking Mines Limited’s planned exploration program and other statements that are not historical facts. When used in this document, the
words such as "could," "plan," "estimate," "expect," "intend," "may”, "potential," "should," and similar expressions are forward-looking
statements. Although Viking Mines Limited believes that its expectations reflected in these forward-looking statements are reasonable, such
statements involve risks and uncertainties and no assurance can be given that actual results will be consistent with these forward-looking
statements.
Competent Persons Statement – Exploration Results
Information in this release that relates to Exploration Results is based on information compiled by Mr Julian Woodcock, who is a Member
and of the Australian Institute of Mining and Metallurgy (MAusIMM(CP) – 305446). Mr Woodcock is a full-time employee of Viking Mines Ltd.
Mr Woodcock has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the
activity being undertaken to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves’. Mr Woodcock consents to the disclosure of the information in this report in the
form and context in which it appears.
Competent Persons Statement – Mineral Resource Estimate
The information in this announcement that relates to the Mineral Resource estimate is derived from information compiled by Mr Dean
O’Keefe, a Fellow of the Australasian Institute of Mining and Metallurgy (AusIMM, #112948), and Competent Person for this style of
mineralisation. Mr O’Keefe is a consultant to Viking Mines Limited, and is employed by MEC, an independent mining and exploration
consultancy. Mr O’Keefe has sufficient experience relevant to the style of mineralisation and type of deposit under consideration and to the
activity which he is undertaking to qualify as Competent Person as defined in the 2012 edition of the Australasian Code for the Reporting of
Exploration Results, Mineral Resources, and Ore Reserves (JORC Code). The Competent Person is not aware of any new information or
omission of data that may materially affect the stated Mineral Resource estimate.
Competent Persons Statement – Metallurgical Results
The information contained in this report, relating to metallurgical results, is based on, and fairly and accurately represent the information and
supporting documentation prepared by Mr Damian Connelly. Mr Connelly is a full-time employee of METS Engineering who are a Contractor
to Viking Mines Ltd, and a Fellow of The Australasian Institute of Mining and Metallurgy. Mr Connelly has sufficient experience which is
relevant to the style of mineralisation and type of deposit under consideration, and to the activity being undertaken to qualify as a Competent
Person as defined in the 2012 Edition of the Australasian Code for Reporting of Exploration Results, Exploration Targets, Mineral Resources
and Ore Reserves. The Company confirms that the form and context in which the Competent Person’s findings are presented have not been
materially modified from the original market announcement.
ASX:VKA | vikingmines.com
20
APPENDIX 1 – TENEMENTS HELD OR WITH AN AGREEMENT TO ACQUIRE
AN EQUITY INTEREST AS AT 31 DECEMBER 2024
Project
Licence
name
Location
License
type
Licence Holder/ JV
Partners i
Viking
Ownership/
Involvement
Granted
To
Comments
ii
M30/0091
M30/0099
P30/1144
Riverina East Project
P30/1137
E29/1133
E30/0529
P29/2652
E29/1289
Western
Australia
P30/1162
P30/1163
E29/1131
E30/0570
E30/0571
E30/505
E30/0517
P58/1943
E58/0604
Canegrass Project
E58/0619
E58/0621
E59/2902
E59/2950
Western
Australia
E58/0232
E58/0236
E58/0282
E58/0520
E58/0521
E58/0522
Narndee
Project
E59/2864
E59/2865
E59/2866
E59/2867
i)
ii)
Western
Australia
Mining
Licence
Mining
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Prospecting
Licence
Exploration
Licence
Prospecting
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Prospecting
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Exploration
Licence
Red Dirt Mining Pty Ltd
100%
15 Mar 32
Red Dirt Mining Pty Ltd
100%
26 Dec 32
Red Dirt Mining Pty Ltd
100%
26 Feb 28
Red Dirt Mining Pty Ltd
100%
16 Jul 27
Viking Mines Ltd
100%
04 Jan 27
Viking Mines Ltd
100%
20 Feb 27
Viking Mines Ltd
100%
18 Oct 26
Viking Mines Ltd
100%
To be
granted
Viking Mines Ltd
100%
03 Dec 27
Viking Mines Ltd
100%
03 Dec 27
Viking Mines Ltd
100%
30 Apr 29
Viking Mines Ltd
100%
03 Feb 30
Viking Mines Ltd
100%
To be
granted
Viking Mines Ltd
95%
06 Jun 29
Baudin Resources Pty Ltd.
0%
29 Jul 25
Viking Critical Minerals Pty Ltd
100%
28 Mar 27
Viking Critical Minerals Pty Ltd
100%
25 Oct 28
Viking Critical Minerals Pty Ltd
100%
27 Oct 29
Viking Critical Minerals Pty Ltd
100%
03 Dec 29
Viking Critical Minerals Pty Ltd
100%
19 Sep 29
Viking Critical Minerals Pty Ltd
100%
10 Mar 30
100%
28 Jul 25
100%
21 Mar 25
100%
02 May 25
100%
13 Sep 27
100%
13 Sep 2
Share your feedback
Discover