Annual Report to Shareholders
Released
Released
Announcement PDF
2023
Annual Report
Year ending 30 June 2023
ASX:VKA
ABN 38 126 200 280
Corporate
Directory
Directors
Auditor
Mr Charles Thomas - Non-Executive Chairman
BDO Audit (WA) Pty Ltd
Mr Julian Woodcock - Managing Director and CEO
Level 9, Mia Yellagonga Tower 2, 5 Spring Street, Perth
WA 6000
Mr Michael Cox - Non-Executive Director
Registered Office and Principal
Place of Business
Solicitors
15-17 Old Aberdeen Place, West Perth WA 6005
Level 48 152-158 St Georges Terrace, Perth WA 6000
Telephone: +61 8 6245 0870
Share Register
Automic Pty Ltd
Level 5, 191 St Georges Terrace, Perth WA 6000
Telephone: 1300 288 664 (within Australia)
Telephone: +61 2 9698 5414 (outside Australia)
Email: hello@automic.com.au
Hamilton Locke
Stock Exchange Listing
Viking Mines Limited shares are listed on the Australian
Securities Exchange (ASX: VKA)
Website
www.vikingmines.com
Corporate Governance Statement
The Corporate Governance Statement can be found on
the Company's website:
www.vikingmines.com/corporate-governance
Contents
Chairman’s Letter
2
Review of Operations
3
Directors' Report
17
Auditor's Independence Declaration
29
Consolidated Statement of Profit or Loss
and Other Comprehensive Income
31
Consolidated Statement of Financial Position
32
Consolidated Statement of Changes in Equity
33
Consolidated Statement of Cash Flows
34
Notes to the Financial Statements
35
Directors Declaration
52
Independent Auditor's Report to the
Members of Viking Mines Limited
53
Annual Mineral Resource and Ore Reserves Statement
57
Shareholder Information
58
Tenement Schedule
61
Chairman’s
Letter
Dear Viking Mines shareholders,
It is with great pleasure that I present the 2023 Annual Report for Viking Mines
Limited (ASX: VKA) (Viking or the Company).
The Company had a successful year following
the signing of a binding agreement to earn
up to 99% of the Canegrass Battery Minerals
Project (Canegrass or the Project) located in
the Murchison Region of Western Australia. The
Project represents a value accretive transaction
for the Company and its shareholders to invest
in an established project with a substantial
Mineral Resource Estimate already defined.
Following the announcement of the Farmin agreement in November of last year, the
Company has spent the remainder of the year
advancing exploration activities to verify the
current Inferred Mineral Resource Estimate of
79Mt at 0.64% V 2O 5 , 29.7% Fe and 6.0% TiO2 and
to test for extensions.
Viking completed a number of predrilling
exploration activities, which included multiple
field visits to map the outcropping Vanadiferous
Titanomagnetite and to take rock chip samples
for analysis. The Company also completed a
ground magnetic survey, which covered the 9km
strike length of VTM horizon. The purpose of
these exploration activities was to determine an
Exploration Target Estimate in the lead up to the
drilling campaign.
2 | V I K I NG M I NE S LT D
Once heritage survey clearance was completed
Viking commenced an extensive 7,500m drilling
campaign which, subsequent to the reporting,
period has returned shallow, thick and highgrade vanadium mineralisation across the
project area. Importantly, results from the Kinks
South target sit outside of the current Mineral
Resource Estimate, providing an excellent
opportunity to grow this already substantial
Resource.
It has been extremely pleasing as Chairman
to witness the Company’s progress over the
year. Your continued support throughout the
2023 Financial Year is greatly appreciated, and
I strongly believe the Company will be able to
increase value for its shareholders in the year
ahead. I would also like to thank my fellow
Directors for their contribution during the
past year.
Yours Sincerely,
Charles Thomas
Non-Executive Chairman
Review of
Operations
The 2023 Financial Year was a
significant year for the Company as
it refocussed its strategy and entered
into a binding agreement to earn up to
99% of the Canegrass Battery Minerals
Project (Canegrass or the Project), with
a primary commodity of vanadium.
The Project already has a defined inferred JORC
(2012) Inferred Mineral Resource Estimate (MRE)
of 79Mt at 0.64% V 2O 5 , 29.7% Fe and 6.0% TiO2 .
Following a thorough due diligence process,
it was determined that there is a substantial
exploration potential to discover and define
additional resources outside the current limits
of the estimated MRE.
The focus for the Company for the remainder
for the second half of the financial year was
to advance exploration activities across the
Canegrass Battery Minerals Project.
2023 ANNUAL REP ORT
|
3
Canegrass Battery
Minerals Project
The Company announced on 30 November 2022
the successful signing of a binding agreement
between Viking Critical Minerals Pty Ltd, a
wholly owned subsidiary of Viking Mines Ltd,
and Flinders Canegrass Pty Ltd, a wholly owned
subsidiary of Red Hawk Mining Ltd (ASX:RHK)
(formerly Flinders Mines Ltd (ASX:FMS)).
Under the terms of the agreement, Viking
can earn up to 99% of the Canegrass Battery
Minerals Project (“Canegrass Project”) via a
Farm-In Arrangement (“FIA“), with the remaining
1% attainable with milestone and production
related payments. The Project is located in
the Murchison Region, 620km north-east of
Perth, Western Australia and 60km SE from the
township of Mt Magnet.
The Canegrass Projects’ primary commodity
is Vanadium (as Vanadium Pentoxide – V 2O 5)
and contains a substantial JORC (2012) Inferred
Resource of 79Mt at 0.64% V 2O 5 (Table 1). Nickel,
Copper and Cobalt are reported within the
drilling data which has not previously been
estimated into the MRE and will be assessed
and investigated by Viking for its potential.
Table 1 – Canegrass Project Vanadium Mineral Resource estimate, 0.5% V 2O 5 cut-off grade, >210m RL (due to the
effects of rounding, the total may not represent the sum of all components
Deposit
JORC
Classification
Tonnage
(Mt)
V 2O5 %
Fe %
TiO2 %
Al 2O3 %
P%
SiO2 %
LOI %
Fold Nose
Inferred
59
0.66
30.5
6.5
11.9
0.006
22.9
2.9
Kinks
Inferred
20
0.57
27.4
5.5
13.0
0.009
25.9
3.1
79
0.64
29.7
6.0
12.2
0.007
23.6
3.0
Total
Field Visit – Farm-In Due Diligence
The Company announced on 5 January 2023, that it had successfully completed the 30-day Due
Diligence to its satisfaction, a condition precedent to the FIA 2 .
As part of the Due Diligence process, Viking undertook a 5-day field visit to the Project.
The field visit identified outcropping VTM units at the locations with historical rock chip samples over
a strike length of 8km (Figure 1) at the Project which have been shown to contain high grade V2O 5 up to
1.7% 3 . These results indicated that only a small portion of the prospective horizon had been effectively
explored and that substantial upside remains to grow the Resource.
1
ASX Announcement Viking Mines (ASX: VKA) 30 November 2022 – Viking to Farm-in to Substantial Battery Mineral Resource
2
ASX Announcement Viking Mines (ASX: VKA ) 5 January 2023 – VKA Confirms 8km Trend of VTM Outcrop & Commences Farm-In
4 | V I K I NG M I NE S LT D
Review of Operations
Initial Drilling Campaign
The Company successfully and safely completed an initial Reverse Circulation (RC) drill program
totalling 6 holes for 543m at Canegrass. Significantly, 17m of massive magnetite VTM mineralisation
was intersected at the estimated target depth in hole VCRC0006 along with multiple magnetite
bearing horizons in hole VCRC0005 3 .
Assays received by the Company confirmed thick, high grade Vanadium rich zones at the interpreted
target depths in hole VCRC00063
•
17m at 0.98% V 2O 5 from 89m, including 12m at 1.06% V 2O 5 from 91m
•
19m at 0.61% V 2O 5 from 52m, including 6m at 0.88% V 2O 5 from 65m
Furthermore, substantial elevated copper, nickel and cobalt values were identified within the hole.
Significant intercepts of these additional battery metals include:
•
17m at 590ppm Cu, 814ppm Ni and 190ppm Co from 89m
•
12m at 1281ppm Cu, 766ppm Ni and 122ppm Co from 65m including;
•
6m at 0.20% Cu from 70m with a Peak copper value of 0.31% Cu
Figure 1 – Cross section through Kinks South target showing drilling results in hole VCRC0006 and projected target
zones.
Ground Magnetics Survey
The Company engaged geophysical consultants, Planetary Geophysics Pty Ltd, to undertake a 16km2
ground magnetic survey at Canegrass.
Significant improvements in the resolution of the magnetic anomaly maps has been achieved when
comparing the previous airborne data to the new ground magnetics data. This improvement is due
to the higher sampling frequency occurring along the lines walked during the data collection and the
magnetic sensor being closer to the ground, as opposed to the older open-source data, which was
collected using an airborne survey flying ~20m above the surface.
Subsequent processing of the data was completed to produce a magnetic inversion model which was
utilised in the planning and targeting the magnetite horizons at Canegrass 4 .
3
ASX Announcement Viking Mines (ASX: VKA) 20 March 2023 – Viking Drills 17m of Massive Vanadiferous Titanomagnetite
4
ASX Announcement Viking Mines (ASX:VKA) 21 February 2023 – Viking Commences Ground Magnetics Survey at Canegrass
2023 ANNUAL REP ORT
|
5
Review of Operations
Figure 2: Comparison images showing improvement in resolution of magnetics data achieved through collection
of Ground Magnetics at the Canegrass Project. Top image (A) is composite image of opensource magnetics data
collected at 40m spacings and 20m fly height. Bottom image (B) is ground magnetics data collected on variable 20m
and 40m line spacings and ~3m collection height, merged with opensource data. Both images are presented as Total
Magnetic Intensity, Reduced to Pole (TMI-RTP) (ASX Announcement 5 April 2023).
6 | V I K I NG M I NE S LT D
Review of Operations
Exploration Target Estimate:
The Company completed an Exploration Target Estimate (“ETE”) for the Canegrass Project
by consolidating the data obtained through field mapping, geophysical modelling and drilling
observations. The ETE has been completed across six contiguous target areas across the Project as
shown in Figure 3. The ETE is located outside of the existing extent of the Mineral Resource Estimate
(refer to Figure 3). A summary of the respective targets is given below in Table 1. The total ETE is
calculated to be in the range of:
144Mt to 192Mt at 0.45% to 0.99% V2O5 for 1.44 to 4.19 Billion Pounds V2O55
The potential quantity and grade of mineralisation of the ETE at the Canegrass
Project is conceptual in nature, there has been insufficient exploration to
estimate a Mineral Resource and it is uncertain if further exploration will
confirm the target ranges.
The ETE has been generated by following a process to determine potential ranges of tonnes and
grades at a series of exploration targets, with the calculations used by the Company to direct
the strategy to drill test targets at the Project. The following sections outline the process used to
derive the ETE.
Table 2 – Summary of Exploration Target Estimate by Target Area
Exploration Target
Estimate Area
5
Million Tonnes
Grade V 2O 5 %
Billion Pounds V 2O 5
Lower
(SG 3)
Upper
(SG4)
Lower
Upper
Lower
Upper
Fold Nose South Extension
52.8
70.3
0.43%
1.07%
0.50
1.66
Fold Nose North Extension
11.2
15.0
0.43%
1.07%
0.11
0.35
Fold Nose to Kinks South
26.9
35.8
0.45%
1.06%
0.26
0.83
Kinks South
23.1
30.8
0.46%
1.04%
0.24
0.71
Kinks West Extension
1.7
2.2
0.57%
0.88%
0.02
0.04
Kinks North Extension
28.4
37.8
0.50%
0.71%
0.32
0.59
Total
144.0
192.0
0.45%
0.99%
1.44
4.19
ASX Announcement Viking Mines (ASX:VKA) 14 June 2023 – VKA Defines Substantial Upside Growth Potential at Canegrass
2023 ANNUAL REP ORT
|
7
Review of Operations
Figure 3 – Map showing the targets which comprise the Exploration Target Estimate and the respective
estimate ranges. Note planned drilling which is underway at the project is shown as white triangles and all
historical drilling as indicated by the legend (refer ASX announcement 14 June 2023).
Major 7,500m Drilling Programme
At the end of the financial year, the Company commenced with and subsequently completed a major
drill programme at the Canegrass Battery Minerals Project, comprised of ~44 Reverse Circulation (RC)
drillholes, totalling ~7,500m. The drill programme had two main objectives.
1. To improve the confidence in the current Mineral Resource Estimate (MRE) by drill testing within the
existing Inferred (JORC 2012) MRE limits of 79Mt at 0.64% V 2O 51 to validate and improve the existing
geological interpretation.
2. To grow the Mineral Resource base through discovery of new Vanadiferous Titanomagnetite (VTM)
mineralisation by drill testing targets outside of the limits of the current MRE.
Subsequent to the reporting period the Company received results from the Kinks south target and the
Kinks deposit confirming substantial zones of high-grade vanadium mineralisation.
8 | V I K I NG M I NE S LT D
Figure 4 – Drill Rig at the Canegrass
Battery Minerals Project
Kinks South Target
Drilling at the Kinks South target has returned multiple and consistent, thick zones of vanadium
mineralisation (reported as V 2O 5) along a 1.5km strike length.
The Kinks South target does not form part of the current MRE and presents a substantial opportunity
for the Company to grow the mineral resource base, specifically targeting a high-grade component
>30Mt >0.9% V 2O 5 . Significant intercepts include: 6
•
6
VCRC0011: 38m at 0.76% V 2O 5 (>0.5%) from
114m, including:
15m at 0.95% V 2O 5 (>0.8%) from
118m &
7m at 0.98% V 2O 5 (>0.8%) from
145m
15m at 0.72% V 2O 5 (>0.5%) from
160m, including:
10m at 0.92% V 2O 5 (>0.8%) from
165m
•
VCRC0007: 46m at 0.55% V 2O 5 (>0.5%) from
68m, including:
12m at 0.82% V 2O 5 (>0.8%) from
88m
•
VCRC0008: 16m at 0.57% V 2O 5 (>0.5%) from
110m, including:
12m at 1.02% V 2O 5 (>0.8%) from
110m
•
VCRC0010: 34m at 0.57% V 2O 5 (>0.5%) from
43m, including:
12m at 0.96% V 2O 5 (>0.8%) from
61m
ASX Announcement Viking Mines (ASX: VKA) 21 August 2023 – Viking Discovers Extensive Vanadium System at Kinks South
2023 ANNUAL REP ORT
|
9
Review of Operations
Figure 5 – Map of the Kinks South target area showing V 2O 5 assay results from Vikings 2023 drilling programmes.
Intercepts are reported above a 0.5% V 2O 5 cut-off, with included intercepts (where reported) >0.8% V 2O 5 cutoff. Composite intercepts have been derived for zones>6m width, reporting above minimum cut-off grade and
a maximum of 6m consecutive internal waste zones. Intervals reported are downhole lengths and the true
widths are not known. VCRC0006 previously reported in ASX release 18 April 2023.
Elevated values of Cu, Ni and Co have been
intersected, with Cu being the most significant
throughout the results received. Copper
mineralisation is directly associated with the
VTM mineralisation, but also extends below
and above the target horizons.
Further work is required to understand the
significance of the Copper mineralisation
and association with the VTM mineralisation,
however the Company is encouraged as the
presence of these highly anomalous values
indicates significant copper is present in the
mineralised system and leads to the potential
for further enriched zones to be identified.
Whilst not the primary commodity of focus for
the Project, if sufficient Cu, Ni and Co reports
to the tail in the magnetic concentrate process,
a sulphide flotation could potentially be
undertaken to recover these additional minerals
to the benefit of the Project. This process route
will be further investigated by the Company.
•
VCRC0010: 56m at 0.14% Cu, 640ppm Ni &
123ppm Co from 52m
10 | V I K I NG M I NE S LT D
•
VCRC0012: 37m at 0.10% Cu, 827ppm Ni &
162ppm Co from 99m
•
VCRC0018: 18m at 0.12% Cu, 812ppm Ni &
178ppm Co from 12m
Kinks South Target
The completed drilling included seven holes at
the Kinks MRE target area for 1,099m, testing the
higher-grade western and lower-grade eastern
blocks within the Kinks MRE target area. The
drilling had two primary objectives:
1. Test for continuity of the target Vanadiferous
Titanomagnetite (VTM) horizon in the >0.6km
long western block of the MRE, identified
in outcrop mapping and seen in historical
high-grade drillholes (not yet used to update
the MRE) with the objective of extending the
mineralised horizons to surface and to the
west of the current MRE limits into the Kinks
West Extension Exploration Target Estimate
(ETE) area.
Review of Operations
2. Test the continuity of the VTM in the
>0.8km strike lower grade eastern block
and determine the style and grade of
mineralisation to the east of the interpreted
fault that bisects the deposit and identify
any marker horizons that may assist in
the interpretation of the geology and
mineralised offsets as a result of the
faulting observed.
Elevated values of Cu, Ni and Co have been
intersected, with Cu being the most significant
throughout the results received. Copper
mineralisation is directly associated with the
VTM mineralisation and tends to occur within
approximately the same intervals as the V 2O 5 .
Consistent elevated values for copper have
been seen throughout the drilling and ranges
between 0.06% to 0.1%.
Significant Vanadium Pentoxide (V 2O 5)
intercepts from the program include:7
Further work is required to understand the
significance of these results and association
with the VTM mineralisation, however the
Company is encouraged as the presence
of these highly anomalous values indicates
significant copper is present in the mineralised
system and leads to the potential for further
enriched zones to be identified
•
VCRC0021: 40m at 0.75% V 2O 5 (>0.5%) from
202m, including:
27m at 0.83% V 2O 5 (>0.8%) from
203m
•
VCRC0019: 38m at 0.70% V 2O 5 (>0.5%) from
96m, including:
15m at 0.86% V 2O 5 (>0.8%) from
101m
•
VCRC0020: 12m at 0.66% V 2O 5 (>0.5%) from
51m, including:
6m at 0.86% V 2O 5 (>0.8%) from
54m
•
VCRC0019: 42m at 0.08% Cu, 573ppm Ni &
162ppm Co from 97m
•
VCRC0021: 35m at 0.07% Cu, 609ppm Ni &
188ppm Co from 202m
•
VCRC0018: 13m at 0.10% Cu, 602ppm Ni &
138ppm Co from 51m
Figure 6 – Map of the Kinks Deposit and the Kinks West Extension ETE target area showing V 2O 5 assay results
from Vikings 2023 drilling programmes. Intercepts are reported above a 0.5% V 2O 5 cut-off, with included
intercepts (where reported) >0.8% V 2O 5 cut-off. Composite intercepts have been derived for zones>6m width,
reporting above minimum cut-off grade and a maximum of 6m consecutive internal waste zones. Intervals
reported are downhole lengths and the true widths are not known. Note historical drillhole results which have
not yet been incorporated into the MRE for the Kinks deposit (orange callouts) and results currently informing
the MRE (white callouts).
7
ASX Announcement Viking Mines (ASX:VKA) 24 August 2023 – Viking Hits High-Grade at Kinks – 40m at 0.75% V2O5
2023 ANNUAL REP ORT
|
11
Review of Operations
Figure 7 – Map of the Fold Nose Deposit showing V 2O 5 assay results from Vikings 2023 drilling programmes.
Intercepts are reported above a 0.5% V 2O 5 cut-off, with included intercepts (where reported) >0.8% V 2O 5 cutoff. Composite intercepts have been derived for zones>6m width, reporting above minimum cut-off grade and
a maximum of 6m consecutive internal waste zones. Intervals reported are downhole lengths and the true
widths are not known. Note historical drillhole results which have not yet been incorporated into the MRE for
the Fold Nose deposit (orange callouts) and results currently informing the MRE (white callouts).
Fold Nose Deposit
The Company drilled eight target areas
focused on extending and growing the already
substantial Inferred Mineral Resource Estimate
(MRE) of 79Mt at 0.64% V 2O 5 estimated at the
Fold Nose and Kinks deposits.
Drilling at the Fold Nose MRE target area has
returned thick high-grade zones of vanadium
mineralisation (reported as V 2O 5) both within
and external to the current MRE limits. In
addition, the results correlate with historical
drilling, which has occurred since the last
MRE update and has not yet been included
into the Mineral Resource (Figure 1). Further,
mineralisation remains open to the West.
Selected significant V 2O 5 intercepts from the
recent program and located within the current
Fold Nose MRE limits include.
12 | V I K I NG M I NE S LT D
•
VCRC0027: 42m at 0.74% V 2O 5 (>0.5%) from
79m, including:
17m at 0.80% V 2O 5 (>0.8%) from
83m &
8m at 0.99% V 2O 5 (>0.8%) from
108m
•
VCRC0026: 3 8m at 0.72% V 2O 5 (>0.5%) from
138m, including:
26m at 0.82% V 2O 5 (>0.8%) from
140m
•
VCRC0031: 24m at 0.81% V 2O 5 (>0.5%) from
96m
Additional significant Vanadium Pentoxide
(V 2O 5) intercepts from the recent program and
located outside the current Fold Nose MRE limits
include:
Review of Operations
•
VCRC0035: 20m at 0.52% V 2O 5 (>0.5%) from
21m &
24m at 0.71% V 2O 5 (>0.5%) from
201m, including:
14m at 0.87% V 2O 5 (>0.8%) from
202m
•
VCRC0036: 2 2m at 0.53% V 2O 5 (>0.5%) from
21m, including:
6m at 0.91% V 2O 5 (>0.8%) from
35m
•
VCRC0038: 14m at 0.58% V 2O 5 (>0.5%) from
4m
In addition to the substantial Vanadium grades
received, there has also been an associated
increase in the Iron and Titanium grades above
the MRE average grade of 30.5% Fe and 6.5%
TiO2 seen within the high-grade vanadium
intercepts (>0.8% V 2O 5). Key intersections
include:
•
VCRC0035: 14m at 39.2% Fe & 8.7% TiO2 from
202m
•
VCRC0026: 2 6m at 37.2% Fe & 8.0% TiO2 from
140m
•
VCRC0031: 23m at 35.1% Fe & 7.3% TiO2 from
97m
•
VCRC0026: 8 m at 42.5% Fe & 8.7% TiO2 from
108m
Metallurgical Testwork
36 samples were collected from hole VCRC0006
and submitted to ALS metallurgy for Davis
Tube Wash (DTW) testwork with a target
P80 75-micron grind to ascertain recovery of
Vanadium by magnetic separation methods.
High recoveries of 90.9% were achieved for the
main interval of 17m at 0.98% V 2O 5 , with the
concentrate grading 1.44% V 2O 5 , 60.3% Fe, 10.6%
TiO2 , 1.13% SiO2 and 1.72% Al2O3 and a high mass
recovery of 59.6%.9
Mass recoveries for all samples averaged 45.7%
by weight which is significantly higher than
typical titaniferous magnetite deposits (30%
Wt). This will lead to improved economics when
processing this ore compared to other ores
where the yield is typically 30% by weight.
9
The elevated Fe and TiO2 grades are associated
with the massive magnetite bands observed in
the drilling and there is the opportunity to see
an increase in the average grade when correctly
domaining these zones within the MRE update.
Elevated values of Cu, Ni and Co have been
intersected through the drilling at Fold Nose,
FNE and FSE, with Cu being the most significant
throughout the results received. Copper
mineralisation is both directly associated with
the VTM mineralisation and tends to occur
within approximately the same intervals as the
V 2O 5 and in separate horizons outside of the
massive VTM mineralisation.
•
VCRC0035: 2 3m at 0.07% Cu, 531ppm Ni &
149ppm Co from 21m &
12m at 0.07% Cu, 688ppm Ni &
196ppm Co from 201m, &
17m at 0.15% Cu, 622ppm Ni &
106ppm Co from 275m
•
VCRC0032: 1 5m at 0.08% Cu, 504ppm Ni &
97ppm Co from 53m &
12m at 0.14% Cu, 702ppm Ni &
138ppm Co from 138m
Testwork Summary
•
The DTW testwork has demonstrated that a
high-quality magnetic concentrate can be
produced from the VTM mineralisation at the
Canegrass Project.
•
Low levels of Al2O3 and SiO2 provide a
positive indication that a suitable feed for
roasting can be produced to produce a V 2O 5
flake with further testwork required.
•
High-grade iron values in the concentrate
demonstrate the opportunity to investigate
producing an iron/magnetite concentrate for
direct shipping.
•
The confirmation of Cu, Ni and Co reporting
at various recoveries to the non-magnetic
tail confirms future potential to recover this
additional battery mineral and that more
testwork is required.
•
The mass yields were typically 45% by weight
indicating the samples were fresh. Oxidised
or weathered samples would produce much
lower yields.
•
Vanadium recovery remains consistent
throughout hole VCRC0006 in zones of
massive magnetite.
ASX Announcement Viking Mines (ASX: VKA) 4 August 2023 – Viking Achieves Exceptional Vanadium Recoveries up to 99.3%
2023 ANNUAL REP ORT
|
13
Review of Operations
Farm-In Agreement Status
Table 3 below outlines the schedule of the Farm-In Agreement (FIA), as announced on 30 November
2022, and Table 4 details the production and milestone related payments for consideration of the
remaining 1% of the Project.
As of 31 July 2023, Viking has spent a total of $1.28 million on the Project and initiated completion of the
1st stage of the farm-in and now holds 25% of the Project. The spend in excess of $1 million required for
Stage 1 contributes directly towards Stage 2 of the FIA.
As such Viking are required to spend $0.72M over the next 12 months to achieve completion of Stage 2
to acquire a further 24% interest in the Project.
Table 3 – Farm-In Agreement terms for Viking to acquire up to 99% of the Canegrass Battery Minerals Project.
Duration
(months)
Stage Equity
Earned
(VKA)
Cumulative
Equity
Earned (VKA)
$0
1
0%
0%
Complete
$225,000
$1,000,000
18
25%
25%
Complete
Stage 2
earn-in
$275,000
$1,000,000
12
24%
49%
In Progress
Stage 3
earn-in
$325,000
$1,000,000
12
26%
75%
Stage 4
earn-in
$375,000
$1,000,000
12
24%
99%
Total
$1,250,000
$4,000,000
Item
Cash Payment at
completion of each
stafe
Exploration
Spend
Signing of
agreement
$50,000
Stage 1
earn-in
54
-
Status
-
Table 4 – Production and milestone related payments in consideration for the remaining 1% of the Canegrass Battery
Minerals Project after Viking complete stages 1-4 of the JV Farm-In Agreement.
Period
$ payment on annual anniversary of 1 st production
$ Total
Grant of Mining Lease
$100,000
$100,000
Years 1-3
$50,000
$150,000
Years 4-6
$75,000
$225,000
Years 7-9
$90,000
$270,000
Years 10
$100,000
$100,000
Total
10
$845,000
ASX Announcement Viking Miens (ASX:VKA) 16 August 2023 – Viking Proceeds to Stage 2 of Canegrass Project Farm-In
14 | V I K I NG M I NE S LT D
Review of Operations
Ghana
Akoase Gold Project
At the court hearing held on 24 January 2023,
the High Court of Ghana (Commercial Division)
made a judgement which determined that
the purchasers of the Akoase Project, namely
Akoase Resources Limited, BXC Company
Ghana Limited and Cheng Yi (Defendants) are
liable to pay the full royalty on 50,000 ounces
of gold produced at a rate of US$40/oz, totalling
US$2M. In addition, costs of Ghana Cedis
(GHS) 1.2M were awarded to Vikings subsidiary
Resolute Amansie Limited (RAL)11 .
Figure 8 – Map showing Viking 100% tenure and
tenement under option with Encounter Resources at
the First Hit Project.
First Hit Gold Project
The Company’s First Hit Project (First Hit Project)
is located 50km west of Menzies in the Western
Australia Goldfields. Limited exploration activity
was undertaken on the First Hit Project during
the reporting period with the primary focus
being on the Canegrass Project.
The Company continued with its assessment
of the results from the three phases of drilling,
totalling 15,000m that had been undertaken at
the First Hit Project. As the Company continues
with its identification of exploration targets and
its review of gold and potential lithium targets,
it maintains the tenement in good standing with
all statutory reporting being completed and
lodged.
Interest at a rate of 5% APR was also determined
to be calculated on the royalty at the dates
which the court ascertained the royalty was
due. The dates stipulated by the court are 1
June 2022 for 33,000oz of gold produced (date
of the site visit by the independent expert) and
24 January 2023 for 17,000oz of gold produced
(date of the ruling of the Court). An entry of
judgement received from the Court on 13 March
2023 recorded the Defendants were liable to
pay US$2.78M (AUD4.2M) plus costs of GHS 1.2M
(AUD160K).
RAL received payment of US$713k (AUD1.051M)
and GHS1.2M (AUD160K) before the end of the
reporting period 12 . The payments are considered
by the Company to be respectively towards the
outstanding overdue payments and interest
from the sale of the Akoase Gold Project, and
the court ruled costs of GHS1.2M (AUD160K). The
Company continued to pursue the remaining
balance of the monies owed using our legal
team in Ghana.
A settlement payment of US$2.12M (A$3.25M)
was received after the end of the reporting
period which the company has accepted as full
and final payment.13
After the end of the reporting period, a small
drill programme was completed on the Emerald
Prospect tenement E30/1137. 5 drillholes for
307 metres were drilled targeting northern
extensions from the Emerald Gold Mine. No
significant intersections were received, however
low-level gold anomalism was identified,
possibly indicating the northern continuation of
the structure.
The company is currently planning an
exploration programme for the First Hit project
tenements which is scheduled to take place in
H1 FY24.
11
ASX Announcement Viking Mines (ASX:VKA) 30 January 2023 – VKA Succeeds in Ghana Legal Claim with greater than A$4M Due
12
ASX Announcement Viking Mines (ASX:VKA) 26 April 2023 – Viking Receives $1.14M from Ghana with $3.19M Debt Remaining
13
ASX Announcement Viking Mines (ASX:VKA) 25 September 2023 - Viking Receives $3.3m Final Settlement in Ghana Litigation.
2023 ANNUAL REP ORT
|
15
Review of Operations
Business
Development
The Company entered into a significant
transaction in the year to acquire the Canegrass
Battery Minerals Project. This is a product of
ongoing business development activities where
the Company seeks to identify, review and
asses
Share your feedback
Discover